← Back to Kingston upon Thames
Status
Pending Consideration
Received
02 Oct 2025
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Phased redevelopment replacing gasholders with five blocks providing 586 homes, public open space and landscaping.
Full Proposal
Demolition of existing gasholders and associated above ground structures and buildings. Phased redevelopment of site to provide 8 to 16 storey 5nos blocks with 586 residential units and ancillary residential facilities (C3 Use Class), together with associated works to the existing accesses and internal vehicular routes, new pedestrian and cycle routes, the provision of new publicly accessible open space, amenity space, hard and soft landscaping, cycle and car parking, works to the brook embankment, re-siting of some gas infrastructure, ground works and plant and associated works. Cross boundary application with LB Merton: Development within Merton comprises works to existing vehicle access onto West Barnes Lane, including hard and soft landscaping and new public realm and associated ground works, to provide pedestrian and cycle route with access for emergency vehicles only, new pedestrian/cycle access routes to Marina Avenue and Sir Joseph Hood Memorial grounds. Application accompanied by an Environmental Statement.
Documents
1 BED 1 PERSON TYPE 101
Drawing
1 BED 2 PERSON M4(3) TYPE 111
Drawing
1 BED 2 PERSON TYPE 011
Drawing
1 BED 2 PERSON TYPE 311
Drawing
2 BED 3 PERSON M4(3) TYPE 022
Drawing
2 BED 3 PERSON M4(3) TYPE 022A
Drawing
2 BED 3 PERSON M4(3) TYPE 322
Drawing
2 BED 3 PERSON TYPE 023
Drawing
2 BED 3 PERSON TYPE 023A
Drawing
2 BED 3 PERSON TYPE 221
Drawing
2 BED 3 PERSON TYPE 321
Drawing
2 BED 4 PERSON TYPE 021
Drawing
2 BED 4 PERSON TYPE 021A
Drawing
2 BED 4 PERSON TYPE 121
Drawing
2 BED 4 PERSON TYPE 222
Drawing
2 BED 4 PERSON TYPE 223
Drawing
2. Motspur Park Gasholder Site_GLA CE Memo_Stage 1_10.11.25
Supporting Documents
2. Motspur Park_GLA WLC Memo_12.11.25
Supporting Documents
20250919 Motspur Park Gasholder Site - GLA Consultation (Stage 1) - Energy Memo
Supporting Documents
3 BED 5 PERSON TYPE 131
Drawing
3 BED 5 PERSON TYPE 331
Drawing
3 BED 5 PERSON TYPE 332
Drawing
3 BED 6 PERSON TYPE 132
Drawing
3 BED 6 PERSON TYPE 133
Drawing
Access and Safer Routes P01
Supporting Documents
ACCOMMODATION SCHEDULE
Supporting Documents
Appendix 11.1 - Ecological Impact Assessment
Supporting Documents
Appendix 11.2 - Biodiversity Net Gain Assessment
Supporting Documents
Appendix 11.2a - Motspur Park - BNG Metric
Supporting Documents
Application Form (No personal data)
Application Form
Arboricultural Impact Assessment with Tree Survey Part- 1
Supporting Documents
Arboricultural Impact Assessment with Tree Survey Part- 2
Supporting Documents
Biodiversity Checklist
Supporting Documents
Car Park Management Plan
Supporting Documents
Circular Economy Statement
Supporting Documents
Combined Hard and Soft Landscape GA Legend
Drawing
Cost Plan
Supporting Documents
Cover Letter
Supporting Documents
Delivery and Servicing Management Plan
Supporting Documents
DERTER_A - L00 - 50m¦_A - L00 - 50m¦_2025-09-29_17-10-43
Supporting Documents
DERTER_A - L00 - 50m¦_A - L00 - 50m¦_2025-09-29_17-11-21
Supporting Documents
DERTER_A - L00 - 74m¦_A - L00 - 74m¦_2025-09-29_17-10-43
Supporting Documents
DERTER_A - L00 - 74m¦_A - L00 - 74m¦_2025-09-29_17-11-21
Supporting Documents
DERTER_A - L01 - 76m¦_A - L01 - 76m¦_2025-09-29_17-10-43
Supporting Documents
DERTER_A - L01 - 76m¦_A - L01 - 76m¦_2025-09-29_17-11-21
Supporting Documents
DERTER_A - L01 - 89m¦_A - L01 - 89m¦_2025-09-29_17-10-43
Supporting Documents
DERTER_A - L01 - 89m¦_A - L01 - 89m¦_2025-09-29_17-11-21
Supporting Documents
DERTER_A - L02 - 74m¦_A - L02 - 74m¦_2025-09-29_17-10-43
Supporting Documents
DERTER_A - L02 - 74m¦_A - L02 - 74m¦_2025-09-29_17-11-21
Supporting Documents
DERTER_A - L02 - 89m¦_A - L02 - 89m¦_2025-09-29_17-10-44
Supporting Documents
DERTER_A - L02 - 89m¦_A - L02 - 89m¦_2025-09-29_17-11-22
Supporting Documents
DERTER_A - L04 - 59m¦_A - L04 - 59m¦_2025-09-29_17-10-44
Supporting Documents
DERTER_A - L04 - 59m¦_A - L04 - 59m¦_2025-09-29_17-11-22
Supporting Documents
DERTER_A - L04 - 74m¦_A - L04 - 74m¦_2025-09-29_17-10-44
Supporting Documents
DERTER_A - L04 - 74m¦_A - L04 - 74m¦_2025-09-29_17-11-23
Supporting Documents
DERTER_A - L04 - 76m¦_A - L04 - 76m¦_2025-09-29_17-10-44
Supporting Documents
DERTER_A - L04 - 76m¦_A - L04 - 76m¦_2025-09-29_17-11-23
Supporting Documents
DERTER_A - L14 - 74m¦_A - L14 - 74m¦_2025-09-29_17-10-45
Supporting Documents
DERTER_A - L14 - 74m¦_A - L14 - 74m¦_2025-09-29_17-11-23
Supporting Documents
DERTER_A - L15 - 96m¦_A - L15 - 96m¦_2025-09-29_17-10-46
Supporting Documents
DERTER_A - L15 - 96m¦_A - L15 - 96m¦_2025-09-29_17-11-24
Supporting Documents
DERTER_A - L15 - 97m¦_A - L15 - 97m¦_2025-09-29_17-10-46
Supporting Documents
DERTER_A - L15 - 97m¦_A - L15 - 97m¦_2025-09-29_17-11-25
Supporting Documents
DERTER_D - L01 - 51m¦_D - L01 - 51m¦_2025-09-29_17-10-46
Supporting Documents
DERTER_D - L01 - 51m¦_D - L01 - 51m¦_2025-09-29_17-11-25
Supporting Documents
DERTER_D - L01 - 62m¦_D - L01 - 62m¦_2025-09-29_17-10-46
Supporting Documents
DERTER_D - L01 - 62m¦_D - L01 - 62m¦_2025-09-29_17-11-25
Supporting Documents
DERTER_D - L01 - 73m¦_D - L01 - 73m¦_2025-09-29_17-10-47
Supporting Documents
DERTER_D - L01 - 73m¦_D - L01 - 73m¦_2025-09-29_17-11-25
Supporting Documents
DERTER_D - L01 - 86m¦_D - L01 - 86m¦_2025-09-29_17-10-48
Supporting Documents
DERTER_D - L01 - 86m¦_D - L01 - 86m¦_2025-09-29_17-11-26
Supporting Documents
DERTER_D - L02 - 51m¦_D - L02 - 51m¦_2025-09-29_17-10-48
Supporting Documents
DERTER_D - L02 - 51m¦_D - L02 - 51m¦_2025-09-29_17-11-26
Supporting Documents
DERTER_D - L02 - 62m¦_D - L02 - 62m¦_2025-09-29_17-10-48
Supporting Documents
DERTER_D - L02 - 62m¦_D - L02 - 62m¦_2025-09-29_17-11-27
Supporting Documents
DERTER_D - L02 - 62m¦_D - L02 - 62m¦_2025-09-29_17-11-27
Supporting Documents
DERTER_D - L02 - 86m¦_D - L02 - 86m¦_2025-09-29_17-10-49
Supporting Documents
DERTER_D - L02 - 86m¦_D - L02 - 86m¦_2025-09-29_17-11-27
Supporting Documents
DERTER_D - L06 - 73m¦_D - L06 - 73m¦_2025-09-29_17-10-49
Supporting Documents
DERTER_D - L06 - 73m¦_D - L06 - 73m¦_2025-09-29_17-11-27
Supporting Documents
DERTER_D - L11 - 75m¦_D - L11 - 75m¦_2025-09-29_17-10-50
Supporting Documents
DERTER_D - L11 - 75m¦_D - L11 - 75m¦_2025-09-29_17-11-28
Supporting Documents
DERTER_D - L11 - 85m¦_D - L11 - 85m¦_2025-09-29_17-10-50
Supporting Documents
DERTER_D - L11 - 85m¦_D - L11 - 85m¦_2025-09-29_17-11-29
Supporting Documents
DERTER_E - L01 - 50m¦_E - L01 - 50m¦_2025-09-29_17-10-50
Supporting Documents
DERTER_E - L01 - 50m¦_E - L01 - 50m¦_2025-09-29_17-11-29
Supporting Documents
DERTER_E - L01 - 64m¦_E - L01 - 64m¦_2025-09-29_17-10-51
Supporting Documents
DERTER_E - L01 - 64m¦_E - L01 - 64m¦_2025-09-29_17-11-29
Supporting Documents
DERTER_E - L01 - 75m¦_E - L01 - 75m¦_2025-09-29_17-10-51
Supporting Documents
DERTER_E - L02 - 64m¦_E - L02 - 64m¦_2025-09-29_17-10-52
Supporting Documents
DERTER_E - L02 - 64m¦_E - L02 - 64m¦_2025-09-29_17-11-30
Supporting Documents
DERTER_E - L02 - 72m¦_E - L02 - 72m¦_2025-09-29_17-10-52
Supporting Documents
DERTER_E - L02 - 72m¦_E - L02 - 72m¦_2025-09-29_17-11-31
Supporting Documents
DERTER_E - L02 - 74m¦_E - L02 - 74m¦_2025-09-29_17-10-52
Supporting Documents
DERTER_E - L02 - 74m¦_E - L02 - 74m¦_2025-09-29_17-11-31
Supporting Documents
DERTER_E - L06 - 50m¦_E - L06 - 50m¦_2025-09-29_17-10-53
Supporting Documents
DERTER_E - L06 - 50m¦_E - L06 - 50m¦_2025-09-29_17-11-31
Supporting Documents
DERTER_E - L06 - 64m¦_E - L06 - 64m¦_2025-09-29_17-10-53
Supporting Documents
DERTER_E - L06 - 64m¦_E - L06 - 64m¦_2025-09-29_17-11-31
Supporting Documents
DERTER_E - L06 - 72m¦_E - L06 - 72m¦_2025-09-29_17-10-54
Supporting Documents
DERTER_E - L06 - 72m¦_E - L06 - 72m¦_2025-09-29_17-11-32
Supporting Documents
DESIGN AND ACCESS STATEMENT PART1
Supporting Documents
DESIGN AND ACCESS STATEMENT PART10
Supporting Documents
DESIGN AND ACCESS STATEMENT PART11
Supporting Documents
DESIGN AND ACCESS STATEMENT PART12
Supporting Documents
DESIGN AND ACCESS STATEMENT PART13
Supporting Documents
DESIGN AND ACCESS STATEMENT PART14
Supporting Documents
DESIGN AND ACCESS STATEMENT PART2
Supporting Documents
DESIGN AND ACCESS STATEMENT PART3
Supporting Documents
DESIGN AND ACCESS STATEMENT PART5
Supporting Documents
DESIGN AND ACCESS STATEMENT PART6
Supporting Documents
DESIGN AND ACCESS STATEMENT PART7
Supporting Documents
DESIGN AND ACCESS STATEMENT PART8
Supporting Documents
DESIGN AND ACCESS STATEMENT_PART4
Supporting Documents
DESIGN AND ACCESS STATEMENT_PART9
Supporting Documents
Drainage Strategy Part-1
Supporting Documents
Drainage Strategy Part-2
Supporting Documents
Drainage Strategy Part-3
Supporting Documents
Drainage Strategy Part-4
Supporting Documents
Drainage Strategy Part-5
Supporting Documents
Drainage Strategy Part-6
Supporting Documents
Drainage Strategy Part-7
Supporting Documents
DRP Report
Supporting Documents
DRP Report V2
Supporting Documents
EIA and Biodiversity Checklist
Supporting Documents
Energy Statement
Supporting Documents
Energy Statement
Supporting Documents
Energy Strategy - GLA Review
Supporting Documents
Environmental Statemen Volume 1 Chapter 10 Noise and Vibration
Supporting Documents
Environmental Statemen Volume 1 Chapter 14 Solar Glare
Supporting Documents
Environmental Statemen Volume 1 Chapter 2 EIA Process and Methodology
Supporting Documents
Environmental Statemen Volume 1 Chapter 3 Alternatives and Design Evolution
Supporting Documents
Environmental Statemen Volume 1 Chapter 5 Demo and Con
Supporting Documents
Environmental Statemen Volume 1 Chapter 6 Archaeology
Supporting Documents
Environmental Statemen Volume 1 Chapter 7 Socio-Economics
Supporting Documents
Environmental Statemen Volume 1 ES Chapter 13 Water Resources and Flood Risk
Supporting Documents
Environmental Statemen Volume 3 Technical Appendix 1.1 IEMA Quality Mark Checklist
Supporting Documents
Environmental Statemen Volume 3 Technical Appendix 1.2 EIA Regulation 18(5)(b) Statement
Supporting Documents
Environmental Statemen Volume 3 Technical Appendix 10.1 to 10.6 Noise and Vibration
Supporting Documents
Environmental Statement Volume 1 Chapter 1 Introduction
Supporting Documents
Environmental Statement Volume 1 Chapter 11 Ecology SUBS v2
Supporting Documents
Environmental Statement Volume 1 Chapter 12 Ground Conditions _SUBS
Supporting Documents
Environmental Statement Volume 1 Chapter 15 Wind Microclimate_SUBS
Supporting Documents
Environmental Statement Volume 1 Chapter 16 Climate Chapter_SUBS
Supporting Documents
Environmental Statement Volume 1 Chapter 17 Intra-Cumulatives SUBS
Supporting Documents
Environmental Statement Volume 1 Chapter 18 Summary of Mitigation and Residual E
Supporting Documents
Environmental Statement Volume 1 Chapter 4 Proposed Development Description V2
Supporting Documents
Environmental Statement Volume 1 Chapter 8 Transport_SUBS
Supporting Documents
ES Volume 1 Chapter 9 Air Quality
Supporting Documents
ES Volume 2 : Townscape and Visual Impact Assessment Part1
Supporting Documents
ES Volume 3 Technical Appendix 12.1 Preliminary Risk Assessment_Part1
Supporting Documents
ES Volume 3 Technical Appendix 12.1 Preliminary Risk Assessment_Part2
Supporting Documents
ES Volume 3 Technical Appendix 12.1 Preliminary Risk Assessment_Part3
Supporting Documents
ES Volume 3 Technical Appendix 12.1 Preliminary Risk Assessment_Part4
Supporting Documents
ES Volume 3 Technical Appendix 13.1 Flood Risk Assessment
Supporting Documents
ES Volume 3 Technical Appendix 14.1 Selection of Annual Sequence Images
Supporting Documents
ES Volume 3 Technical Appendix 14.2 Calendar Graphs
Supporting Documents
ES Volume 3 Technical Appendix 15.1 Wind Microclimate Report
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part1
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part10
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part2
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part3
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part4
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part5
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part6
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part7
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part8
Supporting Documents
ES Volume 3 Technical Appendix 2.1 EIA Scoping Opinion Request Report_Part9
Supporting Documents
ES Volume 3 Technical Appendix 2.2 London Borough of Merton EIA Scoping Opinion
Supporting Documents
ES Volume 3 Technical Appendix 2.4 London Borough of Sutton Scoping Opinion Comments
Supporting Documents
ES Volume 3 Technical Appendix 2.5 Site Waste Management Plan_Part1
Supporting Documents
ES Volume 3 Technical Appendix 2.5 Site Waste Management Plan_Part2
Supporting Documents
ES Volume 3 Technical Appendix 2.5 Site Waste Management Plan_Part3
Supporting Documents
ES Volume 3 Technical Appendix 2.6 Operational Waste Management Plan_Part1
Supporting Documents
ES Volume 3 Technical Appendix 2.6 Operational Waste Management Plan_Part2
Supporting Documents
ES Volume 3 Technical Appendix 2.7 Health Impact Assessment
Supporting Documents
ES Volume 3 Technical Appendix 2.8 Heritage Statement
Supporting Documents
ES Volume 3 Technical Appendix 2.8 Heritage Statement_Part1
Supporting Documents
ES Volume 3 Technical Appendix 2.8 Heritage Statement_Part2
Supporting Documents
ES Volume 3 Technical Appendix 2.9 Aviation Safeguarding Note
Supporting Documents
ES Volume 3 Technical Appendix 6.1 Archaeological Desk Based Assessment
Supporting Documents
ES Volume 3 Technical Appendix 9.1 - 9.4 Air Quality
Supporting Documents
EXISTING GA SECTION 1
Drawing
EXISTING NORTH AND SOUTH ELEVATION
Drawing
Existing Utilities Report
Supporting Documents
EXISTING WEST AND EAST ELEVATION
Drawing
Financial Viability Assessment
Supporting Documents
Financial Viability Assessment Appendices
Supporting Documents
Fire Statement
Supporting Documents
Flood Risk Assessment and Drainage Strategy Addendum 19.12.25
Supporting Documents
Flood Risk Sequential Test
Supporting Documents
GLA - Lichfields Response letter 22.12.25
Supporting Documents
GLA Stage 1-Applicant Air Quality Response 18.12.25
Supporting Documents
GLA WLC Reporting Template
Supporting Documents
gla_circular_economy_statements_template v1.1 Motspur
Supporting Documents
Greenside Summary 21 Units
Supporting Documents
Healthy StreetTransport Assessment Part 1
Supporting Documents
Iceni Transport response to TfL_Final_19.12.25
Supporting Documents
Illustrative Colour Masterplan
Drawing
Internal Daylight Sunlight Overshadowing Report Part-5
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part1
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part2
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part3
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part4
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part6
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part7
Supporting Documents
Internal Daylight Sunlight Overshadowing Report Part8
Supporting Documents
Landscape Statement Part 1
Supporting Documents
Landscape Strategies Part 2
Supporting Documents
Metropolitan Open Land Assessment
Supporting Documents
Motspur Clubhouse - Be Green_brukl
Supporting Documents
Motspur Clubhouse - Be Lean_brukl
Supporting Documents
Motspur Park Appendices 1-6
Supporting Documents
Motspur Park Gas Holders GLA WLC Reporting Template
Supporting Documents
Motspur SWMP
Supporting Documents
Outline Demolition and Construction Environmental Management Plan
Supporting Documents
Overheating Assessment
Supporting Documents
Par L GLA Carbon Emission ReportingSpreadsheet
Supporting Documents
Parking Survey Analysis Technical Note - Rev A
Supporting Documents
Part_l_2021_gla_carbon_emission_reporting_spreadsheet_v2.0_0 Motspur
Supporting Documents
Planning Policy and D12 Fire Statement
Supporting Documents
Planning Statement 20.10.25
Supporting Documents
Preliminary Risk Assessment Part 1
Supporting Documents
Preliminary Risk Assessment Part 10
Supporting Documents
Preliminary Risk Assessment Part 11
Supporting Documents
Preliminary Risk Assessment Part 12
Supporting Documents
Preliminary Risk Assessment Part 2
Supporting Documents
Preliminary Risk Assessment Part 3
Supporting Documents
Preliminary Risk Assessment Part 4
Supporting Documents
Preliminary Risk Assessment Part 5
Supporting Documents
Preliminary Risk Assessment Part 6
Supporting Documents
Preliminary Risk Assessment Part 7
Supporting Documents
Preliminary Risk Assessment Part 8
Supporting Documents
Preliminary Risk Assessment Part 9
Supporting Documents
PROPOSED BAY STUDY - BUILDING A - BASE
Drawing
PROPOSED BAY STUDY - BUILDING A - TOP
Drawing
PROPOSED BAY STUDY - BUILDING B - BASE
Drawing
PROPOSED BAY STUDY - BUILDING B - TOP
Drawing
PROPOSED BAY STUDY - BUILDING C - BASE
Drawing
PROPOSED BAY STUDY - BUILDING C - TOP
Drawing
PROPOSED BAY STUDY - BUILDING D - BASE
Drawing
PROPOSED BAY STUDY - BUILDING D - TOP
Drawing
PROPOSED BAY STUDY - BUILDING E - BASE
Drawing
PROPOSED BAY STUDY - BUILDING E - TOP
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 2
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 3
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 4
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 5
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 6
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet 7
Drawing
Proposed Combined Hard and Soft Landscape GA Sheet1
Drawing
PROPOSED ELEVATIONS - BUILDING A
Drawing
PROPOSED ELEVATIONS - BUILDING B
Drawing
PROPOSED ELEVATIONS - BUILDING C
Drawing
PROPOSED ELEVATIONS - BUILDING D
Drawing
PROPOSED ELEVATIONS - BUILDING E
Drawing
PROPOSED GA PLAN - LEVEL 00
Drawing
PROPOSED GA PLAN - LEVEL 01
Drawing
PROPOSED GA PLAN - LEVEL 06
Drawing
PROPOSED GA PLAN - LEVEL 07
Drawing
PROPOSED GA PLAN - LEVEL 08
Drawing
PROPOSED GA PLAN - LEVEL 09-11
Drawing
PROPOSED GA PLAN - LEVEL 12
Drawing
PROPOSED GA PLAN - LEVEL 13
Drawing
PROPOSED GA PLAN - LEVEL 14
Drawing
PROPOSED GA PLAN - LEVEL 15
Drawing
PROPOSED GA PLAN - LEVEL 16
Drawing
PROPOSED GA PLAN - LEVELS 02-03
Drawing
PROPOSED GA PLAN - LEVELS 04-05
Drawing
PROPOSED GA PLAN - ROOF PLAN
Drawing
PROPOSED GA SECTION 1
Drawing
PROPOSED GA SECTION 2
Drawing
PROPOSED NORTH AND SOUTH ELEVATION
Drawing
PROPOSED PHASING PLAN
Drawing
PROPOSED SITE/ BLOCK PLAN
Drawing
PROPOSED SITEWIDE DEMOLITION PLAN
Drawing
PROPOSED WEST AND EAST ELEVATION
Drawing
RBK SuDs Proforma
Supporting Documents
Residential Travel Plan
Supporting Documents
Residential Travel Plan
Supporting Documents
Site Images Part 2
Supporting Documents
Site Images Part1
Supporting Documents
Site Images Part3
Supporting Documents
Site Images Part4
Supporting Documents
Site Images Part5
Supporting Documents
Statement of Community Involvement Part 1
Supporting Documents
Statement of Community Involvement Part 2
Supporting Documents
Statement of Community Involvement Part 3
Supporting Documents
Statement of Community Involvement Part 4
Supporting Documents
Statement of Community Involvement Part 5
Supporting Documents
Statement of Community Involvement Part 6
Supporting Documents
Statement of Community Involvement Part 7
Supporting Documents
Statement of Community Involvement Part 8
Supporting Documents
Sustainability Statement
Supporting Documents
Townscape and Visual Impact Assessment Part2
Supporting Documents
Transport Assessment Part 2
Supporting Documents
Transport Assessment Part 3
Supporting Documents
Validation Checklist
Supporting Documents
Westcote Summary 23 Units
Supporting Documents
Whole Lifecycle Carbon Assessment
Supporting Documents