← Rugby Borough Council

Status

Consultation Carried Out New housing
Received
20 Jun 2025
New homes
216

Summary

Erection of 216 dwellings with access, parking, garages and associated works.

Full proposal

Erection of 216 dwellings and associated works and development including access roads, parking and garages (application for approval of reserved matters relating to access, appearance, landscaping, layout and scale pursuant to outline planning permission R17/0022)

Documents

1.0 m High Estate Railings details (SDER-10, 23-07-25)
Supporting Information
Not yet archived · Original link
1.2m High Ball Top Railings with Hedgerow (SDR 04, 23-07-25)
Supporting Information
Not yet archived · Original link
1.8m High Screen Fence details (SDF 09, 23-07-25)
Supporting Information
Not yet archived · Original link
1.8m High Screen Wall (SDW 101, 23-07-25)
Supporting Information
Not yet archived · Original link
35° Brick Corbel Details (WD-GD-EN-032 Rev A, 23-07-25)
Supporting Information
Not yet archived · Original link
Apartments Nationally Described Space Standards table (n2528, 23-07-25)
Supporting Information
Not yet archived · Original link
Application Form (Redacted) (19-06-25)
Application Form
Not yet archived · Original link
Arboricultural Impact Assessment (BG26-262-2, 20-06-25)
Tree Report/plan
Not yet archived · Original link
Arboricultural Impacts Plan (Sheets 1 and 2) (BG25-262-BRGR-ZZ-ZZ-DR-L - 00003-P01 and 00004-P01) (20-06-25)
Tree Report/plan
Not yet archived · Original link
Arboricultural Method Statement (BG26-262-2, 20-06-25)
Tree Report/plan
Not yet archived · Original link
Attenuation Details (25730-322, 05-09-25)
Drainage
Not yet archived · Original link
Brick Detailing Infill Panel (R90XX-SMH-24-XX-SD-K-0310 Rev C01, 23-07-25)
Supporting Information
Not yet archived · Original link
Close Coupled Substation General Arrangement (GTC-E-SS-0012 R2-1 , 23-07-25)
Proposed Plans
Not yet archived · Original link
Covering Letter (CS-01-n2528, 20-06-25)
Supporting Information
Not yet archived · Original link
Covering Letter from Agent - Amended Plans (CS-01-n2528, 03-10-25)
Supporting Information
Not yet archived · Original link
Design Code Compliance Statement (20-06-25)
Design and Access Statement
Not yet archived · Original link
Drainage - Attenuation Details (25730-322, 03-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Drainage Strategy Plan (25730-200-E, 03-10-25)
Superseded
Not yet archived · Original link
Drainage - Drainage Strategy Plan (25730-200-F, 31-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Drained Area Plan (25730-201-B, 03-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Land Drain Overland Flow Sketch (25730-SK08, 03-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Land Drainage Works (25730 208, 31-10-25)
Drainage
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow - 1 in 100 Year + 40% CC FEH (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow - 1 in 100 Year + 40% CC FEH (31-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow - 1 in 100 Year + 40% CC FSR (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow - 1 in 100 Year + 40% CC FSR (31-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow Greenfield Runoff (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - Overland Flow Greenfield Runoff (31-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 1 Year FSR (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 1 Year FSR (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 100 Year + 40% CC FEH (03-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 100 Year + 40% CC FSR (03-10-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 100 Year + 40%CC FEH (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 100 Year + 40%CC FSR (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 30 Year FSR (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW 1 in 30 Year FSR (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW Network Details (03-10-25)
Superseded
Not yet archived · Original link
Drainage - Micro Drainage - 25730 - SW Network Details (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Drainage - Private Drainage Construction Detials (25730 - 314, 31-10-25)
Drainage
Not yet archived · Original link
Drainage - Surface Water - Technical Note (25730 -TL-001, 10-07-25)
Drainage
Not yet archived · Original link
Drainage Strategy Plan (25730-200-C, 20-06-25)
Superseded
Not yet archived · Original link
Drainage Strategy Plan (25730-200-D, 05-09-25)
Superseded
Not yet archived · Original link
Drainage Technical Note (25730-TL-001, 05-09-25)
Flood Risk Assessment
Not yet archived · Original link
Drained Area Plan (25730 - 201(D), 07-11-25)
Drainage
Not yet archived · Original link
Drained Area Plan (25730-201-A, 20-06-25)
Superseded
Not yet archived · Original link
Drained Area Plan (25730-201-C, 31-10-25)
Superseded
Not yet archived · Original link
Ecological Implementation Plan (BG25-262-EIP-2, 20-06-25)
Ecology Report
Not yet archived · Original link
Energy Statement (20-06-25)
Supporting Information
Not yet archived · Original link
Flat over Garage (FOG) Nationally Described Space Standards table (n2528, 23-07-25)
Supporting Information
Not yet archived · Original link
Gable Verge Bargeboard Fixing Detail (RF-GD-EN-011 Rev P1, 23-07-25)
Supporting Information
Not yet archived · Original link
Geotechnical and Geo-environmental Ground Investigation Interpretive Report (60051619-ACM-KP4-DP-RP-GE-000001-C02, 20-06-25)
Supporting Information
Not yet archived · Original link
Highways - Adoptable Road Plan (25730-203-C, 20-06-25)
Superseded
Not yet archived · Original link
Highways - Adoptable Road Plan (25730-203-E, 03-10-25)
Superseded
Not yet archived · Original link
Highways - Adoptable Road Plan (25730-203-F, 27-10-25)
Highway plans/information
Not yet archived · Original link
Highways - Adoptable Road Plan - Delivery Vehicle (Sheet 3 of 4) (25730-204(3)-D, 03-10-25)
Highway plans/information
Not yet archived · Original link
Highways - Adoptable Road Plan - Fire Tender (Sheet 2 of 4) (25730-204(2)-E, 03-10-25)
Highway plans/information
Not yet archived · Original link
Highways - Adoptable Road Plan - Refuse and MPV (Sheet 1 of 4) (25730-204(1)-F, 03-10-25)
Highway plans/information
Not yet archived · Original link
Highways - Adoptable Road Plan - Refuse Junction Manoeuvre (Sheet 4 of 4) (25730-204(4), 03-10-25)
Highway plans/information
Not yet archived · Original link
Highways - Longitudinal Sections (Sheet 1 of 2) (25730-207(1), 20-06-25)
Highway plans/information
Not yet archived · Original link
Highways - Longitudinal Sections (Sheet 2 of 2) (25730-207(2), 20-06-25)
Highway plans/information
Not yet archived · Original link
Highways - Swept Path Analysis (Sheet 1 of 3) (25730-204(1)-C, 20-06-25)
Highway plans/information
Not yet archived · Original link
Highways - Swept Path Analysis (Sheet 2 of 3) (25730-204(2)-C, 20-06-25)
Highway plans/information
Not yet archived · Original link
Highways - Swept Path Analysis (Sheet 3 of 3) (25730-204(3)-C, 20-06-25)
Highway plans/information
Not yet archived · Original link
House Type Pack (10-07-25)
Superseded
Not yet archived · Original link
House Type Pack - September 2025 (n2528, 03-10-25)
House Types
Not yet archived · Original link
House Type Pack July 2025 Rev A (30-07-25)
House Types
Not yet archived · Original link
Indicative Electric Vehicle Charging Point (EVCP) Plan (n2528-008-05 Rev A, 23-07-25)
Superseded
Not yet archived · Original link
Indicative Electric Vehicle Charging Point (EVCP) Plan (n2528-008-05-A, 20-06-25)
Superseded
Not yet archived · Original link
Indicative Electric Vehicle Charging Point (EVCP) Plan (n2528-008-05-B, 03-10-25)
Proposed Plans
Not yet archived · Original link
Indicative Visualisation Pack (20-06-25)
Supporting Information
Not yet archived · Original link
Indicative Visualisation Pack (Additional) (03-10-25)
Supporting Information
Not yet archived · Original link
Key Phase 4 Design Guide
Background Information
Not yet archived · Original link
Key Phase 4 Regulatory Plan
Background Information
Not yet archived · Original link
Landscape Management Plan (GL2486-1, 20-06-25)
Landscaping
Not yet archived · Original link
Landscape Specification (GL2486-SP-01, 20-06-25)
Landscaping
Not yet archived · Original link
Layout Plan (Colour) (n2528-009, 20-06-25)
Superseded
Not yet archived · Original link
Layout Plan (Colour) (n2528-009-C, 03-10-25)
Proposed Plans
Not yet archived · Original link
Layout Plan (Technical) (n2528-008, 20-06-25)
Superseded
Not yet archived · Original link
Layout Plan (Technical) (n2528-008-C, 03-10-25)
Proposed Plans
Not yet archived · Original link
Letter from JPP - Can Scale from Plans (TL-NR -L-25730-TN, 02-07-25)
Miscellaneous Documents
Not yet archived · Original link
Levels Strategy (25730-202-C, 20-06-25)
Superseded
Not yet archived · Original link
Levels Strategy (25730-202-D, 03-10-25)
Superseded
Not yet archived · Original link
Levels Strategy (25730-202-E, 27-10-25)
Proposed Plans
Not yet archived · Original link
Material and Boundary Treatment Plan (n2528-008-04-B, 20-06-25)
Superseded
Not yet archived · Original link
Material and Boundary Treatment Plan (n2528-008-04-D, 03-10-25)
Proposed Plans
Not yet archived · Original link
Micro Drainage - 25730 - SW 1 in 1 Year FSR (05-09-25)
Superseded
Not yet archived · Original link
