← London Borough of Haringey

Status

Pending Renewable energy
Received
Not recorded
New homes
0

Full proposal

Application Reference HGY/2024/2593 Proposal Installation of 8 solar PV panels in addition to 5 existing solar PV panels, reinstatement of 65% of green roof that was removed on main flat roof area. Reduction in height of mounting system for PV panels to bring PV panels lower than parapet of the roof (retrospective). (AMENDED DESCRIPTION) Application Status Decision Made Site Address 3 Darcies Mews Cecile Park Hornsey London N8 9BW Date Valid 20/9/2024 Decision Approve with Conditions Decision Notice Sent Date 18/3/2025

Documents

Download (PDF, 336.17KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 371.96KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 403.71KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 44.94KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 467.99KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 473.13KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 494.31KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 520.46KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 603.22KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 67.22KB)
Uncategorised
Not yet archived · Original link
Download (PDF, 99.02KB)
Uncategorised
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment