← London Borough of Camden
Status
REGISTERED
Change of use
Full proposal
Refurbishment and change of use from class E office use to class C3 residential, as one self-contained family dwelling, incl. bricking up of windows in rear column/ formation of rear lift shaft.
Documents
001 Location Plan
Existing Drawing
002 Block Plan
Existing Drawing
010 Existing Lower Ground Floor Plan
Existing Drawing
011 Existing Ground Floor Plan
Existing Drawing
012 Existing First Floor Plan
Existing Drawing
013 Existing Second Floor Plan
Existing Drawing
014 Existing Third Floor Plan
Existing Drawing
015 Existing Roof Plan
Existing Drawing
020 Existing Section AA.
Existing Drawing
021 Existing Section BB.
Existing Drawing
030 Existing Red Lion Square Elevation
Existing Drawing
031 Existing Rear Elevation
Existing Drawing
110 Proposed Lower Ground Floor Plan
Proposed Drawing
111 Proposed Ground Floor Plan
Proposed Drawing
112 Proposed First Floor Plan
Proposed Drawing
113 Proposed Second Floor Plan
Proposed Drawing
114 Proposed Third Floor Plan.
Proposed Drawing
115 Proposed Roof Plan.
Proposed Drawing
14 Red Lion Square - Design and Access Statement
Design and Access Statement
14 Red Lion Square - Marketing Evidence Report
Other
14 Red Lion Square - Room by Room Schedule
Other
14774_03 14 Red Lion Square Cover Letter
Correspondence
14774_03 Red Lion Square Heritage Impact Assessment
Other
14774_03 Red Lion Square Planning Statement
Other
200 Proposed Section AA
Proposed Drawing
201 Proposed Section BB
Proposed Drawing
300 Proposed Red Lion Square Elevation
Proposed Drawing
301 Rear Elevation - Demolition extent
Proposed Drawing
302 Proposed Rear Elevation
Proposed Drawing
Air Quality Assessment
Other
Application Form
Application Form
Occupancy Schedule (13 - 17 Red Lion Square buildings)
Other
Red Lion Square - Air Quality Assessment (previous submission)
Other
s106 agreement - Red Lion Square - draft 1
Legal Agreement
s106 agreement - Red Lion Square - Final Version
Legal Agreement
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.