2025/03014/FUL
Hammersmith & Fulham
Status
Pending Consideration
House extension
Received
Not recorded
New homes
0
Full proposal
Erection of a rear roof extension, involving an increase in the ridge height by 400mm; installation of 2no. rooflights in the front roofslope; removal of the pitched roof to form a new flat roof enclosed in 1.7m high obscured glazed screening, in connection with its use as a roof terrace to the rear elevation at second floor level; and erection of a dormer French door to the rear elevation of rear mansard roof, including formation of steps leading onto the proposed flat roof terrace at second floor level.
Documents
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.