← London Borough of Camden
Status
REGISTERED
Industrial
Full proposal
Partial demolition of existing warehouse; refurbishment and extension of existing warehouse; external alterations to existing railway arches on east and west elevations; and associated works related to the continued use of the site as a builders merchant (Sui Generis), and/or Class B8 (Storage and Distribution) and/or Class E(g)(iii) (Light Industrial) uses.
Documents
1 x Response
Consultation Response
Air Quality Assessment
Supporting Documents
Application Form (No Personal Data)
Application Form
Arboricultural Impact Assessment
Supporting Documents
Bat Emergence Activity Survey Report
Supporting Documents
BNG Exemption Letter
Supporting Documents
Covering Letter
Supporting Documents
Design and Access Statement
Design and Access Statement
Existing and Proposed Drainage Plans
Existing & Proposed Drawing
Existing Floor Plans
Existing Drawing
Existing Sections AA & BB
Existing Drawing
Existing Sections CC, DD, EE
Existing Drawing
Existing Viaduct Elevations and Sections
Existing Drawing
Flood Risk Assessment and Drainage Strategy
Supporting Documents
Framework Travel Plan
Supporting Documents
Land Contamination Phase 1 Desk Study
Supporting Documents
Noise Assessment
Supporting Documents
Planning Fire Safety Statement
Supporting Documents
Planning Statement
Supporting Documents
Preliminary Ecological Appraisal
Supporting Documents
Proposed Arch Infill and Warehouse Elevations
Proposed Drawing
Proposed Clarence Way Gate Details
Proposed Drawing
Proposed Demolition Elevations and Sections
Proposed Drawing
Proposed Demolition Plans
Proposed Drawing
Proposed Floor Plan
Proposed Drawing
Proposed Means of Escape Plan
Proposed Drawing
Proposed Roof Plan
Proposed Drawing
Proposed Sections AA & BB
Proposed Drawing
Proposed Sections CC, DD, EE
Proposed Drawing
Proposed Viaduct Elevations
Proposed Drawing
Sustainability Statement
Supporting Documents
Transport Statement
Supporting Documents
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.