← Coventry City Council

Status

Pending Commercial
Received
Not recorded
New homes
0

Full proposal

Demolition of existing petrol filling station and associated infrastructure and erection of replacement petrol filling station comprising new forecourt layout with fuel pumps, jet wash, ancillary retail shop, parking, revised access and associated...

Documents

Application Form
Application form (redacted)
Not yet archived · Original link
ApplicationFormRedacted.pdf
Application form (redacted)
Not yet archived · Original link
Arboricultural Impact Assessment and Tree Survey
Tree survey/arboricultural implications
Not yet archived · Original link
Design and Access Statement
Design and access statement
Not yet archived · Original link
Drainage Strategy
Drainage
Not yet archived · Original link
Existing Site Layout Plan DWG PL03
Layout plans
Not yet archived · Original link
L251203 SAV Cover Letter.pdf
Covering letter (Public)
Not yet archived · Original link
Location Plan DWG PL02C
Location plan
Not yet archived · Original link
Noise Impact Assessment
Noise impact assessment
Not yet archived · Original link
Phase 1 Preliminary Risk Assessment Part 1
Supporting information
Not yet archived · Original link
Phase 1 Preliminary Risk Assessment Part 2
Supporting information
Not yet archived · Original link
Proposed Elevations DWG PL07
Elevations
Not yet archived · Original link
Proposed Floor Plans and Elevations DWG PL06
Elevations
Not yet archived · Original link
Proposed Site Layout Plan DWG PL01
Layout plans
Not yet archived · Original link
Proposed Site Plan DWG PL05
Site plans
Not yet archived · Original link
SAD-epd-VES-01-DR-L-0003 P03 Tree Protection Plan.pdf
Detail drawing
Not yet archived · Original link
Soft Landscaping Plan DWG ELS 01 DR L 0001 P03
Landscaping plan/details
Not yet archived · Original link
Transport Assessment
Transport assessment
Not yet archived · Original link
Tree Constrains Plan DWG DR L 0001 P02
Detail drawing
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment