New homes
0
Full proposal
Proposed works at Oast Courts involve the renewal of the main flat roofs, lower roofs, walkways, and balconies. Where necessary, thermal insulation will be upgraded to meet current standards. Rainwater drainage will be improved by increasing the number and size of outlets across all roof levels and balconies, and emergency overflow provisions will be installed to enhance resilience. Additionally, steel capping sheets will be fitted to the parapet walls of the main roof to improve durability and weather protection.
Documents
LIQUITEC BALCONY - WALKWAY - LIQUIBALKON SYSTEM SPECIFICATION SUMMARY
Correspondence
Not yet archived
· Original link
LIQUITECH BALCONY-WALKWAY - LIQUIBALKON SYSTEM SPECIFICATION SUMMARY
Correspondence
Not yet archived
· Original link
LIQUITECH ROOF-TERRACE - LIQUIDEK SYSTEM SPECIFICATION SUMMARY
Correspondence
Not yet archived
· Original link
R10-370 DALES CONTEMPORARY 101.6 DIA ANODISED ALUMINIUM RWP
Correspondence
Not yet archived
· Original link
R10-370 DALES CONTEMPORARY 101.6 DIA PPC ALUMINIUM RWP
Correspondence
Not yet archived
· Original link
SPECIFICATION SUMMARY - EXISTING STRUCTURAL CONCRETE DECK WARM ROOF
Correspondence
Not yet archived
· Original link
SPECIFICATION SUMMARY - OVERLAY EXISTING ASPHALT WATERPROOFING SYSTEM WARM ROOF
Correspondence
Not yet archived
· Original link
SPECIFICATION SUMMARY - OVERLAY EXISTING FELT WATERPROOFING SYSTEM UNISULATED ROOF
Correspondence
Not yet archived
· Original link