← Bolton Council

Status

Deposited House extension
Received
24 Feb 2025
New homes
0

Summary

First-floor extension to create a two-storey dwelling, with balconies and new boundary wall.

Full proposal

ERECTION OF A FIRST FLOOR EXTENSION TO CREATE TWO STOREY DWELLING, BALCONIES TO FRONT AND SIDE AND ALTERATION TO EXISTING EXTERNAL MATERIALS TOGETHER WITH A NEW BOUNDARY WALL

Documents

AIA
Tree Survey
Not yet archived · Original link
AMS
Tree Survey
Not yet archived · Original link
ApplicationFormRedacted
Application Form
Not yet archived · Original link
ARBORICULTURAL IMPLICATIONS ASSESSMENT
Amended Drawing
Not yet archived · Original link
ARBORICULTURAL METHOD STATEMENT
Amended Drawing
Not yet archived · Original link
Bat survey
Consultee Comment
Not yet archived · Original link
Comments from ecologist - bat survey
Consultee Comment
Not yet archived · Original link
EXISTING ELEVATIONS
Amended Drawing
Not yet archived · Original link
EXISTING FLOOR PLANS
Amended Drawing
Not yet archived · Original link
External material options
Amended Drawing
Not yet archived · Original link
Greater Manchester Ecology Unit
Consultee Comment
Not yet archived · Original link
NEIGHBOUR CONSULTATION PLAN
Consultation Plan
Not yet archived · Original link
Proposed elevations
Amended Drawing
Not yet archived · Original link
PROPOSED ELEVATIONS
Amended Drawing
Not yet archived · Original link
Amended Drawing
Archived · Original link
Amended Drawing
Archived · Original link
REDACTED APPLICATION FORM
Amended Drawing
Not yet archived · Original link
RESPONSE - HIGHWAYS & ENGINEERING
Consultee Comment
Not yet archived · Original link
SITE AND LOCATION PLANS
Amended Drawing
Not yet archived · Original link
Tree Officer's comment
Consultee Comment
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment