← Back to Greenwich
Status
Registered
New housing
Received
12 Mar 2025
New dwellings
802
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Demolish and construct mixed-use buildings (1–30 storeys) providing 802 residential homes and commercial/community uses.
Full Proposal
Demolition of existing building and construction of buildings ranging from 1 to 30 storeys for residential (Class C3) and Class E, local community (Class F2), education (Class F1), and drinking establishment (Sui Generis) use; cycle parking and facilities, landscaping and highway improvements, servicing and plant and all other ancillary and associated works. (This application is an EIA development and is accompanied by an Environmental Statement) (This is a cross borough application with the London Borough of Lewisham, their reference: DC/25/139390) [RE-CONSULTATION] Further information not forming part of the formal description of development provided for re-consultation purposes: This application is located both within the Royal Borough of Greenwich (RBG) and London Borough of Lewisham (LBL). The scheme as a whole provides 802 C3 residential homes across both boroughs (down from 903 C3 homes originally proposed) This equates to 254 C3 residential homes in RBG (down from 306 C3 homes originally proposed) and 548 C3 homes in LBL (down from 597 C3 homes originally proposed) The schemes non-commercial floorspace has lowered from 8,713m2 GIA to 8,571m2 Non-commercial floorspace made up of 5,213m2 GIA Education (Class F1), 508m2 GIA Retail (Class E (a), 841m2 GIA Food and Beverage (Class E (b)/Sui Generis), 1579m2 GIA Workspace (Class E (c/g)) and 430m2 GIA Shared Back of House (3,358m2 non-residential floorspace within RBG and 5,213m2 non-residential floorspace within LBL) The proposed buildings height and massing have been further clarified below to include the ground floors. Building A is 30 storey, Building B is 7-11 storeys, Building C is 15 storeys and Building D is 18 storeys (These are all based in LBL). Building E is 19 storeys (reduced from 24 storeys originally submitted), Building F is 10 storeys, Building G is 10 storeys and Building H is 1 storeys (These are all based in RBG).
Documents
Acknowledgement letter
Correspondence
Amended - addendum to the environmental statement
Document
Amended - addendum to the environmental statement (appendices list)
Document
Amended - addendum to the environmental statement (appendix a)
Document
Amended - addendum to the environmental statement (appendix b(i)-b(xiii))
Document
Amended - addendum to the environmental statement (appendix c)
Document
Amended - addendum to the environmental statement (appendix d - part 1)
Document
Amended - addendum to the environmental statement (appendix d - part 2)
Document
Amended - addendum to the environmental statement (appendix e)
Document
Amended - addendum to the environmental statement (appendix f)
Document
Amended - addendum to the environmental statement (appendix g)
Document
Amended - addendum to the environmental statement (appendix h)
Document
Amended - addendum to the environmental statement (appendix i)
Document
Amended - addendum to the environmental statement (appendix j)
Document
Amended - addendum to the environmental statement (appendix k)
Document
Amended - addendum to the environmental statement (appendix l)
Document
Amended - addendum to the environmental statement (appendix m)
Document
Amended - addendum to the environmental statement (appendix n - part 1)
Document
Amended - addendum to the environmental statement (appendix n - part 2)
Document
Amended - addendum to the environmental statement (appendix o)
Document
Amended - addendum to the environmental statement (appendix p)
Document
Amended - addendum to the environmental statement (figures list)
Document
Amended - addendum to the environmental statement (figures)
Document
Amended - addendum to the environmental statement (non technical statement)
Document
Amended - addendum to the environmental statement (non-technical statement)
Document
Amended - arboricultural report
Document
Amended - circular economy assessment
Document
Amended - circular economy assessment - appendix b
Document
Amended - circular economy assessment - appendix c
Document
Amended - circular economy assessment - appendix d
Document
Amended - circular economy assessment - appendix e
Document
Amended - circular economy assessment - appendix g
Document
Amended - circular economy assessment - appendix h
Document
Amended - combined block e, f, g and h elevations - greenwich
Drawing
Amended - combined blocks a and b elevations - lewisham
Drawing
Amended - combined blocks a and b plans - lewisham
Drawing
Amended - combined blocks a and b sections - lewisham
Drawing
Amended - combined blocks c and d elevations - lewisham
Drawing
Amended - combined blocks c and d plans - lewisham
Drawing
Amended - combined blocks c and d sections - lewisham
Drawing
Amended - combined blocks e, f, g and h plans - greenwich
Drawing
Amended - combined blocks e, f, g and h sections - lewisham
Drawing
Amended - combined cemp (appendix g for circular economy statement)
Document
Amended - combined delivery and servicing plan
Document
Amended - combined existing block plans
Drawing
Amended - combined existing elevations
Drawing
Amended - combined landscaping design and access statement
Document
Amended - combined landscaping plans
Drawing
Amended - combined site wide elevations
Drawing
Amended - combined transport assessment
Document
Amended - combined travel plan
Document
Amended - combined waste management strategy (appendix f from circular economy s
Document
Amended - covering letter
Document
Amended - design and access statement - part 1
Document
Amended - design and access statement - part 2
Document
Amended - drawing issue sheet
Document
Amended - economic statement addendum
Document
Amended - energy strategy
Document
Amended - energy strategy (appendix g - brukl - be lean details)
Document
Amended - energy strategy (appendix i - combined breeam details)
Document
Amended - energy strategy (appendix j - pv panels)
Document
Amended - energy strategy (appendix k - combined dhn correspondence)
Document
Amended - energy strategy (appendix l - combined ashp schematics)
Document
Amended - energy strategy (appendix m - combined future dhn location plans)
Document
Amended - energy strategy (appendix n - roof layout)
Document
Amended - external impact - daylight and sunlight report
Document
Amended - fire statement
Document
Amended - fire statement form
Document
Amended - flood risk assessment - part 1
Document
Amended - flood risk assessment - part 2
Document
Amended - gla carbon emission reporting spreadsheet - block a
Document
Amended - gla carbon emission reporting spreadsheet - block b
Document
Amended - gla carbon emission reporting spreadsheet - blocks c and d
Document
Amended - gla carbon emission reporting spreadsheet - blocks e and g
Document
Amended - gla carbon emission reporting spreadsheet - blocks f
Document
Amended - gla carbon emission reporting spreadsheet - greenwich
Document
Amended - gla carbon emission reporting spreadsheet - lewisham
Document
Amended - gla carbon emission reporting spreadsheet - site wide
Document
Amended - health impact assessment addendum
Document
Amended - heritage statement addendum
Document
Amended - internal impact - daylight and sunlight report
Document
Amended - phase 1 desk study report - part 1
Document
Amended - phase 1 desk study report - part 2
Document
Amended - planning statement
Document
Amended - proposed block plan
Drawing
Amended - retail impact assessment
Document
Amended - site wide ground floor block plan
Drawing
Amended - site wide roof plan
Drawing
Amended - site wide sections
Drawing
Amended - utilities statement
Document
Amended - ventilation statement
Document
Amended - viability report
Document
Amended - whole life cycle assessment
Document
Amended -biodiversity net gain metric spreadsheet
Document
Amended -biodiversity net gain metric spreadsheet
Document
Applicants response to glaas
Document
Application form
Application Form
Arboticultural impact assessment
Superseded
Archeology desk based assessment - june 2025
Document
Bng - combined plans
Drawing
Bng metric spreadsheet
Superseded
Circular economy gla spreadsheet
Superseded
Circular economy statement
Superseded
Combined landscaping plan and details
Superseded
Combined site wide elevations
Superseded
Correspondence between consultant and glaas
Correspondence
Daylight and sunlight report
Superseded
Delivery and servicing plan
Superseded
Design and access statement (lr version)
Superseded
Designing out crime statement
Document
Economic statement
Document
Energy and sustainability strategy
Superseded
Environmental statement - non technical summary
Document
Environmental statement - volume 1
Document
Environmental statement - volume 2 - townscape visual impact assessment combined
Document
Environmental statement - volume 3 - part 1
Document
Environmental statement - volume 3 - part 2
Document
Environmental statement - volume 3 - part 3
Document
Environmental statement - volume 3 - part 4
Document
Environmental statement - volume 3 - part 5
Document
Es volume 3 - appendix 12.2
Document
Existing elevations and plans including demolition plan
Superseded
Financial viability report
Document
Fire statement
Superseded
Fire statement form
Superseded
Flood risk assessment and drainage strategy - part 1
Superseded
Flood risk assessment and drainage strategy - part 2
Superseded
Greenwich side - buildings e,f,g and h proposed elevations
Superseded
Greenwich side - buildings e,f,g and h proposed sections
Superseded
Health impact assessment
Document
Heritage statement
Document
Internal daylight, sunlight & overshadowing assessment
Superseded
Landscaping design and access statement, public realm and landscape
Superseded
Lewisham side - buildings a and b proposed elevations
Superseded
Lewisham side - buildings a and b proposed sections
Superseded
Lewisham side - buildings c and d proposed elevations
Superseded
Lewisham sides - building c and d proposed sections
Superseded
Operational waste management strategy
Superseded
Outline construction environmental management plan
Superseded
Phase 1 - contaminated land report
Document
Planning statement
Superseded
Proposed site wide block plan
Superseded
Proposed site wide sections
Superseded
Retail impact assessment
Superseded
River impact study
Document
Statement of community involvement
Document
Tall building statement
Document
Transport assessment
Superseded
Utilities statement
Superseded
Ventilation statement
Superseded
Whole life carbon assessment
Superseded
Whole life carbon gla spreadsheet
Document