← Dumfries and Galloway Council
24/2623/FUL
Dumfries and Galloway Council
Status
Pending
Renewable energy
Received
Not recorded
New homes
0
Full proposal
ERECTION OF 4 WIND TURBINES ( 4 TURBINES 149.9 METRES MAXIMUM HEIGHT TO BLADE TIP) WITH BATTERY ENERGY STORAGE SYSTEM, CONTROL BUILDING AND SUBSTATION, FORMATION OF ACCESS TRACKS AND SITE ACCESS JUNCTION ONTO B738, WATERCOURSE CROSSINGS, PASSING PLACES, CRANE HARDSTANDINGS, TEMPORARY CONSTRUCTION COMPOUND AND BORROW PIT, TEMPORARY CLEARANCE/LAYDOWN AREAS AND ASSOCIATED INFRASTRUCTURE
Documents
No documents have been archived for this application.
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.