Summary

Outline redevelopment for industrial, storage, logistics, waste facility, data centre and ancillary offices.

Full Proposal

Outline planning application (all matters reserved) for the demolition of all structures and phased redevelopment of the site to provide buildings extending up to 39m in height, comprising a mix of uses including: light industrial, general industrial, storage, distribution and logistics, waste facility and data centre, and ancillary office spaces, creation of servicing areas and provision of associated services, including waste, refuse, cycle storage, and lighting; and all associated works and operations including but not limited to: demolition; earthworks; provision of attenuation infrastructure, engineering operations.

Reasonable Objection Grounds

These are planning grounds where objections may be reasonable for this application:

Traffic Noise Scale Character Ecology Flooding Amenity Infrastructure

Likely Support Reasons

These are potential reasons to support this application based on the proposal:

Employment Regeneration Sustainability

Detail pages

Documents

Access parameter plan
Submitted Drawings Plans
Not downloaded · Council link
Air quality assessment
Supporting Documents
Not downloaded · Council link
Air quality positive statement
Supporting Documents
Not downloaded · Council link
Application form
Application Form (Public)
Not downloaded · Council link
Arboricultural impact assessment and plan
Supporting Documents
Not downloaded · Council link
Archaeological desk based assessment
Supporting Documents
Not downloaded · Council link
Biodiversity net gain assessment (inc. bng metric)
Supporting Documents
Not downloaded · Council link
Breeam report
Supporting Documents
Not downloaded · Council link
Car parking design and management plan
Supporting Documents
Not downloaded · Council link
Cil form
Supporting Documents
Not downloaded · Council link
Cover letter
Supporting Documents
Not downloaded · Council link
Demolition parameter plan
Submitted Drawings Plans
Not downloaded · Council link
Design and access statement part 1
Design Access
Not downloaded · Council link
Design and access statement part 2
Design Access
Not downloaded · Council link
Design and access statement part 3
Design Access
Not downloaded · Council link
Design and access statement part 4
Design Access
Not downloaded · Council link
Design and access statement part 5
Design Access
Not downloaded · Council link
Design guidelines
Supporting Documents
Not downloaded · Council link
Development specification
Supporting Documents
Not downloaded · Council link
Drainage strategy
Supporting Documents
Not downloaded · Council link
Drainage strategy appendix a
Supporting Documents
Not downloaded · Council link
Drainage strategy appendix b
Supporting Documents
Not downloaded · Council link
Drawing register
Supporting Documents
Not downloaded · Council link
Environmental health
Consultee Comments (Public)
Not downloaded · Council link
Environmental health, noise team
Consultee Comments (Public)
Not downloaded · Council link
Existing block plan
Submitted Drawings Plans
Not downloaded · Council link
Existing elevations - unit 2
Submitted Drawings Plans
Not downloaded · Council link
Existing elevations - unit 3
Submitted Drawings Plans
Not downloaded · Council link
Existing elevations - unit 4
Submitted Drawings Plans
Not downloaded · Council link
Existing first floor plan - unit 4
Submitted Drawings Plans
Not downloaded · Council link
Existing ground floor mezzanine plan - unit 3
Submitted Drawings Plans
Not downloaded · Council link
Existing ground floor plan - unit 2
Submitted Drawings Plans
Not downloaded · Council link
Existing ground floor plan - unit 3
Submitted Drawings Plans
Not downloaded · Council link
Existing ground floor plan - unit 4
Submitted Drawings Plans
Not downloaded · Council link
Existing second floor plan - unit 4
Submitted Drawings Plans
Not downloaded · Council link
Existing sections - unit 2
Submitted Drawings Plans
Not downloaded · Council link
Existing sections - unit 3
Submitted Drawings Plans
Not downloaded · Council link
Existing sections - unit 4
Submitted Drawings Plans
Not downloaded · Council link
Existing site levels plan
Submitted Drawings Plans
Not downloaded · Council link
External lighting strategy
Supporting Documents
Not downloaded · Council link
Flood risk assessment
Supporting Documents
Not downloaded · Council link
Framework travel plan
Supporting Documents
Not downloaded · Council link
Heritage townscape and visual statement part 1
Supporting Documents
Not downloaded · Council link
Heritage townscape and visual statement part 2
Supporting Documents
Not downloaded · Council link
Heritage townscape and visual statement part 3
Supporting Documents
Not downloaded · Council link
Heritage townscape and visual statement part 4
Supporting Documents
Not downloaded · Council link
Heritage townscape and visual statement part 5
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 1
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 2
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 3
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 4
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 5
Supporting Documents
Not downloaded · Council link
Land contamination preliminary risk assessment part 6
Supporting Documents
Not downloaded · Council link
Landscape zone parameter plan
Submitted Drawings Plans
Not downloaded · Council link
List - consulted
Consultation
Not downloaded · Council link
List - consulted on application
Consultation
Not downloaded · Council link
Maximum building heights parameter plan
Submitted Drawings Plans
Not downloaded · Council link
Noise assessment
Supporting Documents
Not downloaded · Council link
Outline circular economy statement
Supporting Documents
Not downloaded · Council link
Outline construction logistics plan
Supporting Documents
Not downloaded · Council link
Outline delivery and servicing plan
Supporting Documents
Not downloaded · Council link
Outline energy and sustainability statement
Supporting Documents
Not downloaded · Council link
Outline fire statement
Supporting Documents
Not downloaded · Council link
Outline whole life carbon assessment statement
Supporting Documents
Not downloaded · Council link
Planning statement
Supporting Documents
Not downloaded · Council link
Pre-demolition audit
Supporting Documents
Not downloaded · Council link
Pre-redevelopment audit
Supporting Documents
Not downloaded · Council link
Preliminary ecological apprasial
Supporting Documents
Not downloaded · Council link
Preliminary ecological apprasial appendix a
Supporting Documents
Not downloaded · Council link
Railway sidings feasibility technical note
Supporting Documents
Not downloaded · Council link
Site location plan
Submitted Drawings Plans
Archived copy · Council link
Site notice
Consultation
Not downloaded · Council link
Solar glare assessment
Supporting Documents
Not downloaded · Council link
Statement of community involvement
Supporting Documents
Not downloaded · Council link
Transport assessment
Supporting Documents
Not downloaded · Council link
Tv radio and cellular interference report
Supporting Documents
Not downloaded · Council link
Utilities infrastructure strategy part 2
Supporting Documents
Not downloaded · Council link
Utilities infrastructure strategy part 3
Supporting Documents
Not downloaded · Council link
Utilities infrastructure strategy part1
Supporting Documents
Not downloaded · Council link
Wind microclimate report
Supporting Documents
Not downloaded · Council link