0806/25
London Borough of Redbridge
Status
Appeal Lodged
Change of use
Received
21 Mar 2025
New homes
6
Summary
Convert existing offices to six self-contained flats with associated bin and cycle stores.
Full proposal
Conversion of existing offices to 6no. self-contained flats with associated waste/refuse and cycle store. Alterations to fenestrations (summary)
Documents
01 Existing basement and ground floor plans v12 (1).pdf
Existing plan - floor plan
Not yet archived
· Original link
02 Existing 1st floor front 1st floor rear and 2nd floor r v12 (1).pdf
Existing plan - floor plan
Not yet archived
· Original link
03 Existing 2nd and 3rd floor front and 3rd floor rear extens v12 (1).pdf
Existing plan - floor plan
Not yet archived
· Original link
04 Proposed basement and ground floor plans v12 (1).pdf
Proposed plan - floor plan
Not yet archived
· Original link
05 Proposed 1st floor front 1st floor rear and 2nd floor r v12 (1).pdf
Proposed plan - floor plan
Not yet archived
· Original link
06 Proposed 2nd and 3rd floor front and 3rd floor rear ext v12.06 (2).pdf
Proposed plan - floor plan
Not yet archived
· Original link
09 Existing and proposed front elevation v12 (1).pdf
Combined plan - elevation
Not yet archived
· Original link
10 Existing and proposed rear elevation v12 (1).pdf
Combined plan - elevation
Not yet archived
· Original link
11 Existing and proposed west and south (light well) eleva v12 (1).pdf
Combined plan - elevation
Not yet archived
· Original link
Summit House 13 High Street Wanstead - Internal Daylight and Sunlight Assessment (2).pdf
Sunlight/daylight assessment
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.