← Back to Hammersmith & Fulham
Status
Pending Consideration
Received
n/a
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Change of use of upper floors and part basement from offices to 29 residential dwellings.
Full Proposal
Change of use of first, second, third floor levels from offices (Use Class E) and part basement from ancillary space (Use Class E) to provide 29no. residential dwellings (Use Class C3) on the upper floors with associated shared amenity space at basement level; reconfiguration and change of use of the office entrance cores (Use Class E) at ground level to facilitate communal entrances for the residential dwellings; external alterations to provide associated rear access doors; installation of canopies to the rear; removal of existing rooflight and installation of new stairs to basement level; along with associated cycle parking / refuse storage, plant equipment and landscaping; associated internal and external alterations.
Documents
250523_585_02_EXISTING DRAWINGS
Drawing
250523_585_03_DEMOLITION DRAWINGS
Drawing
ACCOMMODATION SCHEDULE
Report
ACKNOWLEDGEMENT LBC
Correspondence
ACKNOWLEDGEMENT LBC
Correspondence
AIR QUALITY ASSESSMENT
Report
APPLICATIONFORMREDACTED
Application Form
ARBORICULTURAL METHOD STATEMENT
Report
BUILT HERITAGE STATEMENT
Report
COVER LETTER 21.10.2025
Correspondence
COVER LETTER 27.05.25
Correspondence
DESIGN & ACCESS STATEMENT REV B
Report
DETAILED DRAWINGS
Drawing
ECOLOGICAL APPRAISAL
Report
ENERGY AND SUSTAINABILITY STATEMENT.
Report
FINANCIAL VIABILITY ASSESSMENT
Report
FIRE STATEMENT REV 2
Report
FRA SURFACE WATER DRAINAGE STRATEGY
Report
INTERNAL DAYLIGHT SUNLIGHT REPORT
Report
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
INVALID LETTER PLANNING APPLICATIONS
Correspondence
NOISE IMPACT ASSESSMENT
Report
OFFICER'S FILE NOTE
Report
OUTLINE CONSTRUCTION LOGISTICS PLAN
Report
P25-0378 _EN_0001_S1_REV C UGF
Drawing
P25-0378 _EN_0002_S1_REV C ILLUSTRATIVE LANDSCAPE MASTERPLAN
Drawing
PHASE 1 SITE INVESTIGATION - PART 1
Report
PHASE 1 SITE INVESTIGATION - PART 2
Report
PHASE 1 SITE INVESTIGATION - PART 3
Report
PHASE 1 SITE INVESTIGATION - PART 4
Report
PHASE 1 SITE INVESTIGATION - PART 5
Report
PLANNING STATEMENT (JULY 2025) (INCL. STATEMENT OF COMMUNITY INVOLVEMENT)
Report
PRESS NOTICE
BackGround Papers
PROPOSED DRAWINGS
Drawing
SITE NOTICE (LISTED BUILDING CONSENT)
Correspondence
TRANSPORT STATEMENT
Report
VEHICLE SWEPT PATH ANALYSIS
Drawing
VENTILATION STRATEGY
Report