Application
25/06926/COND
Leeds City Council · IDOX
Status
Current
New infrastructure
Received
n/a
New dwellings
0
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Discharge/approval of multiple planning conditions (construction, highways, contamination, substation, drainage, ecology, sustainability).
Full Proposal
Consent, agreement or approval required by conditions 11 (statement of construction practice), 13 (highways condition survey), 14 (phase II site investigation), 21 (substation details), 22 (boundary treatment details), 24 (temporary drainage measures), 25 (water mains diversion details), 26 (bat and bird boxes), 28 (sustainability statement) and 29 (training and employment plan) to planning application 24/02842/FU
Detail pages
- View live detail on council site
- No archived detail page available.
Documents
- CONTAMINATED LAND TEAM
Consultee
Not downloaded
· Council link
- FLOOD RISK MANAGEMENT
Consultee
Not downloaded
· Council link
- HIGHWAYS TEAM
Consultee
Not downloaded
· Council link
BOUNDARY TREATMENT DETAILS
Drawing
Not downloaded
· Council link
CONDITION 28 - SUSTAINABILITY STATEMENT
BackGround Papers
Not downloaded
· Council link
CONDITION DISCHARGE 26 - BAT AND BIRD BOX PROVISION ELEVATIONS (1 OF 2)
Drawing
Not downloaded
· Council link
CONDITION DISCHARGE 26 - BAT AND BIRD BOX PROVISION ELEVATIONS (2 OF 2)
Drawing
Not downloaded
· Council link
Archived copy
· Council link
CONSTRUCTION SURFACE WATER MANAGEMENT PLAN
BackGround Papers
Not downloaded
· Council link
COVERING LETTER
BackGround Papers
Not downloaded
· Council link
DISCONNECTION - OPTION C
Drawing
Not downloaded
· Council link
FINAL GAS RISK ASSESSMENT
BackGround Papers
Not downloaded
· Council link
PHASE 2 SITE APPRAISAL
BackGround Papers
Not downloaded
· Council link
PLANNING APPLICATION FORM
Application Form
Not downloaded
· Council link
PROPOSED SITE PLAN
Drawing
Archived copy
· Council link
RE. CONDITION 11, CONSTRUCTION PHASE HEALTH AND SAFETY PLAN
BackGround Papers
Not downloaded
· Council link
RE. CONDITION 13 PART A, PRE-CONSTRUCTION HIGHWAY CONDITION SURVEY
BackGround Papers
Not downloaded
· Council link
RE. CONDITION 29- PROPOSED OUTLINE STATEMENT
BackGround Papers
Not downloaded
· Council link
SUBSTATION DESIGN DETAIL
Drawing
Not downloaded
· Council link