Summary
Hybrid application for warehousing/distribution units, ancillary offices, and associated infrastructure works.
Full Proposal
Hybrid planning application comprising:
- Full planning application for the erection of one Use Class B8 (Warehousing and Distribution) unit, with ancillary Use E(G)(i) (offices) with associated infrastructure including vehicle parking and service areas (including lorry parking), sustainable drainage provision, gate house, sprinkler tanks, pump houses, gas and electricity substations. Earthworks and plateauing of the wider development site including the formation of bunds. Completion of the Sustainable Transport Corridor connection to adjacent land to the east and the creation of the Potsford Dam link to the A4701 roundabout including associated landscaping and infrastructure, bridge to Cawston Greenway and the creation of the Cawston Landscape Park.
- Outline planning application for Use Class B8 (Warehousing and Distribution) units with ancillary Use Class (G)(i) (offices) with associated site infrastructure including vehicle parking and service areas (including lorry parking), energy centre, landscaping, sustainable drainage system. All matters reserved expect means of access.
Reasonable Objection Grounds
These are planning grounds where objections may be reasonable for this
application:
Traffic
Scale
Amenity
Likely Support Reasons
These are potential reasons to support this application based on the
proposal:
Employment
Infrastructure
Sustainability
Documents
Amended Cover letter Dated 03/10/25
Application Letter
Amended Planning Statement - Rcd 13.10.2025
Planning Statement
Application Form - Without Personal Data - Rcd 06.10.2025
Application Form
BNG Metric - Rcd 13.10.2025
Ecology Report
Both - 1 in 100 Roundabout Drainage documentation
Drainage
Both - Context Plan - Rcd 06.10.2025
Plans
Both - Cut and Fill Analysis Earthworks - Rcd 06.10.2025
Plans
Both - Drainage Construction Details Sheet 1 of 2- Rcd 06.10.2025
Drainage
Both - Drainage Construction Details Sheet 2 of 2 - Rcd 06.10.2025
Drainage
Both - Earthworks - Rcd 06.10.2025
Plans
Both - ES V2 Phasing Plan - Rcd 06.10.2025
Plans
Both - Existing Exceedance Sheet 1 - Rcd 06.10.2025
Drainage
Both - Existing Exceedance Sheet 2 - Rcd 06.10.2025
Drainage
Both - Existing Exceedance Sheet 3 - Rcd 06.10.2025
Drainage
Both - Existing Exceedance Sheet 4 - Rcd 06.10.2025
Drainage
Both - Existing Exceedance Sheet 5 - Rcd 06.10.2025
Drainage
Both - Existing Exceedance Sheet 6 - Rcd 06.10.2025
Drainage
Both - Illustrative Masterplan - Rcd 06.10.2025
Plans
Both - Parameters Plan - Rcd 06.10.2025
Plans
Both - Proposed Exceedance Sheet 1 - Rcd 06.10.2025
Drainage
Both - Proposed Exceedance Sheet 2 - Rcd 06.10.2025
Drainage
Both - Proposed Exceedance Sheet 3 - Rcd 06.10.2025
Drainage
Both - Proposed Exceedance Sheet 4 - Rcd 06.10.2025
Drainage
Both - Proposed Exceedance Sheet 5 - Rcd 06.10.2025
Drainage
Both - Proposed Exceedance Sheet 6 - Rcd 06.10.2025
Drainage
Both - Proposed Foul Water Drainage Sheet 6 - Rcd 06.10.2025
Drainage
Both - Pump Station compound layout Plan - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 71 - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 72 - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 73 - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 74 - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 75 - Proposed - Rcd 06.10.2025
Plans
Both - Site Levels Plan 60 76 - Proposed - Rcd 06.10.2025
Plans
Both - SuDS Maintenance Plan supporting information
Drainage
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 01 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 02 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 03 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 04 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 05 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 06 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 07 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 08 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 09 - Rcd 06.10.2025
Highway plans/information
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 10 - Rcd 06.10.2025
Highway plans/information
Broadband Statement - Telecoms supplementary info - Rcd 06.10.2025
Supplementary Report
Community Infrastructure Levy - Completed form - Rcd 06.10.2025
CIL form
Design and access statement - Rcd 06.10.2025
Design and Access Statement
Design Code Compliance Tracker - Rcd 13.10.2025
Planning Statement
Economic Impact Assessment - Rcd 06.10.2025
Supplementary Report
Electric Vehicle Charging Statement - Rcd 06.10.2025
Supplementary Report
Environmental Statement Non Technical Summary Part 1 of 6 - Rcd 06.10.2025
Environmental Statement
Environmental Statement Non Technical Summary Part 2 of 6 - Rcd 06.10.2025
Environmental Statement
Environmental Statement Non Technical Summary Part 3 of 6 - Rcd 06.10.2025
Environmental Statement
Environmental Statement Non Technical Summary Part 4 of 6 - Rcd 06.10.2025
Environmental Statement
Environmental Statement Non Technical Summary Part 5 of 6 - Rcd 06.10.2025
Environmental Statement
Environmental Statement Non Technical Summary Part 6 of 6 - Rcd 06.10.2025
Environmental Statement
ES V1 Environmental statement Main Report - Rcd 06.10.2025
Environmental Statement
ES V2 AIA Part 1 (inc all Appendices) - Rcd 06.10.2025
Tree Report/plan
ES V2 AIA Part 2 (Plans EDP1-EDP2) - Rcd 06.10.2025
Tree Report/plan
ES V2 AIA Part 3 (Plans EDP2) - Rcd 06.10.2025
Tree Report/plan
ES V2 Air Q Leg and Policy Context - Rcd 06.10.2025
Air Quality Report
ES V2 Air Quality Figures - Rcd 06.10.2025
Air Quality Report
ES V2 Archaeological and Heritage Baseline Assessment - Rcd 06.10.2025
Archaeology Report
ES V2 BNG Assessment Part 1 - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 2 (Apdx EDP1 cont-EDP2) - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 3 (Apdx EDP2) - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 4 (Apdx EDP3) - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 5 (Apdx EDP3) - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 6 (Apdx EDP3) - Rcd 06.10.2025
Ecology Report
ES V2 BNG Assessment Part 7 (Apdx EDP 4 and Plans) - Rcd 06.10.2025
Ecology Report
ES V2 Climate Change Policy and Guidance - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Climate Projections Data and Figures - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Committed Developments - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Construction and Dust Assessment - Rcd 06.10.2025
Air Quality Report
ES V2 Cumulative Assessment - Rcd 06.10.2025
Landscaping
ES V2 Ecological Receptor Results - Rcd 06.10.2025
Air Quality Report
ES V2 Economic Impact Assessment - Rcd 06.10.2025
Supplementary Report
ES V2 EPUK IAQM Guidance (2017) Screening Criteria - Rcd 06.10.2025
Air Quality Report
ES V2 Figure Showing Links Comprising the Study Area - Rcd 06.10.2025
Transport Report
ES V2 FRA Part 1 - Rcd 06.10.2025
Flood Risk Assessment
ES V2 FRA Part 2 - Rcd 06.10.2025
Flood Risk Assessment
ES V2 Framework Travel Plan Part 1 - Rcd 06.10.2025
Transport Report
ES V2 Framework Travel Plan Part 2 (Apdx A) - Rcd 06.10.2025
Transport Report
ES V2 Framework Travel Plan Part 3 (Apdx B) - Rcd 06.10.2025
Transport Report
ES V2 Framework Travel Plan Part 4 (Apdx C) - Rcd 06.10.2025
Transport Report
ES V2 Geophysical Survey Report G1503 Part 1 (Figs 1-8) - Rcd 06.10.2025
Archaeology Report
ES V2 Geophysical Survey Report G1503 Part 2 (Figs 9-16) - Rcd 06.10.2025
Archaeology Report
ES V2 HGV Route Managment Strategy - Rcd 06.10.2025
Transport Report
ES V2 Human Receptor Results - Rcd 06.10.2025
Air Quality Report
ES V2 Illustrative Masterplan and Landscape Strategy - Rcd 06.10.2025
Landscaping
ES V2 Kernon Countryside Consultants Limited Agricultural Land Classification Report - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Land at Cawston Farm (Phase II) Archaeological Excavation Report - Rcd 06.10.2025
Archaeology Report
ES V2 Land at Cawston Farm Archaeological Evaluation Report - Rcd 06.10.2025
Archaeology Report
ES V2 Land at Cawston, Rugby, Warwickshire Geophysical Survey Report - Rcd 06.10.2025
Archaeology Report
