26/00059/FUL
Dartford Borough Council
Status
Awaiting decision
Commercial
Received
22 Jan 2026
New homes
0
Full proposal
Installation of sprinkler infrastructure and associated works including erection of 2 tanks and a pump house and enclosures; removal of parking spaces. Removal of upper roof level windows and replaced with new ventilation louvres (AOVs), associated cladding. Openings to façade for installation of ventilation grilles. Handrails to lower roof plant access. Blocking of ground level external door. Replacement of rooflights with new Velux rooflights. Erection of new UKPN electrical Kiosk. Installation of mechanical ventilation fan and associated ductwork to main roof.
Documents
6000090-IWD-XX-XX-DR-A-2040-PROPOSED SPRINKLER TANKS AND LANDSCAPING-C02-
Drawings
Not yet archived
· Original link
6000090-IWD-XX-XX-DR-A-2041-PROPOSED SPRINKLER TANK ELEVATIONS AND SECTIONS-C02-
Drawings
Not yet archived
· Original link
6000090-IWD-XX-ZZ-DR-A-2300-EXISTING ELEVATIONS SHEET 1 OF 2-C02-
Drawings
Not yet archived
· Original link
6000090-IWD-XX-ZZ-DR-A-2301-EXISTING ELEVATIONS SHEET 2 OF 2-C02-
Drawings
Not yet archived
· Original link
6000090-IWD-XX-ZZ-DR-A-2302-PROPOSED ELEVATIONS SHEET 1 OF 2-C02-
Drawings
Not yet archived
· Original link
6000090-IWD-XX-ZZ-DR-A-2303-PROPOSED ELEVATIONS SHEET 2 OF 2-C02-
Drawings
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.