Major outline EIA application for erection of approximately 3,500 homes.
Applications
Major applications
Showing 200 applications with 100+ proposed dwellings in the last 30 day(s).
Major applications here are proposals with 100+ dwellings. Smaller schemes are excluded.
Variation to S106 for redevelopment including 2,800 homes and mixed-use elements.
Phased residential-led mixed-use development delivering up to 1,800 dwellings, schools, employment, park-and-ride and new junction.
Phased redevelopment delivering up to 1,485 homes plus leisure centre, commercial space and landscaping.
Reserved matters for landscaping for development of up to 1,400 homes and associated infrastructure.
Hybrid development up to 1,400 dwellings with local centre, schools, sports/community hub and SANG.
Outline mixed-use development of up to 1,350 homes, schools, local centre, employment, open space and road works.
Discharge of conditions for mixed-use scheme including up to 1,210 dwellings and associated facilities.
Discharge of condition for mixed-use scheme including up to 1,210 dwellings, school, employment and community facilities.
Modification/discharge of obligation for residential-led development of up to 1,200 homes.
Demolition and redevelopment providing 1,152 residential units plus mixed-use, leisure and energy centre.
Demolition and erection of purpose-built student accommodation of 1,006 units with associated works.
Phased development: detailed permission for 97 dwellings and outline for up to 903 dwellings plus retail and park.
Outline for up to 1,000 dwellings, employment space, school land and neighbourhood centre.
Hybrid permission for up to 966 dwellings with mixed commercial floorspace, landscaping, access and parking.
Outline for up to 950 dwellings, specialist elderly units, mixed-use hub, access, green infrastructure and drainage.
Modify S106 to remove Code for Sustainable Homes for mixed-use scheme including up to 930 homes.
Outline for a new neighbourhood of up to 900 homes, neighbourhood centre, school, care home land and open space.
Outline for up to 660 homes, 150-unit retirement village, care home, school, local centre.
Demolish and construct mixed-use buildings (1–30 storeys) providing 802 residential homes and commercial/community uses.
Demolish college, build mixed-use towers up to 31 storeys providing 802 homes and commercial/community space.
Demolish existing; erect two buildings delivering up to 752 apartments and Class E floorspace.
Variation to approved plans for Phase 2 residential development of 664 dwellings.
Reserved matters approval for erection of 651 dwellings (Plot 210A and 210B, Stage 2 South).
Erect three apartment blocks providing 650 residential units.
Outline for up to 650 dwellings with open space, SuDS, landscaping; access only reserved.
Outline residential-led mixed-use development of up to 600 dwellings with school, local centre, and open space.
Hybrid application including outline for up to 600 homes, mobility hub, and up to 1,750sqm commercial space.
Reserved matters for development including up to 600 dwellings, school, local centre, employment and infrastructure.
Outline application for up to 550 homes with open space, roads and landscaping; access reserved.
Outline application for 550 dwellings with public open space and supporting on-site infrastructure.
Part-demolition and extensions to provide 312 BTR units, 195 co-living units, plus community and commercial space.
Outline for phased development delivering up to 500 homes, neighbourhood centre, access and infrastructure.
Erection of 498 dwellings with landscaping, drainage, footways, access, parking and associated works.
Reserved matters for construction of 491 dwellings with associated infrastructure.
Proposed development of up to 470 dwellings at Curbridge Downs Farm, Witney.
Reserved matters for erection of 469 dwellings and associated works on Site A pursuant to outline permission.
Phased redevelopment to deliver 463 residential units and up to 645sqm commercial space, landscaping and parking.
Up to 450 dwellings, 1.6ha employment, community building, SANGS, access and infrastructure.
Outline for up to 450 dwellings with community facilities, open space, landscaping and associated works.
Discharge of local employment agreement for development comprising 449 residential units, parking, landscaping and access.
Redevelop former Hoover site to provide up to 441 homes, employment land, community hub and transport hub.
Reserved matters for construction of 441 dwellings with associated infrastructure and landscaping.
Hybrid: 160 dwellings full permission and outline for up to 274 dwellings with associated infrastructure.
Outline for residential development of up to 420 dwellings with open space and infrastructure.
Residential development up to 418 dwellings with open space, SuDS, roads and infrastructure.
Development of 406 C3 dwellings with parking, open space, landscaping and infrastructure.
Outline for up to 400 dwellings, 8–10 form-entry secondary school, community hub and infrastructure.
Outline for up to 400 dwellings with neighbourhood centre, sports pitches, allotments, LDR and open space.
Outline redevelopment for up to 400 dwellings, nursery/community floorspace, new accesses and landscaping.
Outline for up to 330 dwellings and up to 60 older-person units with access and infrastructure.
Outline redevelopment delivering up to 380 dwellings with access, parking, landscaping.
Outline for up to 375 homes, childcare facility, parking, open space, landscaping and drainage.
Outline application for up to 375 dwellings with access, park, open space, and associated infrastructure.
Reserved matters for mixed-use redevelopment including 371 houses, offices, school, 693 student bed spaces.
Outline for up to 370 dwellings with retail, roads, open space and infrastructure.
Reserved matters for erection of 356 dwellings with landscaping, open space, sports facilities and commercial uses.
Demolition and redevelopment: sports-led scheme plus 353 new homes, care home, parking, park and play areas.
Demolition and construction of mixed-use development including 352 homes, community space, and commercial units.
Outline for up to 350 dwellings with access, landscaping, drainage and highway improvements.
Outline for up to 350 homes with a community hub, landscaping and infrastructure.
Crane operation details for redevelopment providing 350 residential units and associated mixed‑use facilities.
Reserved matters for construction of 344 dwellings with associated infrastructure.
Reserved matters for erection of 343 dwellings with associated infrastructure.
Reserved matters for erection of 343 dwellings with associated green/blue infrastructure, highways, landscaping and layout details.
Reserved matters for Phase 1 delivering 338 dwellings with associated infrastructure.
Reserved matters for Phase 4: erect 336 homes with associated non-residential floorspace and landscaping.
Demolition and construction of 334 new dwellings with access, landscaping, open space and supporting infrastructure.
Reserved matters for erection of 333 residential dwellings (appearance, landscaping, layout, scale).
Reserved matters for 332 dwellings, public open space and associated infrastructure.
Demolish existing residential buildings and redevelop site delivering up to 329 residential units with plant, energy centre and landscaping.
Redevelopment delivering 329 homes, 5,457 sqm commercial space, public realm, parking and landscaping.
Amended reserved matters for erection of 328 dwellings (chimney location changes).
Amended brick details for reserved matters for 328 dwellings and associated infrastructure.
Reserved matters for 327 dwellings, public open space, drainage pond, landscaping and infrastructure.
Outline for up to 325 residential properties with access, parking, open space and infrastructure.
Reserved matters for redevelopment to provide 322 dwellings and 428.5sqm Class E floorspace.
Reserved matters for phase 3: 286 dwellings and 34 self-build plots with associated infrastructure.
Outline permission for 320 homes, care home and supporting infrastructure, landscaping.
Residential development up to 320 dwellings with supporting infrastructure and access.
Outline application for up to 320 dwellings with access, green infrastructure and supporting works.
Reserved matters for erection of 316 dwellings and associated works.
Outline for up to 310 residential dwellings across two parcels with access, SUDS and parkland.
Redevelopment to provide 304 residential units, parking, retail, public open space and landscaping.
Mixed residential scheme: 236 social homes, 31 student units, 33 retirement units, shared community space.
Outline for up to 300 homes, care home, access, landscaping, infrastructure and associated supporting development.
Outline for up to 297 dwellings and up to 300m² commercial space with infrastructure and landscaping.
Construction of 295 dwellings with open space, landscaping and associated infrastructure.
Outline for up to 295 dwellings with new roundabout, access, roads, and open space.
Redevelopment to provide 294 residential units with parking, landscaping and cycle parking.
Amendment to porch details on reserved matters approval for 290 dwellings.
Reserved matters for 289 dwellings with infrastructure, open space, and play equipment.
Redevelopment to provide 286 dwellings, new vehicular access, amenity space and landscaping.
Erection of 285 dwellings with associated parking, open space, drainage, infrastructure and landscaping.
Residential‑led redevelopment providing 283 units plus 456 sqm flexible commercial space.
Reserved matters for erection of 283 dwellings with associated works and landscaping.
Hybrid redevelopment including Swan Centre works and Phase 1 delivering 276 dwellings, commercial floorspace, cinema and access roads.
Outline for up to 275 residential units, nursery land, cemetery extension and associated infrastructure.
Comprehensive redevelopment providing 274 homes and 2,038sqm commercial and community floorspace in new buildings.
Outline for up to 270 homes with community building, traveller pitches, open space and infrastructure.
Outline for up to 270 dwellings with community land, open space, play area and infrastructure.
Phased redevelopment providing 269 build-to-rent dwellings and commercial/community floorspace.
Outline for up to 268 dwellings, up to 80-bed care home, local centre and open space.
Demolish existing; erect two blocks providing 265 apartments and 447sqm flexible workspace with access and parking.
Demolition and redevelopment delivering up to 262 residential dwellings across six buildings with ground-floor commercial.
Amend condition wording for outline permission for up to 262 dwellings.
Erect 28-storey residential building comprising 255 dwellings with ground-floor commercial use and car park.
Residential development comprising up to 250 homes.
Outline for up to 250 dwellings with access, open space, SUDS and associated infrastructure.
Outline application for up to 250 dwellings with open space, allotments, SuDS and access.
Outline for up to 250 dwellings with open space, allotments, planting, SuDS and access.
Outline application for up to 250 dwellings with associated infrastructure; access applied for.
Partial approval for conditions for phased development of up to 249 residential dwellings.
Partial approval for UXO condition on phased development of up to 249 dwellings.
Reserved matters for appearance, layout and scale of 238 dwellings (southern parcel).
Reserved matters for phase 4: erection of 236 dwellings (residential development).
Outline for up to 235 dwellings with public open space, landscaping, SuDS and access.
Reserved matters details for 233 dwellings including appearance, landscaping, layout and scale.
Outline for demolition and construction of up to 230 dwellings with access details reserved.
Residential development of 230 dwellings with associated infrastructure, SUDS, parking and landscaping.
Erection of 229 homes with parking, landscaping, open space and two access points from Waggons Way.
Police HQ and Phase 2 delivering 40 units, plus outline for up to 185 additional dwellings.
Erection of 222 dwellings with associated access, infrastructure and landscaping.
Reserved matters for 220 dwellings, local centre, access, landscaping and infrastructure.
Reserved matters for appearance, landscaping, layout and scale for 219 dwellings and associated works.
Reserved matters for access, appearance, landscaping, layout and scale for 216 dwellings.
Reserved matters for access, appearance, landscaping, layout and scale for 216 dwellings.
Approval of condition to outline permission for up to 215 dwellings with open space and SuDS.
Hybrid: 215 dwellings with access, open space; outline 2.2ha primary school site.
Erection of 211 residential dwellings and a Community Hub with associated parking and amenity space.
Outline application for up to 210 residential dwellings (C3), access partially reserved.
Outline residential development of up to 210 dwellings (Use Class C3), access only reserved.
Reserved matters for development of 206 dwellings with associated drainage and landscaping.
Erection of 203 dwellings with associated vehicle, cycle and pedestrian infrastructure.
Develop up to 202 dwellings with landscaping, public open space and access.
Approval of liaison committee details for 200-dwelling development.
Reserved matters for 200 dwellings with highways, drainage, landscaping and open space.
Hybrid application for up to 200 homes, new vehicular access, public open space and pedestrian access.
Modify S106 for 200-dwelling scheme (70 affordable, 130 open market) regarding youth facilities and changing rooms.
Outline application (access only) for up to 200 dwellings with Bent Lane access.
Up to 200 dwellings with small shop, sports pitches, landscaping and infrastructure.
Outline for up to 200 dwellings with open space, landscaping, SUDS and access.
Twelve-storey mixed-use development with 199 residential units and two ground-floor commercial units.
Details of street furniture, play equipment and cycle parking for phase 2 of 193-unit mixed use scheme.
Construction of 192 dwellings with public open space, landscaping, and new vehicular and pedestrian access.
Reserved matters for 191 dwellings with associated infrastructure and onsite open space.
Outline for up to 190 dwellings with open space, landscaping, SuDS and access.
Outline application for up to 190 dwellings with access from Bar Lane.
Outline permission for up to 190 dwellings with access from Bar Lane.
Outline for residential-led development of up to 187 dwellings with public open space and recreation ground extension.
Outline application for up to 186 residential dwellings with access, open space and associated works.
Outline for up to 185 dwellings with public open space and associated infrastructure; access reserved.
Reserved matters for Phase D comprising 182 dwellings, SUDS, open space and access roads.
Outline for up to 180 residential dwellings with public open space, landscaping and access points.
Reserved matters for up to 118 dwellings and 60 specialist elderly care units.
Change of use of offices (Class E) to 175 residential apartments (Class C3).
Façade alterations to facilitate conversion of offices to 175 residential apartments.
Construction of 174 dwellings with public open space, landscaping, SuDS and associated infrastructure.
Amended garage roof details to reserved matters for erection of 171 dwellings.
Build 20-storey purpose-built student block of 170 one-bed studio flats with communal facilities.
Details to comply with landscaping condition for approved 170-dwelling development.
Discharge of s106 clause relating to approved development for 170 residential dwellings.
Reserved matters for 166 two-, three-, and four-bedroom houses with infrastructure and landscaping.
Outline for up to 165 homes, commercial space, up to 80-bed care home and amenities.
Reserved matters for construction of 164 dwellings with open space and infrastructure.
Build part 10/part 9 storey block with 160 apartments and two ground-floor commercial units.
Reserved matters for 160 dwellings, internal roads, parking, landscaping, appearance, layout and scale.
Outline application for up to 160 dwellings with open space, landscaping, drainage and infrastructure.
Outline application for up to 160 dwellings with infrastructure, open space and landscaping.
Outline application for up to 160 dwellings, functional open space and associated works.
Hybrid: new 3G pitch, clubhouse and courts plus outline for up to 160 dwellings and infrastructure.
Outline for up to 159 homes with road link, infrastructure, open space, SANG and drainage.
Hybrid: full permission for 62 dwellings and outline for approximately 96 dwellings.
Reserved matters for layout, scale, landscaping and appearance for 158 dwellings and infrastructure.
Mixed-use redevelopment delivering 156 co‑living units and 130.6 sqm commercial floorspace.
Construction of 155 dwellings with associated open space and infrastructure (EIA development).
Reserved matters details for development of 155 dwellings (access, appearance, landscaping, layout, scale).
Demolition and construction of up to 150 homes, plus education facility, community building and open space.
Reserved matters for construction of 150 dwellings (phase 2.1) including layout and landscaping.
Reserved matters approval for appearance, landscaping, layout and scale for 150 dwellings.
Up to 150 dwellings with access, drainage attenuation and public open space; access reserved.
Outline for up to 150 dwellings with affordable housing, open space, landscaping, SuDS and vehicular access.
Outline for up to 150 residential dwellings with access and associated works.
Residential development of 150 dwellings with affordable housing, access and open space.
Development of 150 dwellings with highways, landscaping and open space.
Reserved matters approval for 150 dwellings, open space, parking and infrastructure.
Erection of 150 dwellings with access, drainage, public open space and landscaping.
Construction of 150 dwellings with access, drainage, public open space and landscaping.
Demolish Regent Wing; build three blocks providing 150 apartments with landscaping, parking and access improvements.
Change of offices to 148 residential units (Class MA prior approval).
Construction of 147 dwellings with open space, landscaping and associated infrastructure.
Construction of 146 dwellings with access, landscaping and associated works.
Outline for up to 145 dwellings, custom/self-build plots, 0.6ha commercial space and open space.
Residential development providing 143 new dwellings with access, roads, parking, drainage and landscaping.
Reserved matters approval for 140 dwellings, open space, landscaping and related infrastructure.
Development of 140 dwellings with parking, public open space, landscaping and access.
Erection of 140 dwellings with access, landscaping, and associated works.
Convert and extend listed mansion to provide 139 C2 residential units with communal facilities, parking and landscaping.
Reserved matters for 138 dwellings, public open space and associated works.
Approval of travel plans for residential development of up to 138 dwellings.