← Hammersmith & Fulham

Status

Pending Consideration House extension
Received
Not recorded
New homes
0

Full proposal

Erection of a rear roof extension; erection of a rear extension at second floor level, over part of the existing back addition; reinstatement of upper portion to existing chimney stack at main roof level; replacement of concrete roof tiles to the front roof slope with eternit roof tiles; installation of a rooflight to the flat roof of the proposed rear roof extension; and replacement of existing uPVC sash windows to the front elevation with double-glazed timber framed sash windows.

Documents

18STATEMENT
Drawing
Not yet archived · Original link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not yet archived · Original link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form
Not yet archived · Original link
FORM_1_CIL_2025
Drawing
Not yet archived · Original link
JH001
Drawing
Not yet archived · Original link
JH002
Drawing
Not yet archived · Original link
JH002 COPY
Drawing
Not yet archived · Original link
JH003
Drawing
Not yet archived · Original link
JH004
Drawing
Not yet archived · Original link
JH005
Drawing
Not yet archived · Original link
JH006
Drawing
Not yet archived · Original link
JH007
Drawing
Not yet archived · Original link
JH008
Drawing
Not yet archived · Original link
JH500
Drawing
Not yet archived · Original link
JH500 COPY
Drawing
Not yet archived · Original link
LOCATION
Drawing
Not yet archived · Original link
LOCATIONPLAN
Drawing
Not yet archived · Original link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not yet archived · Original link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment