← London Borough of Redbridge

Status

Under Consideration New housing
Received
10 Sep 2025
New homes
8

Summary

Redevelopment to provide eight 3-bedroom houses with parking, cycle and refuse storage.

Full proposal

Redevelopment of existing car park of Sinclair House to create 8no. (8 x 3 bedrooms) single dwelling houses with associated site infrastructure, car parking, cycle and waste / refuse storage and private amenity space. (SOME MATTERS RESERVED). (Summary).

Documents

2025.09.10 CIL Form.pdf
CIL supporting document
Not yet archived · Original link
Access Plan
Proposed plan
Not yet archived · Original link
AIA
Tree survey
Not yet archived · Original link
ApplicationFormRedacted.pdf
Application form
Not yet archived · Original link
Arboricultural Impact Assessment
Tree survey
Not yet archived · Original link
Biodiversity Metric Calculation Tool
Biodiversity report
Not yet archived · Original link
Biodiversity Net Gain Baseline Plan
Biodiversity report
Not yet archived · Original link
Biodiversity Net Gain Proposed Plan
Biodiversity report
Not yet archived · Original link
Biodiversity Net Gain Report
Biodiversity report
Not yet archived · Original link
BNG Baseline Plan
Biodiversity report
Not yet archived · Original link
BNG Calculator
Biodiversity report
Not yet archived · Original link
BNG Plan
Biodiversity report
Not yet archived · Original link
Construction Management Plan
Supporting document
Not yet archived · Original link
Existing Location Plan
Site/block plan
Not yet archived · Original link
Ground Investigation
Contamination assessment
Not yet archived · Original link
Ground Investigation Appendices A-B
Contamination assessment
Not yet archived · Original link
Ground Investigation Appendices C-F
Contamination assessment
Not yet archived · Original link
Ground Investigation Borehole Log
Contamination assessment
Not yet archived · Original link
Net Gain
Biodiversity report
Not yet archived · Original link
Planning and Design and Access Statement
Design and access statement
Not yet archived · Original link
Pre-Planning Fire Statement
Fire statement
Not yet archived · Original link
PRELIMINARY ECOLOGICAL APPRAISAL
Biodiversity report
Not yet archived · Original link
Revised Access Plan
Proposed plan
Not yet archived · Original link
Site/block plan
Archived · Original link
Proposed plan
Archived · Original link
Surface Water Drainage Strategy
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix B
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix C
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix D
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix E
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix G
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix H
SuDS supporting information
Not yet archived · Original link
Surface Water Drainage Strategy Appendix I
SuDS supporting information
Not yet archived · Original link
Transport Assessment
Transport assessment
Not yet archived · Original link
Travel Plan
Travel plan
Not yet archived · Original link
Tree Protection Plan
Tree survey
Not yet archived · Original link
Tree Protection Plan
Tree survey
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment