CR/2024/0503/FUL
Crawley Borough Council
Status
Permit
Commercial
Received
25 Oct 2024
New homes
0
Full proposal
The proposed installation of heating ventilation and air conditioning (HVAC) plant located on flat roofs to the rear of the building. Replacement of four air conditioning units and two heat recovery units, together with the removal of two air handling units. Two louvre ventilation terminals on the rear elevation.
Documents
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.