← City of London

Status

Under Consideration Change of use
Received
01 Dec 2023
New homes
0

Full proposal

Change of use of existing deep level tunnels (Sui Generis) to visitor and cultural attraction (Use Class F1(b)(c)), including bar (Sui Generis); demolition and reconstruction of existing building at 38-39 Furnival Street; redevelopment of 40-41 Furnival Street, for the principal visitor attraction pedestrian entrance at ground floor, with ancillary retail at first and second floor levels and ancillary offices at third and fourth levels, excavation of additional basement levels at 40-41 Furnival Street and 38-39 Furnival Street, and widening of lift shaft at 38-39 Furnival Street; creation of new, pedestrian entrance at 31-33 High Holborn, to provide secondary visitor attraction entrance (including principal bar entrance), deepening of lift shaft at 31-33 High Holborn; provision of ancillary cycle parking, substation, servicing and plant, and other associated works (Duplicate application submitted to the London Borough of Camden as the site area extends across the borough boundary). Re-consultation: Due to amended details

Documents

(PART 1) CIRCULAR ECONOMY STATEMENT
Accompanying report
Not yet archived · Original link
(PART 1) CULTURAL PLAN
Accompanying report
Not yet archived · Original link
(PART 1) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 1) PLANNING FIRE STATEMENT1
Accompanying report
Not yet archived · Original link
(PART 1) PRE-DEMOLITION AUDIT
Accompanying report
Not yet archived · Original link
(PART 10) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 11) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 12) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 13) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 14) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 15) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 16) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 17) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 18) GEOTECH BASEMENT IMPACT ASSESSMENT_PART18
Accompanying report
Not yet archived · Original link
(PART 2) CIRCULAR ECONOMY STATEMENT
Accompanying report
Not yet archived · Original link
(PART 2) CULTURAL PLAN
Accompanying report
Not yet archived · Original link
(PART 2) GEOTECH BASEMENT IMPACT ASSESSMENT_PART2
Accompanying report
Not yet archived · Original link
(PART 2) PLANNING FIRE STATEMENT1
Accompanying report
Not yet archived · Original link
(PART 2) PRE-DEMOLITION AUDIT
Accompanying report
Not yet archived · Original link
(PART 3) CIRCULAR ECONOMY STATEMENT
Accompanying report
Not yet archived · Original link
(PART 3) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 3) PLANNING FIRE STATEMENT1
Accompanying report
Not yet archived · Original link
(PART 4) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 5) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 6) GEOTECH BASEMENT IMPACT ASSESSMENT_PART6
Accompanying report
Not yet archived · Original link
(PART 7) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 8) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
(PART 9) GEOTECH BASEMENT IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
01820-WEA-XX-01-PD-A-0001
Site Plan
Not yet archived · Original link
01820-WEA-XX-01-PD-A-0002
Site Plan
Not yet archived · Original link
38 - 39 FURNIVAL STREET, EC4
Application Form
Not yet archived · Original link
3RD PARTY REVIEW OF WHOLE LIFE CARBON ASSESSMENT REPORT
Accompanying report
Not yet archived · Original link
AIR QUALITY ASSESSMENT
Accompanying report
Not yet archived · Original link
APPENDIX A CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
APPENDIX E CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
APPENDIX FCONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
ARCHAEOLOGICAL DESK-BASED ASSESSMENT
Report - Archaeological Report
Not yet archived · Original link
BE SEEN SPREADSHEET
Other
Not yet archived · Original link
BREEAM PRE-ASSESSMENT REPORT
Accompanying report
Not yet archived · Original link
CARBON EMISSIONS REPORTING SPREADSHEET
Other
Not yet archived · Original link
CIL FORM
Other
Not yet archived · Original link
CIL FORM
Other
Not yet archived · Original link
COL - SUPPLEMENTARY CLARIFICATION 02 FOR COMMENTS RECEIVED ON 15.03.2024
Accompanying report
Not yet archived · Original link
COMMENTS - CAAC
Consultee Comment
Not yet archived · Original link
COMMENTS - ENVIRONMENT AGENCY
Consultee Comment
Not yet archived · Original link
COMMENTS - HISTORIC ENGLAND
Consultee Comment
Not yet archived · Original link
COMMENTS - HISTORIC ENGLAND
Consultee Comment
Not yet archived · Original link
COMMENTS - THAMES WATER
Consultee Comment
Not yet archived · Original link
COMMENTS - THAMES WATER
Consultee Comment
Not yet archived · Original link
COMMENTS - TRANSPORT FOR LONDON
Consultee Comment
Not yet archived · Original link
COMMENTS - WESTMINSTER CITY COUNCIL
Consultee Comment
Not yet archived · Original link
COMMENTS-LONDON FIRE BRIGADE
Consultee Comment
Not yet archived · Original link
COMMENTS-TRANSPORT FOR LONDON
Consultee Comment
Not yet archived · Original link
CONSTRUCTION TRAFFIC MANAGEMENT REPORT
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Other
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Other
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT APPE
Accompanying report
Not yet archived · Original link
CORRESPONDENCE WITH WSP TRASPORT CONSULTANTS
Correspondence In
Not yet archived · Original link
COVER LETTER
Accompanying letters
Not yet archived · Original link
DAYLIGHT & SUNLIGHT REPORT
Report - Daylight/Sunlight Report
Not yet archived · Original link
DAYLIGHT & SUNLIGHT REPORT APPENDICES
Report - Daylight/Sunlight Report
Not yet archived · Original link
DAYLIGHT AND SUNLIGHT ADDENDUM RESPONSE FROM GIA
Correspondence In
Not yet archived · Original link
DAYLIGHT SUNLIGHT RESPONSE
Correspondence In
Not yet archived · Original link
DAYLIGHT SUNLIGHT RESPONSE 1
Other
Not yet archived · Original link
DAYLIGHT SUNLIGHT RESPONSE 1
Other
Not yet archived · Original link
DELIVERY AND SERVICING PLAN
Accompanying report
Not yet archived · Original link
DELIVERY AND SERVICING PLAN
Accompanying report
Not yet archived · Original link
DELIVERY AND SERVICING PLAN
Accompanying report
Not yet archived · Original link
DELIVERY AND SERVICING PLAN
Accompanying report
Not yet archived · Original link
DEMOLITION DRAWINGS
Drawing
Not yet archived · Original link
DEMOLITION PLANS
Drawing
Not yet archived · Original link
DOCUMENT SCHEDULE
Other
Not yet archived · Original link
DWG SCHEDULE
Drawings Schedule
Not yet archived · Original link
ENERGY-STATEMENT AND OVERHEATING ASSESSMENT
Accompanying report
Not yet archived · Original link
EQUALITY IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
FABRIC RETENTION STRATEGY
Accompanying report
Not yet archived · Original link
FACADE DETAILS
Drawing
Not yet archived · Original link
FACADE TYPE 03 - GROUND FLOOR - EXIT
Drawing
Not yet archived · Original link
FACADE TYPE 03B - GROUND FLOOR - ENTRANCE
Drawing
Not yet archived · Original link
FACADE TYPE 05 - PLANT SCREEN
Drawing
Not yet archived · Original link
FAÇADE TYPE 01 - GLASS BRICK - LOWER
Drawing
Not yet archived · Original link
FAÇADE TYPE 01B - GLASS BRICK - UPPER
Drawing
Not yet archived · Original link
FAÇADE TYPE 02 - REINSTATED BRICK
Drawing
Not yet archived · Original link
FAÇADE TYPE 04 - L04 TERRACE
Drawing
Not yet archived · Original link
FLOOD EVACUATION PLAN
Accompanying report
Not yet archived · Original link
FRA AND DRAINAGE PART 1
Accompanying report
Not yet archived · Original link
FRA AND DRAINAGE PART 2
Accompanying report
Not yet archived · Original link
FRAMEWORK TRAVEL PLAN
Report - Travel Plan
Not yet archived · Original link
FULWOOD PLACE ELEVATIONS
Drawing
Not yet archived · Original link
FULWOOD PLACE GENERAL ARRANGEMENT
Drawing
Not yet archived · Original link
FURNIVAL - CENTRAL LIFT DETAIL
Drawing
Not yet archived · Original link
FURNIVAL ST - OVERALL PROPOSED WEST ELEVATION (FRONT)
Drawing
Not yet archived · Original link
FURNIVAL ST - PROPOSED EAST ELEVATION
Drawing
Not yet archived · Original link
FURNIVAL ST - PROPOSED SOUTH ELEVATION
Drawing
Not yet archived · Original link
FURNIVAL ST - PROPOSED WEST ELEVATION (FRONT)
Drawing
Not yet archived · Original link
FURNIVAL STREET - GA BUILDING SECTION AA
Drawing
Not yet archived · Original link
FURNIVAL STREET - GA BUILDING SECTION BB
Drawing
Not yet archived · Original link
FURNIVAL STREET - GA BUILDING SECTION CC
Drawing
Not yet archived · Original link
FURNIVAL STREET - GA SHAFT SECTION AA
Drawing
Not yet archived · Original link
FURNIVAL STREET - GA SHAFT SECTION CC
Drawing
Not yet archived · Original link
FURNIVAL STREET - STAFF BIKE STORE
Drawing
Not yet archived · Original link
FURNIVAL STREET ELEVATIONS
Drawing
Not yet archived · Original link
FURNIVAL STREET EXISTING - GA SECTION CC
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - EXISTING L03 PLAN
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - EXISTING L04 PLAN
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - EXISTING L05
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - PROPOSED B1 PLAN
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - PROPOSED L00 PLAN
Drawing
Not yet archived · Original link
FURNIVAL STREET GA - PROPOSED L02 PLAN
Drawing
Not yet archived · Original link
FURNIVAL STREET GENERAL ARRANGEMENT
Drawing
Not yet archived · Original link
HEALTH IMPACT ASSESSMENT
Accompanying report
Not yet archived · Original link
HERITAGE STATEMENT
Accompanying report
Not yet archived · Original link
LIGHTING STRATEGY REPORT
Accompanying report
Not yet archived · Original link
MOBILITY SCOOTER ACCESS TO CYCLE STORE
Drawing
Not yet archived · Original link
NOISE AND VIBRATION IMPACT ASSESSMENT
Report - Acoustic/Noise Report
Not yet archived · Original link
PART 01 DESIGN & ACCESS ATATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 02 DESIGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 03 DESIGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 04 DESIGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 05 DESIGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 06 DESIGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PART 07 DEISGN & ACCESS STATEMENT
Report - Design & Access Statement/Report
Not yet archived · Original link
PLANNING POLICY NOTE
Other
Not yet archived · Original link
PLANNING STATEMENT
Report - Planning Statement/Report
Not yet archived · Original link
Drawing
Archived · Original link
REPORTING TEMPLATE
Other
Not yet archived · Original link
REPRESENTATION - BRIAN COTSEN
Public Comment
Not yet archived · Original link
REPRESENTATION - CENTRAL DISTRICT ALLIANCE
Public Comment
Not yet archived · Original link
REPRESENTATION - CHANCERY EXCHANGE
Public Comment
Not yet archived · Original link
REPRESENTATION - CHLOE NASH
Public Comment
Not yet archived · Original link
REPRESENTATION - FURNIVAL MANAGEMENT LIMITED
Public Comment
Not yet archived · Original link
REPRESENTATION - JOANNE SANTA MARIA
Public Comment
Not yet archived · Original link
REPRESENTATION - LEYI WANG
Public Comment
Not yet archived · Original link
REPRESENTATION - LISA ZAZZERA
Public Comment
Not yet archived · Original link
REPRESENTATION - LIZ SPEIRS
Public Comment
Not yet archived · Original link
REPRESENTATION - MRS G BIRRI
Public Comment
Not yet archived · Original link
REPRESENTATION - WALTER SCOTT
Public Comment
Not yet archived · Original link
REPRESENTATION-JULIE BIRRI
Public Comment
Not yet archived · Original link
REPRESENTATION-PROFESSOR SUSAN V. SCOTT
Public Comment
Not yet archived · Original link
REPRESSENTATIONS-FURNIVAL MANAGEMENT LIMITED
Public Comment
Not yet archived · Original link
SCHEDULE OF APPLICATION DOCUMENTS
Other
Not yet archived · Original link
SCHEDULE OF APPLICATION DRAWINGS
Drawings Schedule
Not yet archived · Original link
SECTIONS
Drawing
Not yet archived · Original link
SOCIO ECONOMIC ASSESSMENT
Accompanying report
Not yet archived · Original link
STATEMENT OF COMMUNITY INVOLVEMENT
Accompanying report
Not yet archived · Original link
STRUCTURAL REPORT PART 1
Other
Not yet archived · Original link
STRUCTURAL REPORT PART 2
Other
Not yet archived · Original link
SUPPLEMENTARY CLARIFICATION 01
Accompanying report
Not yet archived · Original link
SUPPLEMENTARY CLARIFICATION 02
Accompanying report
Not yet archived · Original link
SUPPLEMENTARY CLARIFICATION 03
Accompanying report
Not yet archived · Original link
SUPPLEMENTARY CLARIFICATION 04
Accompanying report
Not yet archived · Original link
SUSTAINABILITY & ENERGY SUMMARY
Accompanying report
Not yet archived · Original link
SUSTAINABILITY STATEMENT
Accompanying report
Not yet archived · Original link
TRANSPORT ASSESSMENT
Report - Transport Statement/Report
Not yet archived · Original link
TRANSPORT ASSESSMENT
Report - Transport Statement/Report
Not yet archived · Original link
TRANSPORT ASSESSMENT ADDENDUM
Report - Travel Plan
Not yet archived · Original link
TRANSPORT ASSESSMENT PART 1
Report - Transport Statement/Report
Not yet archived · Original link
TRANSPORT ASSESSMENT PART 2
Report - Transport Statement/Report
Not yet archived · Original link
TRANSPORT ASSESSMENT PART 3
Report - Transport Statement/Report
Not yet archived · Original link
TRANSPORT ASSESSMENT PART 4
Report - Transport Statement/Report
Not yet archived · Original link
TRAVEL PLAN
Report - Travel Plan
Not yet archived · Original link
TRAVEL PLAN
Report - Travel Plan
Not yet archived · Original link
TRAVEL PLAN
Report - Travel Plan
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR A PLAN
Drawing
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR B PLAN
Drawing
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR B PLAN
Drawing
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR B PLAN BIKE STORE CALLOUT
Drawing
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR B PLAN BIKE STORE CALLOUT
Drawing
Not yet archived · Original link
TUNNELS GA - PROPOSED SECTOR C & D PLAN
Drawing
Not yet archived · Original link
TUNNELS GENERAL ARRANGEMENT
Drawing
Not yet archived · Original link
TUNNELS PLC PLANNING ADDENDUM FURNIVAL STREET - STAFF BIKE STORE
Drawing
Not yet archived · Original link
TUNNELS PLC PLANNING ADDENDUM FURNIVAL STREET GA - PROPOSED L00 PLAN
Drawing
Not yet archived · Original link
VISION ZERO / HEALTHY STREETS PLAN
Drawing
Not yet archived · Original link
WASTE MANAGEMENT PLAN
Accompanying report
Not yet archived · Original link
WASTE MANAGEMENT PLAN
Report - Servicing/Waste Mgmt. Statement/Report
Not yet archived · Original link
WHOLE LIFE CARBON ASSESSMENT
Accompanying report
Not yet archived · Original link
WLC REPORTING TEMPLATE
Other
Not yet archived · Original link
WSP - RESPONSE TO CITY OF LONDON - ENERGY STRATEGY
Correspondence In
Not yet archived · Original link
WSP - RESPONSE TO CITY OF LONDON AIR QUALITY COMMENTS
Correspondence In
Not yet archived · Original link
WSP - RESPONSE TO CITY OF LONDON AND LONDON BOROUGH OF CAMDEN?S QUERIES
Other
Not yet archived · Original link
WSP - RESPONSE TO LONDON FIRE BRIGADE?S COMMENTS
Correspondence In
Not yet archived · Original link
WSP - RESPONSE TO THE COL AND CAMDEN?S REVIEW OF THE ENERGY STRATEGY REPORT
Other
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment