← Back to Hammersmith & Fulham
Status
Pending Decision
Received
n/a
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Demolition of existing car repair workshop (Class B2); erection of part one, part two and part three storey building comprising of ground, first and second floor levels in connection with the creation of 3no single family dwellinghouses (Class C3) to northern elevation of the site and erection of a single storey detached building to southern elevation of the site to use as a single family dwellinghouse (Class C3); reinstatement of public pavement by removal of vehicular crossover; removal of 1no substandard on street parking bay and formation of 4no replacement on street parking bays; associated landscaping.
Documents
630 - 402 REV D 1ST FLOOR PLAN AS PROPOSED
Revised Drawing
630 - 403 REV E 2ND FLOOR PLAN AS PROPOSED
Revised Drawing
630 - 404 REV E ROOF PLAN AS PROPOSED
Revised Drawing
630 - 405 REV C NORTH ELEVATION AS PROPOSED, APPEAL,EXISTING
Revised Drawing
630 - 406 REV B EAST ELEVSTION AS PROPOSED, APPEAL, EXISTING
Revised Drawing
630 - 408 REV B SOUTH-EAST ELEVATION AS PROPOSED.APPEAL,EXISTING
Revised Drawing
630 - 416 REV B SECTION H1, H2 & H3 AS PROPOSED
Revised Drawing
630 - 420 REV B PROPOSED ELEVATIONS SHEET - 1
Revised Drawing
630 - 421 REV B PROPOSED ELEVATION SHEET - 2
Revised Drawing
630 - 422 REV B PROPOSED ELEVATION SHEET - 3
Revised Drawing
630 DRAWING ISSUE SHEET
Revised Drawing
630-420 REV A - PROPOSED ELEVATION SHEET - 1
Drawing
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
APPLICATIONFORMREDACTED
Application Form
ARBORICULTURAL IMPACT ASSESSMENT
Report
CIL FORM
BackGround Papers
CONSTRUCTION LOGISTICS PLAN
Report
CONTRACTORS METHOD STATEMENT - DEMOLITION
Report
DAYLIGHT AND SUNLIGHT IMPACT ASSESSMENT
Report
DESIGN AND ACCESS STATEMENT
Report
DRAINAGE STRATEGY REPORT
Report
EAST ELEVATION AS PROPOSED - APPEAL - EXISTING
Drawing
EXISTING ROOF PLAN
Drawing
FIRST FLOOR AS PROPOSED
Drawing
FLOOD RISK ASSESSMENT
Report
GROUND FLOOR AS PROPOSED
Drawing
INTERIOR DAYLIGHT ANALYSIS
Report
NORTH ELEVATION AS PROPOSED
Drawing
OFFICER'S FILE NOTE
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 01
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 02
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 03
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 04
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 05
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 06
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 07
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 08
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 09
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 10
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 11
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 12
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 13
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 14
Report
PHASE 1 ENVIRONMENTAL DESK STUDY ASSESSMENT_PART 15
Report
PLANNING AND HERITAGE STATEMENT
Report
PRELIMINARY INVESTIGATION REPORT_PART 1
Report
PRELIMINARY INVESTIGATION REPORT_PART 2
Report
PRELIMINARY INVESTIGATION REPORT_PART 3
Report
PRELIMINARY INVESTIGATION REPORT_PART 4
Report
PROPOSED ELEVATIONS SHEET 2
Drawing
PROPOSED ELEVATIONS SHEET 3
Drawing
PUBLIC NOTICES
BackGround Papers
ROOF PLAN AS PROPOSED
Drawing
SECOND FLOOR PLAN AS PROPOSED
Drawing
SECTION A-A PROPOSED - APPEAL - EXISTING
Drawing
SECTION B-B PROPOSED - APPEAL - EXISTING
Drawing
SECTION C-C PROPOSED - APPEAL - EXISTING
Drawing
SECTION E-E PROPOSED - APPEAL - EXISTING
Drawing
SECTION F-F PROPOSED - APPEAL - EXISTING
Drawing
SECTION H1 H2 H3 AND H4 AS PROPOSED
Drawing
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
SOUTH EAST ELEVATION PROPOSED - APPEAL - EXISTING
Drawing
SUSTAINABILITY STATEMENT
Report
TRANSPORT STATEMENT
Report
WEST ELEVATIO PROPOSED - APPEAL - EXISTING
Drawing
WHOLE LIFE CARBON COMPARISON STUDY
Report