← London Borough of Hackney

Status

Pending House extension
Received
Not recorded
New homes
0

Full proposal

Installation of protective front balustrade and handrail; installation of gas boiler beneath front steps; replacement of existing rear single-storey flat roof extension with pitched roof extension, timber sash window, and rooflight; internal...

Documents

8257-BPR-PAP07-joinery-glazing-details
Drawing
Not yet archived · Original link
ApplicationFormRedacted.pdf
Application Form
Not yet archived · Original link
Community Infrastructure Levy - Completed form
Other
Not yet archived · Original link
Design and access statement
Design and Access Statement
Not yet archived · Original link
DN-Householder Granted Final
Document
Not yet archived · Original link
Existing plans and elevations.pdf
Drawing
Not yet archived · Original link
Final Plans
Document
Not yet archived · Original link
HERITAGE STATEMENT.pdf
Other
Not yet archived · Original link
LocationPlan.pdf
Site Location Plan
Not yet archived · Original link
Officer Report
Officer Report
Not yet archived · Original link
Revised Drawings
Document
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment