← London Borough of Hackney

Status

Pending Listed building
Received
Not recorded
New homes
0

Full proposal

Repairs including: replacement of the existing flat roof; re-slating of the south-facing school roof, including the conical tower roof and curved box gutter; and drainage, brickwork, and stonework repairs.

Documents

ApplicationFormRedacted.pdf
Application Form
Not yet archived · Original link
APPX-E-SPECIFICATION-OF-WORK-Rev-A-29-04-2025
Document
Not yet archived · Original link
Design-Access-Statement-Phase-II-Works-05_06_2025
Design and Access Statement
Not yet archived · Original link
form-1-cil-additional-information-PP14454392
Document
Not yet archived · Original link
LocationPlan.pdf
Site Location Plan
Not yet archived · Original link
Report-Urgent-Roof-Repairs-29-04-2025
Document
Not yet archived · Original link
Scope-of-Works-03-11-2025-v5
Document
Not yet archived · Original link
Site-Location-Plan
Site Location Plan
Not yet archived · Original link
TENDER DRAWINGS .pdf
Drawing
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment