← Greenwich

Status

Registered New housing
Received
16 Sep 2025
New homes
2

Full proposal

Demolition of the existing ancillary buildings and construction of 2 x 3bedroom 4-person semi-detached houses with associated car parking, cycle parking, refuse storage and outdoor amenity space.

Documents

Acknowledgement letter
Correspondence
Not yet archived · Original link
Application form redacted
Application Form
Not yet archived · Original link
Bng report
Document
Not yet archived · Original link
Daylight and sunlight assessment
Document
Not yet archived · Original link
Demolition and construction management plan
Document
Not yet archived · Original link
Design and access statement
Document
Not yet archived · Original link
Existing and proposed street scene elevations
Drawing
Not yet archived · Original link
Existing block plan
Drawing
Not yet archived · Original link
Existing elevations
Drawing
Not yet archived · Original link
Existing location plan
Drawing
Not yet archived · Original link
Drawing
Archived · Original link
Fire statement
Document
Not yet archived · Original link
Preliminary ecological appraisal
Document
Not yet archived · Original link
Proposed block plan
Drawing
Not yet archived · Original link
Proposed elevations and section
Drawing
Not yet archived · Original link
Proposed elevations and section
Drawing
Not yet archived · Original link
Drawing
Archived · Original link
Drawing
Archived · Original link
Sustainability statement
Document
Not yet archived · Original link
The statutory metric macroenabled1.0.4 (3)
Document
Not yet archived · Original link
The_statutory_metric_macro_enabled
Document
Not yet archived · Original link
Tree survey, arboriculturassment & method statemen
Document
Not yet archived · Original link
Unknown
Document
Not yet archived · Original link
Unknown
Document
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment