← London Borough of Hackney

Status

Pending House extension
Received
Not recorded
New homes
0

Summary

Basement excavation, rear ground-floor extension and shared first-floor rear outrigger extension.

Full proposal

Basement excavation including formation of rear lightwells; erection of a ground floor rear extension to No.81; and construction of a joint first-floor rear outrigger extension shared with No.83.

Documents

ApplicationFormRedacted.pdf
Application Form
Not yet archived · Original link
Community Infrastructure Levy
Other
Not yet archived · Original link
Design and access statement
Design and Access Statement
Not yet archived · Original link
DN-Full Planning Granted Final
Document
Not yet archived · Original link
EXISTING ROOF PLAN
Drawing
Not yet archived · Original link
Officer Report
Officer Report
Not yet archived · Original link
Proposed Layout Plan
Drawing
Not yet archived · Original link
Site Location Plans
Site Location Plan
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment