← London Borough of Ealing

Status

Pending Consideration House extension
Received
Last month
New homes
0

Full proposal

Alteration of roof from hip to gable end; rear roof extension, installation of two rooflights to front roof slope; installation of one window to side gable; alterations to side fenestrations and solar panels to the rear dormer flat roof (Joint Application)

Documents

260537HH SM.PDF
Drawing
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form - Without Personal Data
Not yet archived · Original link
CLR.20.22-1000_EXISTING GROUND FLOOR PLANS
Drawing
Not yet archived · Original link
CLR.20.22-1001_EXISTING FIRST FLOOR PLANS
Drawing
Not yet archived · Original link
CLR.20.22-1002_EXISTING ROOF PLANS
Drawing
Not yet archived · Original link
CLR.20.22-1200_EXISTING NORTH AND SOUTH ELEVATIONS
Drawing
Not yet archived · Original link
CLR.20.22-1201_EXISTING EAST AND WEST ELEVATIONS
Drawing
Not yet archived · Original link
CLR.20.22-2000_PROPOSED GROUND FLOOR PLAN
Drawing
Not yet archived · Original link
CLR.20.22-2001_PROPOSED FIRST FLOOR PLAN
Drawing
Not yet archived · Original link
CLR.20.22-2002_PROPOSED SECOND FLOOR PLAN
Drawing
Not yet archived · Original link
CLR.20.22-2003_PROPOSED ROOF PLANS
Drawing
Not yet archived · Original link
CLR.20.22-2200_PROPOSED NORTH AND SOUTH ELEVATION
Drawing
Not yet archived · Original link
CLR.20.22-2201_PROPOSED EAST AND WEST ELEVATION
Drawing
Not yet archived · Original link
CLR.20.22-4000_LOCATION PLAN
Drawing
Not yet archived · Original link
CONSERVATION SITE NOTICE
Site Notice
Not yet archived · Original link
DESIGN ACCESS AND HERITAGE STATEMENT
Design and Access Statement
Not yet archived · Original link
NO 20 22-FULL FORM FILLED AMENDED REDACTED.PDF
Application Form - Redacted
Not yet archived · Original link
PARKING PROVISION DETAILS
Transport Assessment
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment