← Cardiff Council

Status

Registered New housing
Received
30 Aug 2024
New homes
0

Full proposal

Outline Application for a mixed use scheme to provide new homes (class C3), business space (class B1) and a mix of complementary leisure, food & drink, hotel, hospitality, co-living, retail and health & wellbeing uses (class A1, A2, A3, C1, D1, D2 and Sui-generis); creation of new and associated landscaped spaces, parking, public realm and other associated ancillary and highway works.

Documents

AIR QUALITY
Supporting Documents
Not yet archived · Original link
APPENDIX 1.1 GLOSSARY OF TERMS
Supporting Documents
Not yet archived · Original link
APPENDIX 1.2 EIA STATEMENT OF COMPETENCE
Supporting Documents
Not yet archived · Original link
APPENDIX 10.1 NOISE AND VIBRATION GLOSSARY OF ACOUSTIC TERMS
Supporting Documents
Not yet archived · Original link
APPENDIX 10.2 NANDV BASELINE SURVEY
Supporting Documents
Not yet archived · Original link
APPENDIX 10.3 NANDV CONSTRUCTION NOISE AND VIBRATION ASSESSMENT
Supporting Documents
Not yet archived · Original link
APPENDIX 10.4 NANDV ROAD TRAFFIC NOISE ASSESSMENT
Supporting Documents
Not yet archived · Original link
APPENDIX 11.1 AQ GLOSSARY OF TERMS
Supporting Documents
Not yet archived · Original link
APPENDIX 11.2 LEGISLATION POLICY AND GUIDANCE
Supporting Documents
Not yet archived · Original link
APPENDIX 11.3 2022 CARDIFF WINDROSE
Supporting Documents
Not yet archived · Original link
APPENDIX 11.4 TRAFFIC DATA
Supporting Documents
Not yet archived · Original link
APPENDIX 11.5 MODELLED RECEPTORS AND BACKGROUNDS
Supporting Documents
Not yet archived · Original link
APPENDIX 11.6 MODEL VERIFICATION
Supporting Documents
Not yet archived · Original link
APPENDIX 11.7 MODELLED RESULTS
Supporting Documents
Not yet archived · Original link
APPENDIX 12.1 NRW MAPS FOR PLANNING
Supporting Documents
Not yet archived · Original link
APPENDIX 12.2 CPM-APT-ZZ-ZZZZ-DR-A-FL-0002 PROPOSED MASTERPLAN - BUILDING
Supporting Documents
Not yet archived · Original link
APPENDIX 12.3 FLOOD CONSEQUENCES ASSESSMENT (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 12.3 FLOOD CONSEQUENCES ASSESSMENT (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 12.4 SAB MEETING MINUTES
Supporting Documents
Not yet archived · Original link
APPENDIX 12.6 WELSH WATER
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (3)
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (4)
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (5)
Supporting Documents
Not yet archived · Original link
APPENDIX 13.1 WIND MICROCLIMATE ASSESSMENT (6)
Supporting Documents
Not yet archived · Original link
APPENDIX 3.1 PARAMETER PLANS AND SCHEDULE
Supporting Documents
Not yet archived · Original link
APPENDIX 5.1 CUMMULATIVE SCHEMES MAP
Supporting Documents
Not yet archived · Original link
APPENDIX 6.1 PRELIMINARY ECOLOGICAL APPRAISAL 2022 S2
Supporting Documents
Not yet archived · Original link
APPENDIX 6.10 VEGETATION SURVEY (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.10 VEGETATION SURVEY (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.11 BAT PRESENCE ABSENCE REPORT 2024
Supporting Documents
Not yet archived · Original link
APPENDIX 6.2 ECOLOGICAL APPRAISAL 2023 S2 (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.2 ECOLOGICAL APPRAISAL 2023 S2 (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.2 ECOLOGICAL APPRAISAL 2023 S2 (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.3 BAT ACTIVITY REPORT 2023 S2 (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.3 BAT ACTIVITY REPORT 2023 S2 (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.4 OTTER REPORT 2024 S2
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (3)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (4)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (5)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.6 WINTERING BIRD SURVEY REPORT 2023 S2 (6)
Supporting Documents
Not yet archived · Original link
APPENDIX 6.7 REPTILE SURVEY REPORT S2
Supporting Documents
Not yet archived · Original link
APPENDIX 6.8 INVERTEBRATE ASSESSMENT 2022 S2
Supporting Documents
Not yet archived · Original link
APPENDIX 6.9 INVERTEBRATE ASSESSMENT 2023 S2
Supporting Documents
Not yet archived · Original link
APPENDIX 7.1 LOCATION PLAN (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 7.1 LOCATION PLAN (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 7.1 LOCATION PLAN (3)
Supporting Documents
Not yet archived · Original link
APPENDIX 7.2 PHOTOGRAPHS VIEWPOINT 1-2
Supporting Documents
Not yet archived · Original link
APPENDIX 7.3 ZONE OF THEORETICAL VISIBILITY - LANDFORM (1)
Supporting Documents
Not yet archived · Original link
APPENDIX 7.3 ZONE OF THEORETICAL VISIBILITY - LANDFORM (2)
Supporting Documents
Not yet archived · Original link
APPENDIX 7.3 ZONE OF THEORETICAL VISIBILITY - LANDFORM (3)
Supporting Documents
Not yet archived · Original link
APPENDIX 9.3 SUMMARY OF CONTAMINATION TEST RESULTS FROM THE 2024 A2 SITE I
Supporting Documents
Not yet archived · Original link
APPENDIX 9.4 PRELIMINARY 2024 GROUND GAS RISK ASSESSMENT CALCULATIONS
Supporting Documents
Not yet archived · Original link
APPENDIX 9.5 CSM - POTENTIAL POLLUTANT LINKAGES AND RISK ASSESSMENT
Supporting Documents
Not yet archived · Original link
APPENDIX 9.6 RISK ASSESSMENT CLASSIFICATIONS AND MATRIX
Supporting Documents
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form
Not yet archived · Original link
APPROACH
Supporting Documents
Not yet archived · Original link
ARBORICULTURAL IMPACT ASSESSMENT
Supporting Documents
Not yet archived · Original link
BIODIVERSITY
Supporting Documents
Not yet archived · Original link
CLIMATE CHANGE
Supporting Documents
Not yet archived · Original link
CONSTRUCTION MANAGEMENT PLAN
Supporting Documents
Not yet archived · Original link
CONSULTATION ALTERNATIVES AND SCHEME EVOLUTION
Supporting Documents
Not yet archived · Original link
COVERING LETTER
Supporting Documents
Not yet archived · Original link
DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT (1)
Supporting Documents
Not yet archived · Original link
DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT (2)
Supporting Documents
Not yet archived · Original link
DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT (3)
Supporting Documents
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not yet archived · Original link
DESIGN CODES (1)
Supporting Documents
Not yet archived · Original link
DESIGN CODES (2)
Supporting Documents
Not yet archived · Original link
DESIGN CODES (3)
Supporting Documents
Not yet archived · Original link
DESIGN CODES (4)
Supporting Documents
Not yet archived · Original link
DIRECT ACCESS TO PROPOSED CAR PARK
Plans/Drawings
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART1
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART10
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART11
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART12
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART13
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART14
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART15
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART16
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART17
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART18
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART19
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART2
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART20
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART21
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART22
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART23
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART24
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART25
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART3
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART4
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART5
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART6
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART7
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART8
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 12.5 DRAINAGE STRATEGY REPORT_PART9
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 4.1 SCOPING REPORT_PART1
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 4.1 SCOPING REPORT_PART2
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 4.1 SCOPING REPORT_PART3
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 4.1 SCOPING REPORT_PART4
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 4.1 SCOPING REPORT_PART5
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 6.5 BREEDING BIRD SURVEY REPORT 2023_S2_PART1
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 6.5 BREEDING BIRD SURVEY REPORT 2023_S2_PART2
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
ES V2 APPENDIX 9.1 A2 SITE INVESTIGATION, CARDIFF BAY PENINSULA PHASE I DESK STU
Supporting Documents
Not yet archived · Original link
FIGURE 10.1 - NOISE MONITORING AND SENSITIVE RECEPTOR LOCATIONS
Supporting Documents
Not yet archived · Original link
FIGURE 10.2 - NOISE CONTOUR PLOT PROPOSED DEVELOPMENT - DAYTIME
Supporting Documents
Not yet archived · Original link
FIGURE 10.3 - NOISE CONTOUR PLOT PROPOSED DEVELOPMENT - NIGHTTIME
Supporting Documents
Not yet archived · Original link
FIGURE 6.1 SITE LOCATION
Supporting Documents
Not yet archived · Original link
FIGURE 6.2 STATUTORY SITES
Supporting Documents
Not yet archived · Original link
FIGURE 6.3 NON-STATUTORY SITES
Supporting Documents
Not yet archived · Original link
FIGURE 6.4 PHASE 1
Supporting Documents
Not yet archived · Original link
FRONT COVER AND CONTENTS
Supporting Documents
Not yet archived · Original link
FRONT COVER AND CONTENTS
Supporting Documents
Not yet archived · Original link
GREEN INFRASTRUCTURE STATEMENT
Supporting Documents
Not yet archived · Original link
GROUND CONDITIONS
Supporting Documents
Not yet archived · Original link
HABITATS REGULATION ASSESSMENT (1)
Supporting Documents
Not yet archived · Original link
HABITATS REGULATION ASSESSMENT (2)
Supporting Documents
Not yet archived · Original link
HUMAN HEALTH
Supporting Documents
Not yet archived · Original link
INTRODUCTION
Supporting Documents
Not yet archived · Original link
LANDSCAPE STRATEGY
Supporting Documents
Not yet archived · Original link
LIGHTING STRATEGY
Supporting Documents
Not yet archived · Original link
NOISE AND VIBRATION
Supporting Documents
Not yet archived · Original link
NON-TECHNICAL SUMMARY
Supporting Documents
Not yet archived · Original link
OBJECTION-24 PLAS BOWLES
Objection Comment
Not yet archived · Original link
OBJECTION-CARDIFF CIVIC SOCIETY
Objection Comment
Not yet archived · Original link
PLANNING STATEMENT
Supporting Documents
Not yet archived · Original link
PRE-APPLICATION CONSULTATION REPORT (1)
Supporting Documents
Not yet archived · Original link
PRE-APPLICATION CONSULTATION REPORT (2)
Supporting Documents
Not yet archived · Original link
PRE-APPLICATION CONSULTATION REPORT (3)
Supporting Documents
Not yet archived · Original link
PRE-APPLICATION CONSULTATION REPORT (4)
Supporting Documents
Not yet archived · Original link
PRIMARY ACCESS
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER 3D VIEW - EAST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER 3D VIEW - NORTH
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER 3D VIEW - SOUTH
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER 3D VIEW - WEST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER ELEVATION NORTH-EAST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER ELEVATION NORTH-WEST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER ELEVATION SOUTH-EAST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER ELEVATION SOUTH-WEST
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER PLAN - BUILT FORM
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER PLAN - GREEN INFRASTRUCTURE
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER PLAN - MOVEMENT
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER SECTION AA
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER SECTION BB
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER SECTION CC
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER SECTION DD
Plans/Drawings
Not yet archived · Original link
PROPOSED PARAMETER SECTION EE
Plans/Drawings
Not yet archived · Original link
SECONDARY ACCESS - PROPOSED REALIGNMENT OF EMPIRE WAY
Plans/Drawings
Not yet archived · Original link
SECONDARY ACCESS - SWEPT PATH ANALYSIS
Plans/Drawings
Not yet archived · Original link
SITE AND SURROUNDINGS
Supporting Documents
Not yet archived · Original link
SOCIO-ECONOMICS
Supporting Documents
Not yet archived · Original link
SUMMARY OF PROPOSED MITIGATION AND RESIDUAL EFFECTS
Supporting Documents
Not yet archived · Original link
SUSTAINABILITY AND ENERGY ASSESSMENT
Supporting Documents
Not yet archived · Original link
TERTIARY ACCESS - PROPOSED ACCESS ARRANGEMENT DESIGN
Plans/Drawings
Not yet archived · Original link
THE PROPOSED DEVELOPMENT
Supporting Documents
Not yet archived · Original link
TOWNSCAPE AND VISUAL IMPACT
Supporting Documents
Not yet archived · Original link
TRANSPORT
Supporting Documents
Not yet archived · Original link
WASTE MANAGEMENT PLAN
Supporting Documents
Not yet archived · Original link
WATER AND DRAINAGE
Supporting Documents
Not yet archived · Original link
WIND MICROCLIMATE
Supporting Documents
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment