← Back to Hart District Council
Status
Registered
Received
23 Oct 2025
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Hybrid planning application for part full and part outline planning permission for the erection of two three-bedroom custom self-build dwellings: Full planning permission for the erection of one three-bedroom dwelling and a detached garage with store above following demolition of the three existing buildings with associated works to include hardstanding, cycle parking, fencing, ramp and new access Outline planning permission for the erection of one three-bedroom dwelling and infilling of the redundant sewage pumping station tanks using existing access with principle and scale to be considered
Documents
. HOOK PARISH COUNCIL
Consultee Comment
APPLICATIONFORMREDACTED
Application Form
BLOCKED DOORS 1 OF 2
Correspondence
BLOCKED DOORS 2 OF 2
Correspondence
BLOCKED DOORWAYS
Correspondence
ENVIRONMENT AGENCY
Consultee Comment
FALLBACK POSITION JUSTIFICATION
Report
FLOOD RISK ASSESSMENT - MARCH 2022
Flood Risk Assessment
FLOOD RISK ASSESSMENT REPORT 20 OCT 25
Report
HAMPSHIRE HIGHWAYS
Consultee Comment
HART DC BIODIVERSITY
Consultee Comment
INCLUDING CLIMATE MITIGATION AND ECONOMIC STATEMENT AND SANG MITIGATION
Report
LETTER TO LPA RE ZENAS FLOOD RISK 18 DEC 25 A
Correspondence
MR ANTON SCHEMBRI-SUPPORTS(FULL)
Support Comment
MR BARRY HOLTON-SUPPORTS(FULL)
Support Comment
MR JOHN CHAMPION-SUPPORTS(FULL)
Support Comment
MR SCOTT BLOFELD-SUPPORTS(FULL)
Support Comment
MR TIM SLATER-SUPPORTS(FULL)
Support Comment
NATURAL ENGLAND
Consultee Comment
NATURAL ENGLAND ANNEX A
Consultee Comment
NEIGHBOUR LETTER
Correspondence
PEA_ZENAS_2025-1903926
Report
SANG - APPLICATION FORM
Correspondence
SANG - CERTIFICATE 2025
Correspondence
THAMES WATER
Consultee Comment
VALIDATION EMAIL 1
Correspondence
VALIDATION EMAIL 2
Correspondence
VALIDATION EMAIL 3
Correspondence
VALIDATION EMAIL 4
Correspondence
ZJ 9QP EB1 EXISTING BUILDING
Plans
ZJ 9QP EB2 EXISTING BUILDING
Plans
ZJ 9QP EB3 EXISTING BUILDING
Plans
ZJ 9QP ELP LOCATION PLAN
Location Plan
ZJ 9QP ESL EXISTING SITE LEVELS
Plans
ZJ 9QP FV FLOOD VOID JUSTIFICATION
Plans
ZJ 9QP PE PROPOSED ELEVATION
Plans
ZJ 9QP PG -1 PROPOSED GARAGE
Plans
ZJ 9QP PP-1 PROPOSED PLAN
Plans
ZJ 9QP PRP-1 PROPOSED ROOF PLAN
Plans
ZJ 9QP PSL PROPOSED SITE LEVEL PLAN
Plans
ZJ 9QP PSL PZJ 9QP SEC SECTIONSROPOSED SITE LEVEL PLAN
Plans
ZJ 9QP SS PROPOSED STREET SCENE
Plans