← Back to Malvern Hills District Council

Status

Pending Decision Community facility
Received 23 Jul 2025
New dwellings 0

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Listed building works: replace terrace surface/railings, add condenser and canopy, internal staff room and toilet alterations.

Full Proposal

Replacement of existing external terrace surface / roof over basement level and erection of replacement balustrade railings to rear. Addition of condenser to external south facing wall. Replacement of canopy to front elevation. Internal alterations to create staff room and staff toilet. Infill internal window aperture to south facing wall.

Detail pages

Documents

-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
-
Document
Not downloaded · Council link
050 - A
Document
Not downloaded · Council link
100 - A
Document
Not downloaded · Council link
100 - B
Document
Not downloaded · Council link
200 - B
Document
Not downloaded · Council link
200 - E
Document
Not downloaded · Council link
201 - B
Document
Not downloaded · Council link
2804 500 / -
Document
Not downloaded · Council link
301 - D
Document
Not downloaded · Council link
3335-OSE-V1-01-DR-S-0001(C1) -
Document
Not downloaded · Council link
TP16343_24.01 - C
Document
Not downloaded · Council link