← London Borough of Barnet

Status

Pending Decision New housing
Received
17 Dec 2024
New homes
26

Full proposal

Redevelopment of the site to provide a 6-storey building comprising 26 residential dwellings (Use Class C3) with car and cycle parking and associated works.

Documents

APPLICATION FORM - WITHOUT PERSONAL DATA
Application Form
Not yet archived · Original link
ARB IMPLICATION ASSESSMENT
Application Document
Not yet archived · Original link
ARB METHOD STATEMENT AND TREE PROTECTION PLAN
Arboricultural Report
Not yet archived · Original link
BNP PARIBAS VIABILITY REVIEW 2025
Consultee Comment
Not yet archived · Original link
BNPP BREAKEVEN APPROACH
Consultee Comment
Not yet archived · Original link
BNPP BREAKEVEN APPROACH APRIL 25
Consultee Comment
Not yet archived · Original link
COMMENT(FULL)
Public Comment
Not yet archived · Original link
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
CIL Document
Not yet archived · Original link
DAYLIGHT AND SUNLIGHT REPORT
Application Document
Not yet archived · Original link
DAYLIGHT AND SUNLIGHT REPORT
Other
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
ENERGY ASSESSMENT
Application Document
Not yet archived · Original link
EXISTING SIDE
Drawing
Not yet archived · Original link
EXISTING WESTERN ELEVATION (REAR)
Drawing
Not yet archived · Original link
FIRE SAFETY STRATEGY
Application Document
Not yet archived · Original link
GA PLAN FIFTH FLOOR
Drawing
Not yet archived · Original link
H.I.A REPORT
Application Document
Not yet archived · Original link
NOISE ASSESSMENT
Application Document
Not yet archived · Original link
OVERHEATING ANALYSIS
Application Document
Not yet archived · Original link
PLANNING STATEMENT
Planning statement
Not yet archived · Original link
PRELIM ECOLOGICAL APPRAISAL
Application Document
Not yet archived · Original link
PROPOSED FRONT (EAST)
Drawing
Not yet archived · Original link
PROPOSED FRONT CONTEXT ELEVATION (EAST)
Drawing
Not yet archived · Original link
PROPOSED FRONT CONTEXT LONG ELEVATION (EAST)
Drawing
Not yet archived · Original link
PROPOSED GA PLAN GROUND FLOOR
Drawing
Not yet archived · Original link
PROPOSED GA ROOF LEVEL
Drawing
Not yet archived · Original link
PROPOSED GA SITE FIRST TO FOURTH FLOOR
Drawing
Not yet archived · Original link
PROPOSED PLANNING SCHEME AREAS
Application Document
Not yet archived · Original link
PROPOSED REAR
Drawing
Not yet archived · Original link
PROPOSED REAR CONTEXT ELEVATION (WEST)
Drawing
Not yet archived · Original link
PROPOSED SECTION AA
Drawing
Not yet archived · Original link
PROPOSED SECTION BB
Drawing
Not yet archived · Original link
PROPOSED SIDE
Drawing
Not yet archived · Original link
PROPOSED SIDE (NORTH)
Drawing
Not yet archived · Original link
PROPOSED SIDE CONTEXT ELEVATION (NORTH)
Drawing
Not yet archived · Original link
PROPOSED SIDE CONTEXT ELEVATION (SOUTH)
Drawing
Not yet archived · Original link
SAVILLS BREAKEVEN APPROACH
Application Document
Not yet archived · Original link
SUDS SUPPORTING INFORMATION
Other
Not yet archived · Original link
SUSTAINABILITY STATEMENT
Application Document
Not yet archived · Original link
THE LOCATION PLAN
Site Location Plan
Not yet archived · Original link
TRANSPORT STATEMENT
Application Document
Not yet archived · Original link
TREE PROTECTION PLAN
Drawing
Not yet archived · Original link
TREE SURVEY AND CONSTRAINTS PLAN
Application Document
Not yet archived · Original link
VIABILITY
Application Document
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment