← London Borough of Ealing

Status

Pending Consideration New housing
Received
04 Sep 2025
New homes
3

Summary

Create three self-contained flats via first/second/third floor extensions above existing shop and first-floor flat (net +2).

Full proposal

Construction of three self-contained flats; part first floor rear extension; second and third floor extension above existing ground floor shop and first floor flat

Documents

21 STATION PARADE BLOCK PLAN 2
Draw - Exist Site/Block Plan
Not yet archived · Original link
21 STATION PARADE LOC
Draw - Location Plan
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form - Without Personal Data
Not yet archived · Original link
CONSERVATION SITE NOTICE
Site Notice
Not yet archived · Original link
EX ELEVS
Draw - Exist Elevations
Not yet archived · Original link
EX PLANS
Draw - Exist Floor Plan
Not yet archived · Original link
LAMPOST LOCATIONS
Site Notice
Not yet archived · Original link
NEIGHBOUR SITE NOTICE
Site Notice
Not yet archived · Original link
OBJECTION
Comment - Public
Not yet archived · Original link
PROP ELEVATIONS 6 SUBMIT
Draw - Prop Elevations
Not yet archived · Original link
PROP PLANS 5 SUBMIT
Draw - Prop Floor Plan
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment