← Thurrock Council

Status

Awaiting decision New housing
Received
16 Sep 2025
New homes
8

Summary

Construction of eight apartments with parking, EV bay, cycle storage and outdoor amenity space.

Full proposal

New eight residential apartments, distributed as two apartments per floor. The site layout includes eight car parking spaces, 1 Disabled Bay, 1 EV charging bay, eight covered cycle spaces, and a dedicated area for two recycling bin and one refuse bin. At the east side of the building, it opens onto a ground-floor patio, while to the east, a generous amenity space is provided for outdoor amenity space.

Documents

ANGLIAN WATER
Consultee Comment
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form
Not yet archived · Original link
BIODIVERSITY NET GAIN CALCULATION
Studies and Reports
Not yet archived · Original link
BLOCK AND LOCATION PLANS
Current Plan
Not yet archived · Original link
BNG REPORT
Studies and Reports
Not yet archived · Original link
CADENT GAS 1 OF 2
Consultee Comment
Not yet archived · Original link
CADENT GAS 2 OF 2
Consultee Comment
Not yet archived · Original link
DESIGN AND ACCESS STATEMENT
Studies and Reports
Not yet archived · Original link
ENVIRONMENTAL HEALTH
Consultee Comment
Not yet archived · Original link
EXISTING AND PROPOSED BLOCK PLANS
Current Plan
Not yet archived · Original link
FLOOD MAP REPORT
Studies and Reports
Not yet archived · Original link
LANDSCAPE AND ECOLOGY
Consultee Comment
Not yet archived · Original link
LISTED BUILDING/CONSERVATION
Consultee Comment
Not yet archived · Original link
LLFA
Consultee Comment
Not yet archived · Original link
PRELIMINARY ECOLOGICAL APPRAISAL
Studies and Reports
Not yet archived · Original link
PROPOSED 1ST AND 2ND FLOOR PLANS
Current Plan
Not yet archived · Original link
PROPOSED 3RD FLOOR PLANS
Current Plan
Not yet archived · Original link
PROPOSED EAST ELEVATIONS
Current Plan
Not yet archived · Original link
PROPOSED ELEVATIONS
Superseded Plan
Not yet archived · Original link
PROPOSED ELEVATIONS
Superseded Plan
Not yet archived · Original link
PROPOSED ELEVATIONS
Superseded Plan
Not yet archived · Original link
PROPOSED FRONT ELEVATION
Superseded Plan
Not yet archived · Original link
PROPOSED FRONT ELEVATIONS
Current Plan
Not yet archived · Original link
PROPOSED GROUND FLOOR
Current Plan
Not yet archived · Original link
Superseded Plan
Archived · Original link
Superseded Plan
Archived · Original link
Superseded Plan
Archived · Original link
Superseded Plan
Archived · Original link
PROPOSED REAR ELEVATION
Superseded Plan
Not yet archived · Original link
PROPOSED REAR ELEVATIONS
Current Plan
Not yet archived · Original link
PROPOSED ROOF
Current Plan
Not yet archived · Original link
PROPOSED STREET ELEVATIONS
Current Plan
Not yet archived · Original link
PROPOSED WESTELEVATIONS
Current Plan
Not yet archived · Original link
SUPPORTING DRAWINGS
Superseded Plan
Not yet archived · Original link
SUPPORTING DRAWINGS
Superseded Plan
Not yet archived · Original link
TECHNICAL NOTE
Studies and Reports
Not yet archived · Original link
TRANSPORT NOTE
Revised Drawing
Not yet archived · Original link
UTILITIES SEARCH REPORT
Studies and Reports
Not yet archived · Original link
WASTE STRATEGY DEPARTMENT
Consultee Comment
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment