← Back to London Borough of Richmond upon Thames

Status

Decision Despatched Change of use
Received 23 Apr 2025
New dwellings 0

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Change from storage (B8) to light industrial (E(g)(iii)), upward extension, PV and facilities.

Full Proposal

Change of use of Units 1 and 2 from storage/warehouse (Class B8) to light industrial (Class E(g)(iii)). Erection of an upwards extension to both properties including the insertion of new windows on the front and rear elevation. Installation of PV panels on the roof. Provision of cycle storage and refuse & recycling facilities.

Detail pages

Documents

Application Form - Without Personal Data
Application Form - Redacted
Not downloaded · Council link
BLOCK PLAN
Revised Drawing
Not downloaded · Council link
Block Plan 000UN1-A-01-002
Superseded Drawing
Not downloaded · Council link
BLOCK PLANS
Superseded Drawing
Not downloaded · Council link
BLOCK PLANS
Submitted Drawing
Not downloaded · Council link
Block Plans 000UN1-A-01-002
Superseded Drawing
Not downloaded · Council link
Community Infrastructure Levy - Completed form
Application Form
Not downloaded · Council link
constraints
Report
Not downloaded · Council link
decision
Decision Notice
Not downloaded · Council link
Design Response
Report
Not downloaded · Council link
ENERGY AND SUSTAINABILITY STATEMENT
Report
Not downloaded · Council link
Existing and Proposed Block Plans 000UN1-A-01-002
Superseded Drawing
Not downloaded · Council link
EXISTING EAST ELEVATION
Submitted Drawing
Not downloaded · Council link
EXISTING FIRST FLOOR PLAN
Submitted Drawing
Not downloaded · Council link
EXISTING FRONT VISULATION
Submitted Drawing
Not downloaded · Council link
EXISTING GROUND FLOOR PLAN
Submitted Drawing
Not downloaded · Council link
EXISTING NORTH ELEVATION
Submitted Drawing
Not downloaded · Council link
EXISTING REAR VISULATION
Submitted Drawing
Not downloaded · Council link
EXISTING ROOF PLAN
Submitted Drawing
Not downloaded · Council link
EXISTING SECTION A-A
Submitted Drawing
Not downloaded · Council link
EXISTING SECTION B-B
Submitted Drawing
Not downloaded · Council link
EXISTING SOUTH ELEVATION
Submitted Drawing
Not downloaded · Council link
EXISTING WEST ELEVATION
Submitted Drawing
Not downloaded · Council link
FIRE STATMENT
Report
Not downloaded · Council link
GEO-ENVIROMENTAL REPORT
Report
Not downloaded · Council link
LOCATION PLAN
Submitted Drawing
Not downloaded · Council link
LOCATION PLAN
Superseded Drawing
Not downloaded · Council link
LOCATION PLAN
Revised Drawing
Not downloaded · Council link
Location Plan 000UN1-A-01-001
Superseded Drawing
Not downloaded · Council link
Location Plan 000UN1-A-01-001
Superseded Drawing
Not downloaded · Council link
Location Plan 000UN1-A-01-001
Superseded Drawing
Not downloaded · Council link
Merged Proposed Plans
Submitted Drawing
Archived copy · Council link
Officer report
Report
Not downloaded · Council link
PLANNING, DESIGN & ACCESS AND HERITAGE STATEMENT
Report
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-101
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-101
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-102
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-102
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-103
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-103
Superseded Drawing
Not downloaded · Council link
Proposed Elevation 000UN1-A-06-103
Superseded Drawing
Not downloaded · Council link
Proposed Elevations
Superseded Drawing
Not downloaded · Council link
Proposed Elevations 000UN1-A-06-102
Superseded Drawing
Not downloaded · Council link
Proposed Elevations 000UN1-A-06-103
Superseded Drawing
Not downloaded · Council link
PROPOSED ELEVATIONS 1
Superseded Drawing
Not downloaded · Council link
PROPOSED ELEVATIONS 2
Superseded Drawing
Not downloaded · Council link
PROPOSED ELEVATIONS 3
Superseded Drawing
Not downloaded · Council link
PROPOSED ELEVATIONS 4
Superseded Drawing
Not downloaded · Council link
Proposed Elevatoin 000UN1-A-06-104
Superseded Drawing
Not downloaded · Council link
Proposed Elevatoins 000UN1-A-06-104
Superseded Drawing
Not downloaded · Council link
Proposed First Floor 000UN1-A-03-102
Superseded Drawing
Not downloaded · Council link
Proposed First floor 000UN1-A-03-102
Superseded Drawing
Not downloaded · Council link
Proposed First Floor 000UN1-A-03-102
Superseded Drawing
Not downloaded · Council link
PROPOSED FIRST FLOOR PLAN
Revised Drawing
Not downloaded · Council link
PROPOSED FIRST FLOOR PLAN
Superseded Drawing
Not downloaded · Council link
PROPOSED FRONT ELEVATION
Revised Drawing
Not downloaded · Council link
PROPOSED FRONT VISUALISATION
Revised Drawing
Not downloaded · Council link
PROPOSED FRONT VISUALISATION
Superseded Drawing
Not downloaded · Council link
Proposed Front Visualisation 000UN1-A-02-101
Superseded Drawing
Not downloaded · Council link
Proposed Front Visualisation 000UN1-A-02-101
Superseded Drawing
Not downloaded · Council link
Proposed Front Visualizations 000UN1-A-02-101
Superseded Drawing
Not downloaded · Council link
Proposed Ground Floor 000UN1-A-03-101
Superseded Drawing
Not downloaded · Council link
Proposed Ground Floor 000UN1-A-03-101
Superseded Drawing
Not downloaded · Council link
Proposed Ground Floor 000UN1-A-03-101
Superseded Drawing
Not downloaded · Council link
PROPOSED GROUND FLOOR PLAN
Revised Drawing
Not downloaded · Council link
PROPOSED GROUND FLOOR PLAN
Superseded Drawing
Not downloaded · Council link
PROPOSED REAR ELEVATION
Revised Drawing
Not downloaded · Council link
PROPOSED REAR VISUALISATION
Revised Drawing
Not downloaded · Council link
PROPOSED REAR VISUALISATION
Superseded Drawing
Not downloaded · Council link
Proposed Rear Visualisation 000UN1-A-02-102
Superseded Drawing
Not downloaded · Council link
Proposed Rear Visualization 000UN1-A-02-102
Superseded Drawing
Not downloaded · Council link
Proposed Rear Visualization 00UN1-A-02-102
Superseded Drawing
Not downloaded · Council link
PROPOSED ROOF PLAN
Superseded Drawing
Not downloaded · Council link
PROPOSED ROOF PLAN
Revised Drawing
Not downloaded · Council link
Proposed Roof Plan 000UN1-A-03-106
Superseded Drawing
Not downloaded · Council link
Proposed Roof Plan 000UN1-A-03-106
Superseded Drawing
Not downloaded · Council link
Proposed Roof Plan 000UN1-A-03-106
Superseded Drawing
Not downloaded · Council link
PROPOSED SECTION A-A
Revised Drawing
Not downloaded · Council link
PROPOSED SECTION A-A
Superseded Drawing
Not downloaded · Council link
Proposed Section AA 000UN1-A-05-101
Superseded Drawing
Not downloaded · Council link
Proposed SEction AA 000UN1-A-05-101
Superseded Drawing
Not downloaded · Council link
Proposed Section AA 000UN1-A-05-101
Superseded Drawing
Not downloaded · Council link
PROPOSED SECTION B-B
Superseded Drawing
Not downloaded · Council link
PROPOSED SECTION B-B
Revised Drawing
Not downloaded · Council link
Proposed Section BB 000UN1-A-05-102
Superseded Drawing
Not downloaded · Council link
Proposed Section BB 000UN1-A-05-102
Superseded Drawing
Not downloaded · Council link
Proposed Section BB 000UN1-A-05-102
Superseded Drawing
Not downloaded · Council link
PROPOSED SIDE ELEVATION 1
Revised Drawing
Not downloaded · Council link
PROPOSED SIDE ELEVATION 2
Revised Drawing
Not downloaded · Council link
Reference: The location plan
Location plan
Not downloaded · Council link
Sustainable Construction Checklist (updated)
Report
Not downloaded · Council link
The location plan
Location plan
Not downloaded · Council link
TRANSPORT TECHNICAL HELP
Report
Not downloaded · Council link