← Back to Tower Hamlets
Status
Registered
Received
n/a
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Phased redevelopment of the site comprising demolition of all existing buildings (save for 46-48a Ashfield Street); and development including 6 new buildings ranging between 5 and 22 storeys in height, comprising up to 111 x residential dwellings (Use Class C3), up to 167 x specialist accommodation units (Use Class C2), up to 230 x co-living units (Sui Generis), up to 21,961 sqm GEA of flexible office / life sciences / hospital floorspace (Use class E(g)/ E(e))), up to 30,433 sqm GEA of flexible hospital floorspace (Use Class E(e)), up to 1,911 sqm GEA of business floorspace (Use Class E), up to 1,882 sqm GEA of flexible community engagement, sport and leisure floorspace (Use Class F1/F2/E(d)/Sui Generis), up to 440 sqm GEA of flexible retail / food and beverage floorspace (Use Class F/E(a)/E(b)); change of use from office to residential (Use Class C3) and refurbishment of 46-48a Ashfield Street; extension to 46 Ashfield Street; refurbishment of 80a Ashfield Street; car parking, hard and soft landscaping and other necessary associated works [This application is accompanied by an Environmental Statement]
Documents
Application Form
Application Form
ARBORICULTURAL IMPACT ASSESSMENT AND TREE SURVEY
Report
AVIATION SAFEGUARDING ASSESSMENT
Report
BIODIVERSITY NET GAIN ASSESSMENT
Report
BUILDING A PLANS
Current Plan
BUILDING B - ELEVATIONS
Current Plan
BUILDING B - PLANS
Current Plan
BUILDING B - SECTIONS
Current Plan
BUILDING B - UNIT LAYOUTS
Current Plan
BUILDING C PLANS
Current Plan
BUILDING D2 PLANS
Current Plan
BUILDING E PLANS
Current Plan
BUILDING MANAGEMENT PLANS
Report
CIRCULAR ECONOMY STATEMENT - PART 1
Report
CIRCULAR ECONOMY STATEMENT - PART 2
Report
CIRCULAR ECONOMY STATEMENT - PART 3
Report
CIRCULAR ECONOMY STATEMENT - PART 4
Report
CIRCULAR ECONOMY STATEMENT - PART 5
Report
COMMERCIAL FRAMEWORK TRAVEL PLAN
Report
COMMERCIAL REUSE RECYCLING AND WASTE PLAN
Report
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 1
Report
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 2
Report
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 3
Report
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - PART 4
Report
CONTAMINATED LAND ASSESSMENT - PART 1
Report
CONTAMINATED LAND ASSESSMENT - PART 2
Report
CONTAMINATED LAND ASSESSMENT - PART 3
Report
CONTAMINATED LAND ASSESSMENT - PART 4
Report
CONTAMINATED LAND ASSESSMENT - PART 5
Report
CONTAMINATED LAND ASSESSMENT - PART 6
Report
CONTAMINATED LAND ASSESSMENT - PART 7
Report
CONTAMINATED LAND ASSESSMENT - PART 8
Report
CONTAMINATED LAND ASSESSMENT - PART 9
Report
COVER LETTER
Correspondence
DELIVERY AND SERVICING MANAGEMENT PLAN - PART 1
Report
DELIVERY AND SERVICING MANAGEMENT PLAN - PART 2
Report
DELIVERY AND SERVICING MANAGEMENT PLAN - PART 3
Report
DELIVERY AND SERVICING MANAGEMENT PLAN - PART 4
Report
DELIVERY AND SERVICING MANAGEMENT PLAN - PART 5
Report
DRAINAGE STRATEGY - PART 1
Report
DRAINAGE STRATEGY - PART 2
Report
DRAINAGE STRATEGY - PART 3
Report
DRAINAGE STRATEGY - PART 4
Report
DRAINAGE STRATEGY - PART 5
Report
DRAINAGE STRATEGY - PART 6
Report
DRAINAGE STRATEGY - PART 7
Report
Drawing/Document Issue Register
Drawing/Document Issue Register
ECOLOGICAL IMPACT ASSESSMENT
Report
ENERGY AND SUSTAINABILITY STATEMENT AND OVERHEATING MITIGATION - PART 1
Report
ENERGY AND SUSTAINABILITY STATEMENT AND OVERHEATING MITIGATION - PART 2
Report
ENERGY AND SUSTAINABILITY STATEMENT AND OVERHEATING MITIGATION - PART 3
Report
ENERGY AND SUSTAINABILITY STATEMENT AND OVERHEATING MITIGATION - PART 4
Report
EXISTING FLOOR PLANS - BUILDING E
Current Plan
EXISTING GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET)
Current Plan
EXISTING NORTH SOUTH AND EAST ELEVATIONS - BUILDING E
Current Plan
EXISTING SECTIONS - BUILDING E
Current Plan
EXISTING SECTIONS - F BUILDING (80A ASHFIELD ST)
Current Plan
FINANCIAL VIABILITY ASSESSMENT
Report
FLUE AND VENTILATION EXHAUST LOCATIONS
Current Plan
GAIN OF RESIDENTIAL
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING A
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING B
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING C
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D1