Micro Drainage - 25730 - SW 1 in 100 Year + 40%CC FEH (05-09-25)
Superseded
Not yet archived · Original link
Micro Drainage - 25730 - SW 1 in 100 Year + 40%CC FSR (05-09-25)
Superseded
Not yet archived · Original link
Micro Drainage - 25730 - SW 1 in 30 Year FSR (05-09-25)
Superseded
Not yet archived · Original link
Micro Drainage - 25730 - SW Network Details (05-09-25)
Superseded
Not yet archived · Original link
Noise Impact Assessment (DC5089-NR1v2, 20-06-25)
Noise Report
Not yet archived · Original link
Planning Compliance Statement (n2528, 20-06-25)
Superseded
Not yet archived · Original link
Planning Compliance Statement June 2025 (01-08-25)
Planning Statement
Not yet archived · Original link
Planning Compliance Statement June 2025 (23-07-25)
Superseded
Not yet archived · Original link
Planning Layout (Coloured) (n2528-009 Rev A, 23-07-25)
Superseded
Not yet archived · Original link
Planning Layout (Coloured) (n2528-009 Rev B, 01-08-25)
Proposed Plans
Not yet archived · Original link
Planning Layout (Technical) (n2528 008 Rev A, 23-07-25)
Superseded
Not yet archived · Original link
Planning Layout (Technical) (n2528 008 Rev B, 01-08-25)
Superseded
Not yet archived · Original link
Private Drainage Layout (Sheet 1 of 2) (25730 - 351(1A), 07-11-25)
Drainage
Not yet archived · Original link
Private Drainage Layout (Sheet 2 of 2) (25730 - 351(2A), 07-11-25)
Drainage
Not yet archived · Original link
Response to WCC FRM Comments - Email (05-09-25)
Flood Risk Assessment
Not yet archived · Original link
Response to WCC FRM Comments - Email (07-11-25)
Flood Risk Assessment
Not yet archived · Original link
Response to WCC FRM Comments - Email (31-10-25)
Flood Risk Assessment
Not yet archived · Original link
Road Safety Audit Brief (20-06-25)
Highway plans/information
Not yet archived · Original link
Shed Floor Plans and Elevations (23-07-25)
Proposed Plans
Not yet archived · Original link
Site Sections (Sheet 1 of 2) (25730-205(1)-C, 20-06-25)
Proposed Plans
Not yet archived · Original link
Site Sections (Sheet 2 of 2) (25730-205(2)-C, 20-06-25)
Proposed Plans
Not yet archived · Original link
Site Sections - Plots 126-136 and 198-195 (25730-205(4)-A, 03-10-25)
Superseded
Not yet archived · Original link
Site Sections - Plots 126-136 and 198-195 (25730-205(4)-B, 27-10-25)
Sections
Not yet archived · Original link
Site Sections - Plots 144 -153 Sections (25730-206(6) - A, 27-10-25)
Sections
Not yet archived · Original link
Site Sections - Plots 144 -153 Sections (25730-206(6), 03-10-25)
Superseded
Not yet archived · Original link
Site Sections - Plots 51-68 Sections (25730-205(3)-A, 03-10-25)
Superseded
Not yet archived · Original link
Site Sections - Plots 51-68 Sections (25730-205(3)-B, 27-10-25)
Sections
Not yet archived · Original link
Site Sections - Plots 99-116 and 86-92 (25730-205(5)-A, 03-10-25)
Superseded
Not yet archived · Original link
Site Sections - Plots 99-116 and 86-92 (25730-205(5)-B, 27-10-25)
Sections
Not yet archived · Original link
Soft Landscape Proposals 1 (GL2486-LP-01, 20-06-25)
Landscaping
Not yet archived · Original link
Soft Landscape Proposals 1 (GL2486-LP-01-A, 03-10-25)
Landscaping
Not yet archived · Original link
Soft Landscape Proposals 2 (GL2486-LP-02, 20-06-25)
Landscaping
Not yet archived · Original link
Soft Landscape Proposals 2 (GL2486-LP-02-A, 03-10-25)
Landscaping
Not yet archived · Original link
Soft Landscape Proposals 3 (GL2486-LP-03, 20-06-25)
Landscaping
Not yet archived · Original link
Soft Landscape Proposals 3 (GL2486-LP-03-A, 03-10-25)
Landscaping
Not yet archived · Original link
Surface Materials (n2528 008-07, 23-07-25)
Superseded
Not yet archived · Original link
Surface Materials Plan (n2528-008-07-A, 03-10-25)
Proposed Plans
Not yet archived · Original link
Sustainability Checklist (20-06-25)
Sustainability Checklist
Not yet archived · Original link
Sustainability Compliance and Energy Statement Rev A 07/08/25 rec'd
Supporting Information
Not yet archived · Original link
Topographical Survey (Sheet 1 of 3) (30079Y-01, 20-06-25)
Site Plan
Not yet archived · Original link
Topographical Survey (Sheet 2 of 3) (30079Y-02, 20-06-25)
Site Plan
Not yet archived · Original link
Topographical Survey (Sheet 3 of 3) (30079Y-03, 20-06-25)
Site Plan
Not yet archived · Original link
Tree Constraints Plan (Sheets 1 and 2) (BG25-262-BRGR-ZZ-ZZ-DR-L - 00001-P01 and 00002-P01) (20-06-25)
Tree Report/plan
Not yet archived · Original link
Tree Protection Plan (Sheets 1 and 2) (BG25-262-BRGR-ZZ-ZZ-DR-L - 00005-P01 and 00006-P01) (20-06-25)
Tree Report/plan
Not yet archived · Original link
Waste Audit (20-06-25)
Supporting Information
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment