2026/00193/FUL
Hammersmith & Fulham
Status
Pending Consideration
Other
Received
Not recorded
New homes
0
Full proposal
Retrospective application for the retention of gas pipework along the passageway from front (eastern elevation) of the property through to the northern elevation and up the side elevation of the property (accessing each of the 5no flats).
Documents
ELEVATION (FRONT) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - EXISTING
Drawing
Not yet archived
· Original link
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (SIDE) - EXISTING
Drawing
Not yet archived
· Original link
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (SIDE) - EXISTING_31769485
Drawing
Not yet archived
· Original link
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (SIDE) - EXISTING_31769513
Drawing
Not yet archived
· Original link
SITEBLOCK PLAN - EXISTING_INCLUDED_IN_LAYOUT PLAN - EXISTING
Drawing
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.