← Back to Tower Hamlets
Status
Registered
Received
n/a
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Demolition of Albert Jacob House and redevelopment of the Site to provide a mixed-use development of 5 to 9 storeys comprising commercial (Use Class E) at ground floor level and 53 affordable residential units (Use Class C3) at ground and upper floor levels, together with associated landscaping works, relocation of a sub station, servicing and parking arrangements; Repaving of the adjoining highway area on Roman Road, north of Albert Jacob House; Relocation of vehicular gate on Bacton Street and provision of a new service bay; Demolition of redundant garages and pram sheds to the rear of Sleigh House and provision of a new communal garden and reconfiguration of existing parking bays; Re-designed play area to the green space fronting Godley VC House.
Documents
(NEIGHBURING PROPERTIES)
Daylight & Sunlight
(WITHIN DEVELOPMENT)
Daylight & Sunlight
1 OF 9
Design & Access Statement
2 OF 9
Design & Access Statement
3 OF 9
Design & Access Statement
4 OF 9
Design & Access Statement
5 OF 9
Design & Access Statement
6 OF 9
Design & Access Statement
7 OF 9
Design & Access Statement
8 OF 9
Design & Access Statement
9 OF 9
Design & Access Statement
AIR QUALITY ASSESSMENT
Report
AND DRAINAGE STRATEGY - PART 1 OF 2
Flood Risk Assessment
AND DRAINAGE STRATEGY - PART 2 OF 2
Flood Risk Assessment
AOV LOCATIONS
Current Plan
APPENDIX A - SHOPFRONT DESIGN GUIDE
Design & Access Statement
Application Form
Application Form
ARBORICULTURAL SURVEY
Report
BIODIVERSITY NET GAIN ASSESSMENT
Report
CADENT GAS PLANS
Current Plan
CALCULATION SURFACES
Current Plan
COVER LETTER
Correspondence
DESIGNING OUT CRIME GROUP
Consultee Comment
DESK STUDY GROUND INVESTIGATION - 1 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 2 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 3 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 4 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 5 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 6 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 7 OF 8
Report
DESK STUDY GROUND INVESTIGATION - 8 OF 8
Report
Drawing/Document Issue Register
Drawing/Document Issue Register
ESP UTILITIES GROUP - GAS PLAN
Current Plan
EXCAVATION LEAFLET
Correspondence
EXISTING FIRST & SECOND FLOOR PLAN
Current Plan
EXISTING FRONT & REAR ELEVATIONS
Current Plan
EXISTING GROUND FLOOR PLAN
Current Plan
EXISTING LIGHTING SURVEY
Current Plan
EXISTING SECTION A-A
Current Plan
EXISTING SECTION B-B
Current Plan
EXISTING SIDE ELEVATIONS
Current Plan
EXTERNAL REALM TO DIGBY ESTATE
Current Plan
EXTERNAL REALM TO DIGBY ESTATE
Current Plan
FIRE SAFETY STRATEGY
Report
FIRE STATEMENT FORM
Correspondence
FLAT TYPE 01 - M4(3) WHEELCHAIR USER
Current Plan
FLAT TYPE 08 - M4(3) WHEELCHAIR USER
Current Plan
GLA CARBON EMISSIONS
Correspondence
GUIDE TO EXCAVATION WITHIN THE VICINITY OF ZAYO APPARATUS
Correspondence
GUIDELINES WHEN WORKING IN VICINITY OF GAS APPARATUS
Correspondence
HEALTH & SAFETY RISK REGISTER
Correspondence
HEALTH IMPACT ASSESSMENT
Report
Heritage Statement
Heritage Statement
HSE'S SUBSTANTIVE RESPONSE
Consultee Comment
ISOLUX LIGHT LEVELS
Current Plan
LANDSCAPE STATEMENT - PART 1
Report
LANDSCAPE STATEMENT - PART 2
Report
LIGHTING LUX LEVEL REPORT
Report
LONDON PLAN FIRE STATEMENT
Report
LONDON SYMBOL GUIDES
Correspondence
MEP LAYOUT - FLAT TYPE - PART 1
Current Plan
MEP LAYOUT - FLAT TYPE - PART 2
Current Plan
MEP LAYOUT - FLAT TYPE - PART 3
Current Plan
MEP LAYOUT-CORRIDOR
Current Plan
OUTLINE CONSTRUCTION MANAGEMENT PLAN
Report
PLANNING NOISE ASSESSMENT
Report
Planning Statement
Planning Statement
PLANT INFO MAP
Current Plan
PLANT INFO MAP 2
Current Plan
PLANTING PLAN
Current Plan
PRELIMINARY ECOLOGICAL APPRAISAL
Report
PROPOSED AREA SCHEDULE
Correspondence
PROPOSED EAST ELEVATION
Current Plan
PROPOSED FRONT ELEVATION
Current Plan
PROPOSED GA PLAN - LEVEL 00
Current Plan
PROPOSED GA PLAN - LEVEL 01
Current Plan
PROPOSED GA PLAN - LEVEL 02 & 04
Current Plan
PROPOSED GA PLAN - LEVEL 03
Current Plan
PROPOSED GA PLAN - LEVEL 05
Current Plan
PROPOSED GA PLAN - LEVEL 06 - 07
Current Plan
PROPOSED GA PLAN - LEVEL 08
Current Plan
PROPOSED GA PLAN - ROOF PLAN
Current Plan
PROPOSED GROUND FOOR REFUSE COLLECTION STRATEGY
Current Plan
PROPOSED LEVEL 01 - 04 - REFUSE COLLECTION STRATEGY
Current Plan
PROPOSED LEVEL 05 - REFUSE COLLECTION STRATEGY
Current Plan
PROPOSED LEVEL 06 - 07 REFUSE STRATEGY
Current Plan
PROPOSED LEVEL 08 - REFUSE COLLECTION STRATEGY
Current Plan
PROPOSED PLANT ROOM LAYOUT
Current Plan
PROPOSED REAR ELEVATION
Current Plan
PROPOSED SECTION A-A
Current Plan
PROPOSED SECTIONS B-B & C-C
Current Plan
PROPOSED WEST ELEVATION
Current Plan
REUSE RECYCLE & WASTE PLAN SUMMARY
Correspondence
RIBA STAGE 3 MECHANICAL AND ELECTRICAL SERVICES
Report
SHEETS 1 TO 3
Current Plan
TOWNSCAPE & VISUAL IMPACT APPRAISAL
Report
Transport Statement
Transport Statement
TRAVEL PLAN STATEMENT
Report
UKPN CUSTOMER LETTER
Correspondence