← Back to Greenwich
Status
Registered
Received
11 Oct 2024
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Demolition of existing structures, alongside the partial demolition, refurbishment and extension of the Electric Works building, for the erection of a residential led mixed use development comprising residential accommodation (Class C3), shared living accommodation (Sui Generis) and student accommodation (Sui Generis), alongside commercial (Class E), community (Class F) and replacement Market Pound (Sui Generis) with associated public realm, blue-badge and cycle parking, open space, hard and soft landscaping and other works incidental to the proposed development. Further details of the proposed development includes the following, which does not form part of the formal description of development: 930 student accommodation beds in Blocks A and B 425 shared living accommodation in Block C 93 residential dwellings (all affordable homes) Reprovision of the market pound 499 sq m of commercial / community floor space 169 sq m children's nursery Additionally, the development will involve the construction of five new buildings: Blocks A and B (7-23 stories), Block C (11-19 stories), Block D (8-10 stories), Block F (3-5 stories), and Block E (partial demolition, refurbishment, and extension of the Electric Works building to 4-5 stories). (This application is an EIA development and is accompanied by an Environmental Statement and an Environmental Statement Addendum) (The development may impact on the setting of the nearby designated heritage assets including Grade I, Grade II* and Grade II listed buildings, and the Royal Arsenal and Woolwich Conservation Areas) (Re-consultation is required following the submission of amended plans, updated reports, and an Environmental Statement Addendum. Key changes to the scheme include a reduction in the height of parts of Blocks A and B and an increase in the height of Block C to provide an additional floor. These revisions result in an increase of 12 PBSA (Purpose-Built Student Accommodation) beds and 16 LSPBSL (Large-Scale Purpose Built Shared Living) rooms. Furthermore, a new café kiosk within the public realm has been introduced as part of these amendments).
Documents
Accessible unit types general arrangement
Drawing
Accessible units types general arrngement
Drawing
Acknowledgement letter
Correspondence
Acknowledgement letter
Correspondence
Air quality: annex 1 - 9
Document
Amenity spaces
Revised Drawing
Appendix: air quality
Report
Appendix: daylight, sunlight, overshadowing and solar glare
Report
Appendix: introduction
Report
Appendix: socio-economics
Report
Appendix: wind microclimate
Report
Application form
Application Form
Arboricultural survey and impact assessment
Document
Archaeological desk based assessment
Document
Basement impact assessment
Superseded
Basement impact assessment report
Report
Basement plan
Revised Drawing
Bat survey report
Document
Biodiversity net gain assessment
Superseded
Biodiversity net gain assessment
Report
Biodiversity net gain assessment
Report
Black redstart survey report
Document
Block a - bay study 01
Revised Drawing
Block a - bay study 02
Revised Drawing
Block a - bay study 03
Revised Drawing
Block a - bay study 04
Revised Drawing
Block b - bay study 01
Revised Drawing
Block b - bay study 02
Revised Drawing
Block b - bay study 03
Revised Drawing
Block b - bay study 04 general arrangement
Drawing
Block c - bay study 01
Drawing
Block c - bay study 02
Drawing
Block c - bay study 03
Drawing
Block c - bay study 04
Drawing
Block c - bay study 05
Drawing
Block d - bay study 01 general arrangement
Drawing
Block d - bay study 02 general arrangement
Drawing
Breeam pre assessment report
Document
Breeam pre assessment report
Document
Breeam pre assessment report
Document
Built heritage, townscape and visual impact assessment
Report
Built heritage, townscape and visual impact assessment (part 1 of 7)
Superseded
Built heritage, townscape and visual impact assessment (part 2 of 7)
Superseded
Built heritage, townscape and visual impact assessment (part 3 of 8)
Superseded
Built heritage, townscape and visual impact assessment (part 4 of 7)
Superseded
Built heritage, townscape and visual impact assessment (part 5 of 7)
Superseded
Built heritage, townscape and visual impact assessment (part 6 of 7)
Superseded
Built heritage, townscape and visual impact assessment (part 7 of 7)
Superseded
Carbon emissions reporting spreadsheet
Document
Chapter 1-5: introduction, 2025 amendments and es addendum approach
Report
Chapter 10: wind microclimate
Document
Chapter 10: wind microclimate
Report
Chapter 11: climate change and greenhouse gases
Report
Chapter 11: climate change and greenhouse gases
Document
Chapter 12-14: summary and conclusions
Report
Chapter 12: effect interactions
Document
Chapter 13: likely significant effects
Document
Chapter 14: environmental management, mitigation and monitoring schedule
Document
Chapter 3: alternatives and design evolution
Document
Chapter 4: the proposed development
Document
Chapter 5: demolition and construction
Document
Chapter 6: socio-economics
Report
Chapter 6: socio-economics
Document
Chapter 7: air quality
Document
Chapter 7: air quality
Report
Chapter 8: noise and vibration
Document
Chapter 8: noise and vibration
Report
Chapter 9: daylight, sunlight, overshadowing and solar glare
Document
Chapter 9: daylight, sunlight, overshadowing and solar glare
Report
Circular economy spreadsheet
Report
Circular economy statement
Superseded
Climate change and greenhouse gases: annex 1
Document
Climate change and greenhouse gases: annex 2 - 5
Document
Daylight and sunlight report
Document
Daylight, sunlight, overshadowing and solar glare: annex 1
Document
Daylight, sunlight, overshadowing and solar glare: annex 2
Document
Daylight, sunlight, overshadowing and solar glare: annex 3
Document
Daylight, sunlight, overshadowing and solar glare: annex 4
Document
Daylight, sunlight, overshadowing and solar glare: annex 5
Document
Daylight, sunlight, overshadowing and solar glare: annex 6
Document
Daylight, sunlight, overshadowing and solar glare: annex 7
Document
Daylight, sunlight, overshadowing and solar glare: annex 8
Document
Daylight, sunlight, overshadowing and solar glare: annex 9
Document
Daylight, sunlight, overshadowing report
Report
Delivery and servicing plan
Document
Demolition and construction: annex 1
Document
Demolition and construction: annex 2
Document
Design and access statement
Document
Design and access statement
Report
Design and access statement
Document
Design and access statement
Document
Document schedule
Document
Document schedule (amendment only)
Revised Drawing
Drainage strategy report
Superseded
Drainage strategy report
Report
Drainage strategy: sitewide design
Report
Eia methodology: annex 1 (part 1 of 9)
Document
Eia methodology: annex 1 (part 2 of 9)
Document
Eia methodology: annex 1 (part 3 of 9)
Document
Eia methodology: annex 1 (part 4 of 9)
Document
Eia methodology: annex 1 (part 5 of 9)
Document
Eia methodology: annex 1 (part 6 of 9)
Document
Eia methodology: annex 1 (part 7 of 9)
Document
Eia methodology: annex 1 (part 8 of 9)
Document
Eia methodology: annex 1 (part 9 of 9)
Document
Eia methodology: annex 2
Document
Eia methodology: annex 3 (part 1 of 2)
Document
Eia methodology: annex 3 (part 2 of 2)
Document
Eia methodology: annex 4
Document
Electric works - accessible unit types general arrangement
Drawing
Electric works - demolition elevation sheet 1/2 general arrangement
Drawing
Electric works - demolition elevation sheet 2/2 general arrangement
Drawing
Electric works - demolition ground floor plan general arrangement
Drawing
Electric works - demolition level 01 plan general arrangement
Drawing
Electric works - demolition level 02 plan general arrangement
Drawing
Electric works - demolition level 03 plan general arrangement
Drawing
Electric works - demolition roof plan general arrangement
Drawing
Electric works - existing elevation sheet 1/2 general arrangement
Drawing
Electric works - existing elevation sheet 2/2 general arrangement
Drawing
Electric works - existing ground floor plan general arrangement
Drawing
Electric works - existing level 01 plan general arrangement
Drawing
Electric works - existing level 02 plan general arrangement
Drawing
Electric works - existing level 03 plan general arrangement
Drawing
Electric works - existing roof plan general arrangement
Drawing
Electric works - existing sections a-a + b-b general arrangement
Drawing
Electric works - proposed elevation sheet 1/2 general arrangement
Drawing
Electric works - proposed elevation sheet 2/2 general arrangement
Drawing
Electric works - proposed ground floor plan general arrangement
Drawing
Electric works - proposed level 01 plan general arrangement
Drawing
Electric works - proposed level 02 plan general arrangement
Drawing
Electric works - proposed level 03 plan general arrangement
Drawing
Electric works - proposed level 04 plan general arrangement
Drawing
Electric works - proposed roof plan general arrangement
Drawing
Electric works - proposed sections general arrangement
Drawing
Energy and sustainability assessment
Report
Energy and sustainability assessment
Superseded
Existing site elevations
Drawing
Existing site sections
Drawing
Facade bay study 01 block e
Drawing
Facade bay study 02 block f
Drawing
Flood risk assessment
Superseded
Flood risk assessment
Report
Gateway one fire statement
Report
Gateway one fire statement
Superseded
Ground floor colour masterplan
Revised Drawing
Ground floor landscape masterplan
Drawing
Ground floor plan
Revised Drawing
Ground floor ugf layout
Revised Drawing
Hard and soft landscape areas
Report
Health impact assessment
Report
Health impact assessment
Document
Healthy streets transport assessment
Document
Introduction: annex 1
Document
Introduction: annex 2
Document
Introduction: annex 3
Document
Landscape strategy
Report
Landscape strategy
Document
Level 01 plan
Revised Drawing
Level 02 plan
Revised Drawing
Level 03 plan
Revised Drawing
Level 04 plan
Revised Drawing
Level 05 plan
Revised Drawing
Level 06 plan
Revised Drawing
Level 07 plan
Revised Drawing
Level 08 plan
Revised Drawing
Level 09 plan
Revised Drawing
Level 10 plan
Revised Drawing
Level 11 plan
Revised Drawing
Level 12 plan
Revised Drawing
Level 13 plan
Revised Drawing
Level 14 plan
Revised Drawing
Level 15 plan
Revised Drawing
Level 16 plan
Revised Drawing
Level 17 plan
Revised Drawing
Level 18 plan
Revised Drawing
Level 19 plan
Revised Drawing
Level 20 plan
Revised Drawing
Level 21 plan
Revised Drawing
Level 22 plan
Revised Drawing
London plan fire statement
Report
London policy d12(b) and d5b(5) fire statement
Superseded
Noise and vibration: annex 1
Document
Noise and vibration: annex 2
Document
Noise and vibration: annex 3
Document
Noise and vibration: annex 4
Document
Noise and vibration: annex 5
Document
Non technical summary
Document
Operational waste management strategy
Document
Outline construction logistics plan
Document
Pbsa - accessible units studio units
Drawing
Pbsa operations management plan
Document
Phase 1 ? geotechnical and geo-environmental desk study
Document
Phase 1 geotechnical and geoenvironmental desk study
Report
Planning statement
Document
Planning statement
Report
Play strategy
Revised Drawing
Pre-demolition audit
Report
Preliminary ecological appraisal
Document
Proposed site elevation a beresford street
Revised Drawing
Proposed site elevation b beresford sqaure
Drawing
Proposed site elevation c powis street
Revised Drawing
Proposed site elevation d macbean street
Revised Drawing
Proposed site elevation e electric square west
Revised Drawing
Proposed site elevation f electric square east
Revised Drawing
Proposed site elevation g murray square west
Revised Drawing
Proposed site elevation h macbean street
Drawing
Proposed site elevation j macbean street
Drawing
Proposed site elevation k & l block a & b internals
Revised Drawing
Proposed site section a-a
Revised Drawing
Proposed site section b-b
Revised Drawing
Proposed site section c-c
Revised Drawing
Proposed site section d-d
Revised Drawing
Proposed site section e-e
Drawing
Proposed site section f-f
Drawing
Proposed site section g-g
Revised Drawing
Purpose built student accommodation needs assessment
Document
Revised non-technical assessment
Report
Riba stage 2 fire strategy
Report
Riba stage 2 fire strategy
Document
Roof level colour masterplan
Revised Drawing
Roof level landscape masterplan
Drawing
Roof levels ugf layout
Revised Drawing
Roof plan
Revised Drawing
Schedule of accommodation
Revised Drawing
Shared living operations management plan
Document
Shared-living needs assessment
Document
Socio-economics: annex 1
Document
Statement of community involvement
Document
Statutory biodiversity metric
Superseded
Transport & waste addendum note
Report
Volume 1: chapter 1 introduction
Document
Volume 1: chapter 2 eia methodology
Document
Whole life carbon assessment
Report
Whole life carbon assessment
Document
Whole life carbon spreadsheets
Document
Whole life carbon spreadsheets
Document
Whole life carbon spreadsheets
Document
Whole life carbon spreadsheets
Report
Whole life carbon spreadsheets
Report
Whole life carbon spreadsheets
Document
Whole life carbon spreadsheets
Document
Wind microclimate: annex 1 - 4
Document