← Back to Southwark
Status
Awaiting decision
Received
05 Dec 2024
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Demolition of the existing buildings on the site and the construction of a linked building with a tower housing purpose built student accommodation (Use Class Sui Generis), a shoulder element housing affordable residential housing (Class C3) both with basement level, and an industrial building including affordable workspace at the southern element of the Site (Classes B2, B8, E(g)(iii), and Sui Generis), alongside the delivery of a flexible Class E unit at ground floor level, and a mixed community cafe and PBSA co-working space (Class E/Sui Generis) at ground floor level on the corner of Ilderton Road and Surrey Canal Road, in addition to the delivery of hard and soft landscaping, pedestrian and vehicle access including the provision of a loading bay on Ilderton Road, cycle parking, blue badge car parking, wider public realm improvements including new public open space, with associated highway works and all other ancillary works associated with the development. For information: - The student housing tower element would be a part 23 and part 27 storey (max 89.5m AOD height), plus basement, element containing 477 purpose-built student accommodation rooms (Use Class Sui Generis), alongside communal student amenity space, student co-working space and associated ancillary spaces. - The affordable housing block would be a part 10, part 13 storey (max 51.7m AOD height) shoulder element, plus basement, containing 79 affordable homes (Class C3), comprising 58 social rented homes and 21 shared ownership intermediate homes. The ground floor would contain a 98.4sqm flexible e-class use, entrance lobby, bin stores and 6 Blue Badge parking spaces, together with associated amenity and ancillary spaces. - The industrial buildings proposed would consist of a part 1, part 2 and part 4 building (max 18.4m AOD height), containing 1,747sqm of industrial floorspace, including affordable workspace at the southern element of the Site (Classes B2, B8, E(g)(iii), and Sui Generis.
Documents
2 JULY 2025
Committee - Report
2 JULY 2025
Committee - Report
2B4P-WC FLOOR PLAN
Plan - General
3B5P-WC FLOOR PLAN
Plan - General
3B5P_A FLOOR PLAN
Plan - General
3B5P_B FLOOR PLAN
Plan - General
ADAPTATION DIAGRAMS (
Document
AFFORDABLE HOUSING STATEMENT
Affordable housing statement
AFFORDABLE WORKSPACE STRATEGY
Document
AIR QUALITY ASSESSMENT
Air quality assessment
APPLICATION FORM - WITHOUT PERSONAL DATA
Application - Form (Without Personal data)
ARBORICULTURAL IMPACT ASSESSMENT
Tree survey or Arboricultural implications
ARCHAEOLOGICAL DESK BASED ASSESSMENT
Archaeological Details
BASEMENT IMPACT ASSESSMENT
Basement Impact Assessment
BASEMENT IMPACT ASSESSMENT
Basement Impact Assessment
BASEMENT IMPACT ASSESSMENT
Basement Impact Assessment
BASEMENT IMPACT ASSESSMENT
Basement Impact Assessment
BASEMENT IMPACT ASSESSMENT
Basement Impact Assessment
BASEMENT PLAN
Plan - General
BASEMENT PLAN
Plan - General
BIODIVERSITY NET GAIN ASSESSMENT V2
Biodiversity BNG Metrics
BONAMY & BRAMCOTE TENANTS AND RESIDENTS ASSOCIATION
Statutory consultee replies
BUILDERS MERCHANT OCCUPANCY DEMAND
Document
CARBON EMISSION REPORTING SPREADSHEET
Document
CIRCULAR ECONOMY STATEMENT V1.1
Economic statement
CIRCULAR ECONOMY STATEMENT- STAGE 1
Circular Economy Statement
CIRCULAR ECONOMY WORKSHOP MINUTES.
Circular Economy Statement
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
CIL - GIA Form
CONSTRUCTION LOGISTICS PLAN
Document
COUNCILS RESPONSE
Viability report
COUNCILS RESPONSE APPENDIX 1
Viability report
COUNCILS RESPONSE APPENDIX 2
Viability report
COUNCILS RESPONSE APPENDIX 3
Viability report
COVERING LETTER
Application - Covering letter
DAYLIGHT CLARIFICATIONS
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
Daylight/Sunlight assessment
DELIVERY AND SERVICING AND OPERATIONAL WASTE PLAN
Service Management Plan
DEMAND AND MARKET ASSESSMENT
Document
DEMOLITION PLAN
Plan - Proposed
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DRAFT DEMOLITION / CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
Construction Environmental Management Plan CEMP
DRAWING REGISTER
Document
EAST ELEVATION
Plan - Proposed
EAST ELEVATION
Plan - General
ELECTROMAGNETIC INTERFERENCE ASSESSMENT V1.0
Document
ENERGY & OVERHEATING STRATEGY
Energy statement
ENERGY AND OVERHEATING REPORT
Energy statement
ENGAGEMENT SUMMARY TEMPLATE
Document
ENVIRONMENT AGENCY
Statutory consultee replies
EQUALITIES IMPACT ASSESSMENT
Development Consultation Charter
EXISITING PLAN
Plan - Existing
EXISTING ELEVATIONS
Plan - Existing
FIFTH STATE
Plan - General
FILE COPY - NEIGHBOUR NOTIFICATION+LIST
Neighbour Notification List
FINANCIAL VIABILITY ASSESSMENT
Viability report
FIRE STATEMENT REV B
Fire Statement
FLOOD RISK ASSESSMENT, DRAINAGE STRATEGY AND FOUL STRATEGY
Flood risk assessment
FLOOD RISK ASSESSMENT, DRAINAGE STRATEGY AND FOUL STRATEGY
Flood risk assessment
FLOOD RISK ASSESSMENT, DRAINAGE STRATEGY AND FOUL STRATEGY
Flood risk assessment
FLOOD RISK ASSESSMENT, DRAINAGE STRATEGY AND FOUL STRATEGY
Flood risk assessment
FLOOD RISK ASSESSMENT, DRAINAGE STRATEGY AND FOUL STRATEGY
Flood risk assessment
GATEWAY ONE FIRE STATEMENT
Fire Statement
GENERAL ARRANGEMENT GROUND FLOOR
Landscaping details
GENERAL ARRANGEMENT PODIUM AND ROOF TERRACE
Landscaping details
GHA-OVERHEATING-IN-NEW-HOMES-TOOL-AND-GUIDANCE-TOOL.
Document
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE
Circular Economy Statement
GLA CIRCULAR ECONOMY_STATEMENTS
Circular Economy Statement
GLA COMMENTS ON SUSTAINABLE DRAINAGE AND FLOOD RISK
Drainage strategy
GLA CONSULTATION (POST STAGE 1 SET 1) - ENERGY MEMO
Document
GLA CONSULTATION (STAGE 1) - ENERGY MEMO 2025
Document
GLA LCA REPORT IW.
Document
GLA STAGE 1 REPORT
Document
GLA STAGE 1 RESPONSE
Document
GLA_CIRCULAR ECONOMY STATEMENTS_TEMPLATE V1
Circular Economy Statement
GROUND FLOOR
Plan - General
GROUND FLOOR PLAN
Plan - General
GROUND FLOOR PLAN -TRANSPORT ANNEX
Plan - General
GROUND FLOOR PLAN.
Plan - General
HEALTH IMPACT ASSESSMENT
Document
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
Heritage statement
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
Heritage statement
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
Heritage statement
HSE
Statutory consultee replies
ILLUSTRATIVE MASTERPLAN
Landscaping details
ILLUSTRATIVE MASTERPLAN.
Plan - General
ITEM 9.1
Committee - Report
ITEM 9.1 APPENDICES 1 - 5
Committee - Report
LEVEL 01 FLOOR PLAN
Plan - General
LEVEL 01 FLOOR PLAN
Plan - General
LEVEL 02 FLOOR PLAN
Plan - General
LEVEL 03 FLOOR PLAN
Plan - General
LEVEL 04 FLOOR PLAN
Plan - General
LEVEL 26 FLOOR PLAN
Plan - General
LEVEL 26 FLOOR PLAN
Plan - General
LEVEL 27 ROOF
Plan - General
LEVEL 27 ROOF
Plan - General
LEVELS 05-10 FLOOR PLAN
Plan - General
LEVELS 11-13 FLOOR PLAN
Plan - General
LEVELS 14-22 FLOOR PLAN
Plan - General
LEVELS 14-22 FLOOR PLAN
Plan - General
LEVELS 23-25 FLOOR PLAN
Plan - General
LEVELS 23-25 FLOOR PLAN
Plan - General
LIFE CYCLE CARBON ASSESSMENT
Document
LONDON FIRE BRIGADE
Statutory consultee replies
LONDON UNDERGROUND
Statutory consultee replies
LV 28 LIFT MOTOR ROOM
Plan - General
MARCH 21/APRIL 30 SHOG RESULTS FOR ILDERTON WHARF
Plan - General
MET POLICE
Comment - Consultee
NATS
Statutory consultee replies
NOISE AND VIBRATION IMPACT ASSESSMENT REPORT
Noise impact assessment
NORTH & SOUTH ELEVATIONS
Plan - Proposed
NORTH AND SOUTH ELEVATION
Plan - General
PART_L_2021_GLA_CARBON_EMISSION_REPORTING_SPREADSHEET_V2.0_0
Document
PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENT
Document
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT AND GEOTECHNICAL RISK REGISTER
Ground investigation report
Plan - Proposed
Plan - Proposed
Plan - Proposed
Plan - Proposed
PLANNING SECURITY STRATEGY
Document
PLANNING STATEMENT
Planning statement
PLANTING STRATEGY
Document
PODIUM AND ROOFTOP TERRACE
Plan - General
PRE-REDEVELOPMENT AUDIT
Document
PRELIMINARY ECOLOGICAL APPRAISAL V2
Biodiversity survey / ecology assessment
PRESS NOTICE - 19/12/2024
Press Notice
REVISED ENERGY STATEMENT
Energy statement
REVISED OVERHEATING AND ENERGY STATEMENT REV 07
Energy statement
SCHEDULE OF ACCOMMODATION
Document
SCHEDULE OF ACCOMMODATION
Document
SECTION A-A
Plan - Proposed
SECTION B-B AND C-C
Plan - Proposed
SITE WASTE MANAGEMENT PLAN
Document
SOCIAL RENT INCREASE COVER LETTER
Document
SOCIO ECONOMIC STATEMENT
Economic statement
SOIL VOLUMES
Plan - General
STATEMENT OF COMMUNITY INVOLVEMENT
Statement of community involvement
STRUCTURAL STATEMENT
Structural survey
SUSTAINABILITY STATEMENT
Sustainability appraisal
TECHNICAL STRATEGIES & MATERIALS - URBAN GREENING FACTOR
Landscaping details
THAMES WATER
Statutory consultee replies
TIME EXTENSION LETTER
Time Extension - Request
TRANSPORT ASSESSMENT
Transport assessment
TRANSPORT ASSESSMENT
Transport assessment
TRANSPORT ASSESSMENT
Transport assessment
TRANSPORT ASSESSMENT
Transport assessment
TRANSPORT ASSESSMENT
Transport assessment
TRANSPORT ASSESSMENT ADDENDUM
Transport assessment
TREE AND PLANTING STRATEGY
Landscaping details
TREE AND PLANTING STRATEGY
Plan - General
UGF GROUND FLOOR
Landscaping details
UGF PODIUM AND ROOF TERRACE
Landscaping details
UTILITIES STATEMENT
Utilities statement
VALID APPLICATION LETTER WITH INVOICE
Valid Application Letter
VENTILATION AND EXTRACTION STATEMENT
Vent/extraction statement
WEST ELEVATION
Plan - Proposed
WHARF CE STATEMENT
Document
WHOLE LIFE CYCLE CARBON ASSESSMENT
Document
WHOLE LIFE-CYCLE CARBON (WLC) ASSESSMENT
Document
WLCA ASSESSMENT TEMPLATE
Document