Summary

Listed building consent for repair and restoration works to three listed structures (roof, gutters, stonework, drainage, monuments).

Full Proposal

Works to 3no listed structures comprising of The Frederic Young Mausoleum: Replacement of corroded iron beams supporting the internal ledger stone; repair of damaged internal mosaic flooring, repair and restoration of roof and rainwater goods- replacement of lead flashing, replacement of gutters, re-fixing of fish scale slate tiles following repairs to roof timbers where required, install new ground drainage system (French drain), repair and restoration of both internal and internal stonework, clean and reinstate all internal monuments, repair stained glass to the north elevation and within the entrance door. Protect from future damage, removal of biological growth from the building, remove black carbon deposits on the sandstone and Portland mouldings with ammonium carbonate poultices and lime mortar surface repairs; The Reception House: Remove and replace existing rainwater gutters and drainage, slipped and damaged roof tiles to be replaced, repair and replace all lead flashing to both roof and dormer windows, roof dormers and their timber louvres to be repaired and painted, reset upper courses of brickwork below roof, repair all external brickwork using lime mortars, replace bathstone cornice and plinths where extensive damage has occurred, remove layers of paint to the internal walls retaining layers of original distemper where possible, rebuild brick plinths supporting internal stone slabs where required, repair and repainting of original entrance door, cleaning and minor repair to internal roof structure and ironwork; The Abraham Smith Monument: disassemble, clean and repair each element of the monument, strengthen or replace existing foundations as required, address existing ground levels to ensure shallow incline surrounding monument, reinstate all existing stonework above new or repaired foundations and new concrete slab and apply new green quartz gravel above slab to match original within the Hammersmith Cemetery.

Detail pages

Documents

ACKNOWLEDGEMENT LBC
Correspondence
Not downloaded · Council link
ACKNOWLEDGEMENT LBC
Correspondence
Not downloaded · Council link
ALYNE ECOLOGY_CLAXTON GROVE HAMMERSMITH_DUSK EMERGENCE SURVEY_001_2024
Drawing
Not downloaded · Council link
ALYNE ECOLOGY_CLAXTON GROVE HAMMERSMITH_PRA REPORT_001_MB_2024
Drawing
Not downloaded · Council link
APPLICATIONFORMREDACTED
Application Form
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT ABRAHAM SMITH
Drawing
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT ABRAHAM SMITH MONUMENT
Drawing
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT FREDERIC YOUNG
Drawing
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT FREDERIC YOUNG MAUSOLEUM
Drawing
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT THE RECEPTION
Drawing
Not downloaded · Council link
CONDITION AND RECOMMENDATION REPORT THE RECEPTION HOUSE
Drawing
Not downloaded · Council link
DESIGN AND ACCESS STATEMENT_MARGRAVINE CEMETERY
Drawing
Not downloaded · Council link
EXISTING - BOUNDARY PLAN
Drawing
Not downloaded · Council link
EXISTING - MAUSOLEUM ELEV NORTH AND WEST
Drawing
Not downloaded · Council link
EXISTING - MAUSOLEUM ELEV SOUTH AND EAST
Drawing
Not downloaded · Council link
EXISTING - MAUSOLEUM GF AND ROOF PLAN
Drawing
Not downloaded · Council link
EXISTING - MAUSOLEUM SECTION
Drawing
Not downloaded · Council link
EXISTING - MAUSOLEUM SITE PLAN
Drawing
Archived copy · Council link
EXISTING - MONUMENT DRAWINGS
Drawing
Not downloaded · Council link
EXISTING - RECEPTION HOUSE ELEV 1
Drawing
Not downloaded · Council link
EXISTING - RECEPTION HOUSE ELEV 2
Drawing
Not downloaded · Council link
EXISTING - RECEPTION HOUSE GF PLAN
Drawing
Not downloaded · Council link
EXISTING - RECEPTION HOUSE ROOF PLAN
Drawing
Not downloaded · Council link
EXISTING - RECEPTION HOUSE SECTION
Drawing
Not downloaded · Council link
FORM_1_CIL_ADDITIONAL_INFORMATION_FILLED
Drawing
Not downloaded · Council link
FREDERIC YOUNG MAUSOLEUM ARK METHOD STATEMENT FOR STAINED GLASS
Drawing
Not downloaded · Council link
OFFICER'S FILE NOTE
Report
Not downloaded · Council link
PRESS NOTICE
BackGround Papers
Not downloaded · Council link
PRESS NOTICE
BackGround Papers
Not downloaded · Council link
PROPOSED - MAUSOLEUM DRAINAGE DIAGRAM
Drawing
Not downloaded · Council link
PROPOSED - MAUSOLEUM ELEV NORTH AND WEST
Drawing
Not downloaded · Council link
PROPOSED - MAUSOLEUM ELEV SOUTH AND EAST
Drawing
Not downloaded · Council link
PROPOSED - MAUSOLEUM GF AND ROOF PLAN
Drawing
Not downloaded · Council link
PROPOSED - MAUSOLEUM SECTION
Drawing
Not downloaded · Council link
PROPOSED - MAUSOLEUM STAINED GLASS
Drawing
Not downloaded · Council link
PROPOSED - MONUMENT DRAWINGS
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE DRAINAGE DIAGRAM
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE ELEV 1
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE ELEV 2
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE GF PLAN
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE ROOF PLAN
Drawing
Not downloaded · Council link
PROPOSED - RECEPTION HOUSE SECTION
Drawing
Not downloaded · Council link
SITE NOTICE (LISTED BUILDING CONSENT)
Correspondence
Not downloaded · Council link
STRUCTURAL REPORT_MARGRAVINE CEMETERY_240611
Drawing
Not downloaded · Council link