ES V2 Land N. of A45/M45 junction Rugby Archaeological Evaluation Report - Rcd 06.10.2025
Archaeology Report
ES V2 Landscape Strategy - Rcd 06.10.2025
Landscaping
ES V2 LEMP Unit 8 Part 1 - Rcd 06.10.2025
Ecology Report
ES V2 LEMP Unit 8 Part 2 (Apdx EPD1 cont-EPD2) - Rcd 06.10.2025
Ecology Report
ES V2 LEMP Unit 8 Part 3 (Apdx EPD2) - Rcd 06.10.2025
Ecology Report
ES V2 LEMP Unit 8 Part 4 (Apdx EPD3-EPD4) - Rcd 06.10.2025
Ecology Report
ES V2 Lighting Impact Assessment - Rcd 06.10.2025
Supplementary Report
ES V2 LVIA Baseline Assessment - Rcd 06.10.2025
Landscaping
ES V2 Noise and Vibration Figures - Rcd 06.10.2025
Noise Report
ES V2 Noise and Vibration Policy Context Legislation Guidance - Rcd 06.10.2025
Noise Report
ES V2 Outline Energy Statement and Sustainability Checklist - Rcd 06.10.2025
Sustainability Checklist
ES V2 Parameter Plan - Rcd 06.10.2025
Plans
ES V2 Photomontages - Rcd 06.10.2025
Landscaping
ES V2 Potford Dam Link Road Drawings - Rcd 06.10.2025
Highway plans/information
ES V2 PSMS Rcd 06.10.2025
Ecology Report
ES V2 Road Traffic Emissions Air Quality Model Inputs and Results Processing - Rcd 06.10.2025
Air Quality Report
ES V2 Road Traffic Emissions Air Quality Model Verification - Rcd 06.10.2025
Air Quality Report
ES V2 Site Agricultural Land Classification - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Soft Landscape Proposals Part 1 of 3 - Rcd 06.10.2025
Landscaping
ES V2 Soft Landscape Proposals Part 2 of 3 - Rcd 06.10.2025
Landscaping
ES V2 Soft Landscape Proposals Part 2 of 3 - Rcd 06.10.2025
Landscaping
ES V2 Soil Sampling Map - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Sound Survey Equipment Calibration Information - Rcd 06.10.2025
Noise Report
ES V2 Sound Survey Time History Graphs - Rcd 06.10.2025
Noise Report
ES V2 Statement of Expertise - Rcd 06.10.2025
Environmental Statement Appendix
ES V2 Surface Water Drainage Strategy Part 1 of 2 - Rcd 06.10.2025
Drainage
ES V2 Surface Water Drainage Strategy Part 2 of 2 - Rcd 06.10.2025
Drainage
ES V2 Table of Effects Visual Amenity - Rcd 06.10.2025
Landscaping
ES V2 Transport Assessment Part 1 - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 2 (Apdx A-D) - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 3 (Apdx E-F) - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 4 - (Apdx F-I) - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 5 - (Apdx I-J) - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 6 - (Apdx J cont) - Rcd 06.10.2025
Transport Report
ES V2 Transport Assessment Part 7 - (Apdx J-K) - Rcd 06.10.2025
Transport Report
ES V2 Transport Nat and Local Policy and Guidance - Rcd 06.10.2025
Transport Report
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 1 - Rcd 06.10.2025
Archaeology Report
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 2 - Rcd 06.10.2025
Archaeology Report
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 3 - Rcd 06.10.2025
Archaeology Report
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 4 - Rcd 06.10.2025
Archaeology Report
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 5 - Rcd 06.10.2025
Archaeology Report
ES V2 Wirelines - Rcd 06.10.2025
Landscaping
ES V2 Woodland Managment Plan Part 1 - Rcd 06.10.2025
Tree Report/plan
ES V2 Woodland Managment Plan Part 2 (Apdx 1 cont) - Rcd 06.10.2025
Tree Report/plan
ES V2 Woodland Managment Plan Part 3 (Apdx 1 cont) - Rcd 06.10.2025
Tree Report/plan
ES V2 Woodland Managment Plan Part 4 (Apdx 1-3) - Rcd 06.10.2025
Tree Report/plan
ES V2 Woodland Managment Plan Part 5 (Apdx 3-4) - Rcd 06.10.2025
Tree Report/plan
ES V2 Woodland Managment Plan Part 6 (Apdx 4-6 and Plans) - Rcd 06.10.2025
Tree Report/plan
ES V2 WSI for an Archaeological and Heritage Baseline Assessment - Rcd 06.10.2025
Archaeology Report
ES V2 WSI for an Archaeological Evaluation - Rcd 06.10.2025
Archaeology Report
Existing Levels (from FRA) - Rcd 06.10.2025
Existing Plans
Full - Area Plans - Unit 8 Rcd 06.10.2025
Plans
Full - Bin Storage - Rcd 06.10.2025
Plans
Full - Bridge Plan - Rcd 06.10.2025
Highway plans/information
Full - Carriageway and Pavement - Rcd 06.10.2025
Highway plans/information
Full - Cawston Landscape Park details
Landscaping
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 01 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 02 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 03 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 04 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 05 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 06 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 07 - Rcd 06.10.2025
Highway plans/information
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 08 - Rcd 06.10.2025
Highway plans/information
Full - Contours and Longsections Sheet 1 of 4 - Rcd 06.10.2025
Highway plans/information
Full - Contours and Longsections Sheet 2 of 4 - Rcd 06.10.2025
Highway plans/information
Full - Contours and Longsections Sheet 3 of 4 - Rcd 06.10.2025
Highway plans/information
Full - Contours and Longsections Sheet 4 of 4 - Rcd 06.10.2025
Highway plans/information
Full - Cycle Shelters - Rcd 06.10.2025
Plans
Full - Drainage and Services - Rcd 06.10.2025
Drainage
Full - ES V2 Unit 8 Drawings Part 1 - Rcd 06.10.2025
Plans
Full - ES V2 Unit 8 Drawings Part 2 - Rcd 06.10.2025
Plans
Full - ES V2 Unit 8 Drawings Part 3 - Rcd 06.10.2025
Plans
Full - External Construction Details - Rcd 06.10.2025
Drainage
Full - External Materials - Rcd 06.10.2025
Plans
Full - Fencing Details - Rcd 06.10.2025
Plans
Full - Foul Connection Point
Drainage
Full - General Arrangement - Rcd 06.10.2025
Highway plans/information
Full - General Arrangement Sheet 1 of 3 - Rcd 06.10.2025
Highway plans/information
Full - General Arrangement Sheet 2 of 3 - Rcd 06.10.2025
Highway plans/information
Full - General Arrangement Sheet 3 of 3 - Rcd 06.10.2025
Highway plans/information
Full - Impermeable Areas Plan - Rcd 06.10.2025
Drainage
Full - Kerbs and Footways - Rcd 06.10.2025
Highway plans/information
Full - Land to be dedicated - Rcd 06.10.2025
Highway plans/information
Full - Pond Section - Proposed - Rcd 06.10.2025
Drainage
Full - Potford Dam Drainage
Drainage
Full - Proposed Drainage Layout Sheet 1 - Rcd 06.10.2025
Drainage
Full - Proposed Drainage Layout Sheet 2 - Rcd 06.10.2025
Drainage
Full - Proposed Gatehouse - Elevation (Front) - Rcd 06.10.2025
Plans
Full - Proposed U8 Area PLan - Rcd 06.10.2025
Plans
Full - Proposed Unit 8 Elevations - Rcd 06.10.2025
Plans
Full - Proposed Unit 8 Sections - Rcd 06.10.2025
Plans
Full - Risk Management - Rcd 06.10.2025
Highway plans/information
Full - RMU - Rcd 06.10.2025
Plans
Full - Roundabout Geometry - Rcd 06.10.2025
Highway plans/information
Full - Roundabout Visibilties - Rcd 06.10.2025
Highway plans/information
Full - Section - Proposed
Drainage
Full - Signs and Markings - Rcd 06.10.2025
Highway plans/information
Full - Site Clearance - Rcd 06.10.2025
Highway plans/information
Full - Soft Landscaping details
Landscaping
Full - Sprinkler Tanks - Rcd 06.10.2025
Plans
Full - Street Lighting Plan - Rcd 06.10.2025
Plans
Full - Surface Water Drainage Calcs
Drainage
Full - Unit 8 External Works Sheet 1 - Rcd 06.10.2025
Plans
Full - Unit 8 External Works Sheet 2- Rcd 06.10.2025
Plans
Full - Unit 8 lighting, from ES V2 Lighting Impact Assessment - Rcd 06.10.2025
Plans
Full - Unit 8 Proposed Office Layout Plan - Rcd 06.10.2025
Plans
Full - Unit 8 Proposed Warehouse Layout Plan - Rcd 06.10.2025
Plans
Full - Unit 8 Roof Plan Full PV Cover - Rcd 06.10.2025
Plans
Full - Unit 8 Roof Plan Partial PV - Rcd 06.10.2025
Plans
Full - Vehicle Swept Paths Sheet 1 of 2 - Rcd 06.10.2025
Highway plans/information
Full - Vehicle Swept Paths Sheet 2 of 2 - Rcd 06.10.2025
Highway plans/information
Full - Watercourse Culvert
Drainage
Ground Investigation Report Part 1 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 2 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 3 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 4 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 5 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 6 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground Investigation Report Part 7 of 7 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 1 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 2 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 3 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 4 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 5 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 6 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 7 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 8 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Roundabout Part 9 of 9 - Rcd 06.10.2025
Environmental Statement (part)
Ground IR - Technical Note Service Trenches - Rcd 06.10.2025
Environmental Statement (part)
Ground IR -Technical Note Initial Investigation- Rcd 06.10.2025
Environmental Statement (part)
Health Impact Assessment Screening Report Part 2 of 3 - Rcd 06.10.2025
Supplementary Report
Health Impact Assessment Screening Report Part 1 of 3 - Rcd 06.10.2025
Supplementary Report
Health Impact Assessment Screening Report Part 2 of 3 - Rcd 06.10.2025
Supplementary Report
Outline - External Works Sheet 3 - Rcd 06.10.2025
Plans
Outline - External Works Sheet 4 - Rcd 06.10.2025
Plans
Outline - External Works Sheet 5 - Rcd 06.10.2025
Plans
Outline - External Works Sheet 6 - Rcd 06.10.2025
Plans
Outline - Proposed Drainage Layout Sheet 3 - Rcd 06.10.2025
Drainage
Outline - Proposed Drainage Layout Sheet 4 - Rcd 06.10.2025
Drainage
Outline - Proposed Drainage Layout Sheet 5 - Rcd 06.10.2025
Drainage
Outline - Surface Water Drainage Calcs
Drainage
Potford Dam Link Surface Water Drainage Strategy Part 1 of 5 - Rcd 06.10.2025
Drainage
Potford Dam Link Surface Water Drainage Strategy Part 2 of 5 - Rcd 06.10.2025
Drainage
Potford Dam Link Surface Water Drainage Strategy Part 3 of 5 - Rcd 06.10.2025
Drainage
Potford Dam Link Surface Water Drainage Strategy Part 4 of 5 - Rcd 06.10.2025
Drainage
Potford Dam Link Surface Water Drainage Strategy Part 5 of 5 - Rcd 06.10.2025
Drainage
Potsford Dam Link - Channel Diversion Modelling Part 1 of 3 - Rcd 06.10.2025
Drainage
Potsford Dam Link - Channel Diversion Modelling Part 2 of 3 - Rcd 06.10.2025
Drainage
Potsford Dam Link - Channel Diversion Modelling Part 3 of 3 - Rcd 06.10.2025
Drainage
Preliminary Risk Assessment Report for Eastern Parcel Part 1 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Preliminary Risk Assessment Report for Eastern Parcel Part 2 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Preliminary Risk Assessment Report for Eastern Parcel Part 3 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Preliminary Risk Assessment Report Potford Dam Link Part 1 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Preliminary Risk Assessment Report Potford Dam Link Part 2 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Preliminary Risk Assessment Report Potford Dam Link Part 3 of 3 - Rcd 06.10.2025
Environmental Statement (part)
Redacted ES V2 Baseline Ecology Report Part 1 - Rcd 06.10.2025
Ecology Report
Road Safety Audit 1 - Rcd 11.11.2025
Highway plans/information
Road Safety Audit Brief - Rcd 17.11.2025
Highway plans/information
Road Safety Audit response, PDL - 28/11/25
Highway plans/information
Site waste management strategy Part 1 of 3 - Rcd 06.10.2025
Supplementary Report
Site waste management strategy Part 2 of 3 - Rcd 06.10.2025
Supplementary Report
Site waste management strategy Part 3 of 3 - Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 1 of 6 - Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 2 of 6 (Apdx 3-5) - Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 3 of 6 (Apdx 5 cont) - Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 4 of 6 (Apdx 5 cont)- Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 5 of 6 (Apdx 5 cont) - Rcd 06.10.2025
Supplementary Report
Statement of community involvement Part 6 of 6 (Apdx 5-7) - Rcd 06.10.2025
Supplementary Report
The location plan - Red and blue line - Rcd 06.10.2025
Site Location Plan
The location plan - Red line only - Rcd 06.10.2025
Site Location Plan
Transport Assessment Addendum 332612140-003 - Rcd 04.11.2025
Transport Report
Transport Assessment Addendum Appendix A - 14/11/25
Transport Report
Transport Assessment Addendum Appendix B - 14/11/25
Transport Report