26/00344/OBS
City of London
Status
Full proposal
Demolition of existing structures (including part of the listed police station building) and phased redevelopment [of up to 24 storeys (residential equivalent) with basement levels] to include residential development (Class C3), commercial, business and service uses (Class E), film production uses (Sui Generis), education uses (Class F1), visitor accommodation (Class C1), re-provided recycling facility (Sui Generis), local community uses (Class F2), cinema (Sui Generis), drinking establishment (Sui Generis), and studio experience / museum (Sui Generis) together with supporting infrastructure including new and upgraded routes; landscaping, public realm and highway works; energy centre and plant installation; cycle parking and disabled car parking. NOTE: Re-consultation due to the submission of revised drawings and documents relating to design changes throughout; notably to the north-west corner of the site and involving the energy centre and Heathgate residential buildings. Re-consultation period will run for 14 days.
Documents
No documents have been archived for this application.
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.