← Back to Pembrokeshire Coast National Park Authority
Application
NP/25/0242/FUL
Pembrokeshire Coast National Park Authority · AGILE
Status
Valid - with Officers
New housing
Received
25 Apr 2025
New dwellings
3
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Reconfigure single-family house into three independent dwellings with added storey and new access.
Full Proposal
Reconfiguration of existing single family house to provide 3 independent dwellings by: - addition of a storey; reconfiguration of existing internal layout; removal of existing flat roof, and introduction of pitched roof and new vehicle access, along with changes to external hardstanding
Detail pages
- View live detail on council site
- No archived detail page available.
Documents
1002-P01 Site Location Plan
Submitted Drawings
Archived copy
· Council link
1003-P01 Existing Layout
Submitted Drawings
Not downloaded
· Council link
1004-P01 Existing Lower Ground Floor
Submitted Drawings
Not downloaded
· Council link
1005-P01 Existing Ground Floor
Submitted Drawings
Not downloaded
· Council link
1006-P01 Existing First Floor
Submitted Drawings
Not downloaded
· Council link
1007-P01 Proposed Layout
Submitted Drawings
Not downloaded
· Council link
1008-P01 Proposed Lower Ground Floor
Submitted Drawings
Not downloaded
· Council link
1009-P01 Proposed Ground Floor
Submitted Drawings
Not downloaded
· Council link
1010-P01 Proposed First Floor
Submitted Drawings
Not downloaded
· Council link
1010-P01 Proposed Second Floor
Submitted Drawings
Not downloaded
· Council link
2001-P01 Existing Elevations
Submitted Drawings
Not downloaded
· Council link
2003-P01 Proposed Elevations
Submitted Drawings
Not downloaded
· Council link
Application Form Redacted
Application forms
Not downloaded
· Council link
Consultee Response - Coal Authority 23/06/25
Consultee response
Not downloaded
· Council link
Consultee response - Community Council 7/7/25
Consultee response
Not downloaded
· Council link
Consultee Response - NRW 01/07/2025
Consultee response
Not downloaded
· Council link
Consultee Response - PCC Highways 10/7/25
Consultee response
Not downloaded
· Council link
Consultee Response - PCNPA Public Rights of Way 23/6/25
Consultee response
Not downloaded
· Council link
Consultee Response - Welsh Water 30/06/2025
Consultee response
Not downloaded
· Council link
Green Infrastructure Statement
Submitted documents
Not downloaded
· Council link