2025/2752
London Borough of Hackney
Status
Pending
Renewable energy
Received
Not recorded
New homes
0
Full proposal
Installation of an air source heat pump at the rear garden (retrospective) and proposed replacement of a section of flat roof and roof light at the rear
Documents
01-Existing-basement-and-part-ground-floor-plans-and-Location-plan
Drawing
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.