2025/1588
London Borough of Hackney
Status
Pending
House extension
Received
Not recorded
New homes
0
Summary
Side infill extension, loft conversion with dormers and solar panels.
Full proposal
Erection of a side infill extension with new glazing and rooflights. Extension to existing loft with proposed rear dormer and two front dormers. Installation of solar panels on the new rear dormer roof and the existing roof. Installation of two...
Documents
Elevation (Front) - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Elevation (Front) - Proposed_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Elevation (Rear) - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Elevation (Rear) - Proposed_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Elevation (Side) - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Elevation (Side) - Proposed_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Floor Plan - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Roof Plan - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Roof Plan - Proposed_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Section - Existing_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Section - Proposed_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
The location plan_included_in_Block plan of the site.pdf
Uncategorised
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.