Summary
Retrospective installation of substation, nitrogen tank, cooling tower, silos, borehole enclosures and associated plant.
Full proposal
Retrospective application for the erection of a substation enclosure, nitrogen tank, cooling tower with pumps; 4 no. silos, 3 no. borehole enclosures and associated pipework; balancing tank; Process Water Pump House; removal and relocation of utility building, widened internal access road and other associated works. (Amended Description)
Documents
ACOUSTIC INFORMATION
Supporting Information
APPLICATIONFORMREDACTED
Application Form
ARBOR RESPONSE
Consultee Comment
AREAS OF NEW CONSTRUCTION
Plan
BIODIVERSITY PROFORMA
Supporting Information
BNG METRIC CALCULATION TOOL
Supporting Information
BNG PART 1 - BASELINE - STATUTORY METRIC
Supporting Information
BNG PART 1 BASELINE STATUTORY METRIC
Supporting Information
BNG PART 2 FIXED LAYOUT STATUTORY METRIC
Supporting Information
BOREHOLE ENCLOSURE 1
Plan
BOREHOLE ENCLOSURE 2
Plan
BOREHOLE ENCLOSURE 3
Plan
CASE OFFICER SITE VISIT NOTES
Case Notes
CIL FORM
Supporting Information
CONTAMINATED LAND
Consultee Comment
CONTAMINATED LAND
Consultee Comment
DESCRIPTION CONFIRMED
Supporting Information
DESCRIPTION OF DEVELOPMENT PLANNING ITEMS
Supporting Information
ECOLOGY
Consultee Comment
ECOLOGY
Consultee Comment
ENVIRONMENTAL HEALTH
Consultee Comment
ENVIRONMENTAL HEALTH
Consultee Comment
ENVIRONMENTAL HEALTH
Consultee Comment
EXISTING GROUND FLOOR PLAN (1 OF 2)
Plan
EXISTING GROUND FLOOR PLAN (2 OF 2)
Plan
EXISTING GROUND FLOOR PLAN (REDUCED SCALE)
Plan
EXISTING SITE ELEVATIONS (1 OF 2)
Plan
EXISTING SITE ELEVATIONS (2 OF 2)
Plan
EXISTING SITE ELEVATIONS (REDUCED SCALE)
Plan
FLOOD RISK REPORT
Supporting Information
HIGHWAYS
Consultee Comment
IDENTIFICATION OF WORKS 3D
Plan
LANDSCAPE MASTERPLAN
Plan
LANDSCAPE OFFICER
Consultee Comment
LOCATION PLAN
Location Plan
MINERALS AND WASTE
Consultee Comment
MINERALS AND WASTE
Consultee Comment
NETWORK RAIL
Consultee Comment
PEA STATUTORY METRIC
Supporting Information
PROCESS WATER PUMP HOUSE
Plan
PROPOSED GROUND FLOOR PLAN (1 OF 2)
Superseded
PROPOSED GROUND FLOOR PLAN (1 OF 2)
Plan
PROPOSED GROUND FLOOR PLAN (2 OF 2)
Plan
PROPOSED GROUND FLOOR PLAN (REDUCED SCALE)
Superseded
PROPOSED GROUND FLOOR PLAN (REDUCED SCALE)
Plan
PROPOSED SITE ELEVATIONS (1 OF 2)
Plan
PROPOSED SITE ELEVATIONS (2 OF 2)
Plan
PROPOSED SITE ELEVATIONS (REDUCED)
Plan
PROPOSED SITE PLAN - IDENTIFICATION OF PLAN
Superseded
SITE ELEVATIONS (1 OF 2) - PROPOSED
Plan
SITE ELEVATIONS (2 OF 2) - PROPOSED
Plan
SITE ELEVATIONS (REDUCED SCALE) - PROPOSED
Plan
STATUTORY BIODIVERSITY METRIC ASSESSMENTS
Supporting Information
SUB STATION PLANS AND ELEVATIONS
Plan
SUMMARY OF PLANNING APPLICATION
Supporting Information
SUPERSEDED IDENTIFICATION OF WORKS 3D
Superseded
UTILITY BUILDING RELOCATED
Plan
YORKSHIRE WATER
Consultee Comment
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.