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING D2
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G
Correspondence
GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE - BUILDING G
Correspondence
GLA WLCA TEMPLATE - BUILDING A
Correspondence
GLA WLCA TEMPLATE - BUILDING A
Report
GLA WLCA TEMPLATE - BUILDING B
Report
GLA WLCA TEMPLATE - BUILDING B
Correspondence
GLA WLCA TEMPLATE - BUILDING C
Report
GLA WLCA TEMPLATE - BUILDING C
Correspondence
GLA WLCA TEMPLATE - BUILDING D1
Correspondence
GLA WLCA TEMPLATE - BUILDING D1
Report
GLA WLCA TEMPLATE - BUILDING D2
Correspondence
GLA WLCA TEMPLATE - BUILDING D2
Report
GLA WLCA TEMPLATE - BUILDING G
Correspondence
GLA WLCA TEMPLATE - BUILDING G
Report
HEALTH IMPACT ASSESSMENT
Report
HELIPAD WIND IMPACT TECHNICAL NOTE
Report
HSE - NO INTEREST
Consultee Comment
ILLUSTRATIVE HARD LANDSCAPE MASTERPLAN
Current Plan
ILLUSTRATIVE LANDSCAPE MASTERPLAN - COMBINED
Current Plan
ILLUSTRATIVE LANDSCAPE MASTERPLAN - GROUND LEVEL
Current Plan
ILLUSTRATIVE LANDSCAPE MASTERPLAN - ROOF TERRACES
Current Plan
ILLUSTRATIVE SOFT LANDSCAPE MASTERPLAN
Current Plan
INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 1
Daylight & Sunlight
INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 2
Daylight & Sunlight
INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 3
Daylight & Sunlight
INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 4
Daylight & Sunlight
INTERNAL DAYLIGHT SUNLIGHT ASSESSMENT - PART 5
Daylight & Sunlight
LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST
Correspondence
LONDON PLAN AND GATEWAY 1 FIRE STATEMENTS
Report
LOSS OF RESIDENTIAL
Correspondence
NO-TECHNICAL SUMMARY - PART 1
Environmental Statement
NO-TECHNICAL SUMMARY - PART 2
Environmental Statement
NO-TECHNICAL SUMMARY - PART 3
Environmental Statement
PART 1
Flood Risk Assessment
PART 1
Design & Access Statement
PART 1
Transport Statement
PART 10
Design & Access Statement
PART 11
Design & Access Statement
PART 12
Design & Access Statement
PART 13
Design & Access Statement
PART 14
Design & Access Statement
PART 15
Design & Access Statement
PART 16
Design & Access Statement
PART 17
Design & Access Statement
PART 18
Design & Access Statement
PART 19
Design & Access Statement
PART 2
Flood Risk Assessment
PART 2
Design & Access Statement
PART 2
Transport Statement
PART 20
Design & Access Statement
PART 21
Design & Access Statement
PART 3
Design & Access Statement
PART 3
Flood Risk Assessment
PART 3
Transport Statement
PART 4
Design & Access Statement
PART 4
Transport Statement
PART 5
Transport Statement
PART 5
Design & Access Statement
PART 6
Transport Statement
PART 6
Design & Access Statement
PART 7
Transport Statement
PART 7
Design & Access Statement
PART 8
Design & Access Statement
PART 9
Design & Access Statement
Planning Statement
Planning Statement
PROPOSED ACCESSIBLE UNITS (A AND B) - B BUILDING
Current Plan
PROPOSED ACCESSIBLE UNITS (CANDD) - B BUILDING
Current Plan
PROPOSED ACCESSIBLE UNITS (CANDD) - D1 BUILDING
Current Plan
PROPOSED BASEMENT B1 FLOOR PLAN - BUILDING B
Current Plan
PROPOSED BASEMENT B1 FLOOR PLAN - D1 BUILDING
Current Plan
PROPOSED BASEMENT B1 FLOOR PLAN - G BUILDING
Current Plan
PROPOSED BASEMENT B1 MEZZANINE FLOOR PLAN - G BUILDING
Current Plan
PROPOSED BASEMENT PLAN - D2 BUILDING
Current Plan
PROPOSED DEMOLITION PLANS - E BUILDING
Current Plan
PROPOSED EAST ELEVATION - A BUILDING
Current Plan
PROPOSED EAST ELEVATION - B BUILDING
Current Plan
PROPOSED EAST ELEVATION - C BUILDING
Current Plan
PROPOSED EAST ELEVATION - D1 BUILDING
Current Plan
PROPOSED EAST ELEVATION - D2 BUILDING
Current Plan
PROPOSED EAST ELEVATION - G BUILDING
Current Plan
PROPOSED FLOOR 00 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - A BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - D2 BUILDING
Current Plan
PROPOSED FLOOR 01 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - A BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - D2 BUILDING
Current Plan
PROPOSED FLOOR 02 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - A BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - D2 BUILDING
Current Plan
PROPOSED FLOOR 03 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - A BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - D2 BUILDING
Current Plan
PROPOSED FLOOR 04 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 05 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 05 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 05 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 05 PLAN - D2 BUILDING
Current Plan
PROPOSED FLOOR 05 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 06 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 06 PLAN - C BUILDING
Current Plan
PROPOSED FLOOR 06 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 06 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 07 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 07 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR 07 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 08 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 08 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 09 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 09 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 10 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 10 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 11 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 11 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 12 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 12 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 13 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 13 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 14 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 14 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 15 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 15 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 16 PLAN - B BUILDING
Current Plan
PROPOSED FLOOR 16 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 17 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 18 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 19 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 20 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR 21 PLAN - G BUILDING
Current Plan
PROPOSED FLOOR L08 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L09 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L10 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L11 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L12 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L13 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L14 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L15 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L16 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR L17 PLAN - D1 BUILDING
Current Plan
PROPOSED FLOOR ROOF PLAN - D1 BUILDING
Current Plan
PROPOSED GROUND FLOOR FLOOR 01 AND ROOF PLAN - F BUILDING (80A ASHFIELD STREET)
Current Plan
PROPOSED GROUND FLOOR PLAN - A BUILDING
Current Plan
PROPOSED GROUND FLOOR PLAN - C BUILDING
Current Plan
PROPOSED GROUND FLOOR PLAN - D1 BUILDING
Current Plan
PROPOSED GROUND FLOOR PLAN - D2 BUILDING
Current Plan
PROPOSED GROUND FLOOR PLAN - G BUILDING
Current Plan
PROPOSED LOWER GROUND FLOOR PLAN - A BUILDING
Current Plan
PROPOSED LOWER GROUND FLOOR PLAN - C BUILDING
Current Plan
PROPOSED LOWER GROUND TO THIRD FLOOR - E BUILDING
Current Plan
PROPOSED NORTH ELEVATION - A BUILDING
Current Plan
PROPOSED NORTH ELEVATION - B BUILDING
Current Plan
PROPOSED NORTH ELEVATION - C BUILDING
Current Plan
PROPOSED NORTH ELEVATION - D1 BUILDING
Current Plan
PROPOSED NORTH ELEVATION - D2 BUILDING
Current Plan
PROPOSED NORTH ELEVATION - G BUILDING
Current Plan
PROPOSED NORTH SOUTH AND EAST ELEVATIONS - E BUILDING
Current Plan
PROPOSED ROOF PLAN - A BUILDING
Current Plan
PROPOSED ROOF PLAN - B BUILDING
Current Plan
PROPOSED ROOF PLAN - C BUILDING
Current Plan
PROPOSED ROOF PLAN - D2 BUILDING
Current Plan
PROPOSED ROOF PLAN - G BUILDING
Current Plan
PROPOSED SECTION AA - B BUILDING
Current Plan
PROPOSED SECTION BB - B BUILDING
Current Plan
PROPOSED SECTION CC - B BUILDING
Current Plan
PROPOSED SECTION CC - E BUILDING
Current Plan
PROPOSED SECTIONS - D1 BUILDING
Current Plan
PROPOSED SECTIONS - D1 BUILDING
Current Plan
PROPOSED SECTIONS - D1 BUILDING
Current Plan
PROPOSED SECTIONS - D1 BUILDING
Current Plan
PROPOSED SECTIONS - F BUILDING (80A ASHFIELD ST)
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS - G BUILDING
Current Plan
PROPOSED SECTIONS AA - A BUILDING
Current Plan
PROPOSED SECTIONS AA - C BUILDING
Current Plan
PROPOSED SECTIONS AA BB - D2 BUILDING
Current Plan
PROPOSED SECTIONS AA BB - E BUILDING
Current Plan
PROPOSED SECTIONS BB - A BUILDING
Current Plan
PROPOSED SECTIONS BB - C BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - A BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - B BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - C BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - D1 BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - D2 BUILDING
Current Plan
PROPOSED SOUTH ELEVATION - G BUILDING
Current Plan
PROPOSED TYPICAL UNITS (AANDB) - D1 BUILDING
Current Plan
PROPOSED TYPICAL UNITS - B BUILDING
Current Plan
PROPOSED UNIT A-1B1P-01 - A BUILDING
Current Plan
PROPOSED UNIT A-1B1P-02 - A BUILDING
Current Plan
PROPOSED UNIT A-1B1P-03 - A BUILDING
Current Plan
PROPOSED UNIT A-1B1P-04 - A BUILDING
Current Plan
PROPOSED UNIT A-1B1P-05 - A BUILDING
Current Plan
PROPOSED UNIT A-1B1P-06 - A BUILDING
Current Plan
PROPOSED UNIT A-1B2P-M4(3)-01 - A BUILDING
Current Plan
PROPOSED UNIT A-1B2P-M4(3)-02 - A BUILDING
Current Plan
PROPOSED UNIT C-1B2P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-1B2P-02 - C BUILDING
Current Plan
PROPOSED UNIT C-1B2P-03 - C BUILDING
Current Plan
PROPOSED UNIT C-1B2P-M4(3)-01 - C BUILDING
Current Plan
PROPOSED UNIT C-1B2P-M4(3)-02 - C BUILDING
Current Plan
PROPOSED UNIT C-2B3P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-2B3P-02 - C BUILDING
Current Plan
PROPOSED UNIT C-2B3P-DUP-01 - C BUILDING
Current Plan
PROPOSED UNIT C-2B3P-DUP-02 - C BUILDING
Current Plan
PROPOSED UNIT C-2B4P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-3B4P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-3B5P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-3B5P-02 - C BUILDING
Current Plan
PROPOSED UNIT C-3B5P-DUP-01 - C BUILDING
Current Plan
PROPOSED UNIT C-3B5P-DUP-02 - C BUILDING
Current Plan
PROPOSED UNIT C-4B6P-01 - C BUILDING
Current Plan
PROPOSED UNIT C-4B6P-02 - C BUILDING
Current Plan
PROPOSED UNIT D2-1B1P-01 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B1P-02 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B1P-03 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B1P-04 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B2P- M4(3)-01 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B2P- M4(3)-02 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B2P- M4(3)-03 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B2P- M4(3)-04 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-1B2P-05 - D2 BUILDING
Current Plan
PROPOSED UNIT D2-2B4P-02 - D2 BUILDING
Current Plan
PROPOSED UNIT E-1B1P-01 - E BUILDING
Current Plan
PROPOSED UNIT E-1B2P-02 - E BUILDING
Current Plan
PROPOSED UNIT E-2B3P-01 - E BUILDING
Current Plan
PROPOSED WEST ELEVATION - B BUILDING
Current Plan
PROPOSED WEST ELEVATION - B BUILDING
Current Plan
PROPOSED WEST ELEVATION - C BUILDING
Current Plan
PROPOSED WEST ELEVATION - D1 BUILDING
Current Plan
PROPOSED WEST ELEVATION - D2 BUILDING
Current Plan
PROPOSED WEST ELEVATION - G BUILDING
Current Plan
RESIDENTIAL FRAMEWORK TRAVEL PLAN
Report
RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 1
Report
RESIDENTIAL REUSE RECYCLING AND WASTE PLAN - PART 2
Report
SITE ELEVATION - EAST - DEMOLITION
Current Plan
SITE ELEVATION - NORTH - DEMOLITION
Current Plan
SITE ELEVATION - SOUTH - DEMOLITION
Current Plan
SITE ELEVATION - WEST - DEMOLITION
Current Plan
SITEWIDE GLA CARBON EMISSION SPREADSHEET
Report
SITEWIDE GLA CARBON EMISSION SPREADSHEET DECEMBER 2025
Correspondence
STATEMENT OF COMMUNITY INVOLVEMENT
Report
THE STATUTORY BIODIVERSITY METRIC CALCULATION TOOL DECEMBER 2025
Correspondence
URBAN GREENING STATEMENT
Current Plan
UTILITIES ASSESSMENT
Report
VOLUME 1 CH 01 INTRODUCTION PART 1
Environmental Statement
VOLUME 1 CH 01 INTRODUCTION PART 2
Environmental Statement
VOLUME 1 CH 02A EIA SCOPE
Environmental Statement
VOLUME 1 CH 02B EIA METHODOLOGY
Environmental Statement
VOLUME 1 CH 03 ALTERNATIVES
Environmental Statement
VOLUME 1 CH 04 PROPOSED DEVELOPMENT
Environmental Statement
VOLUME 1 CH 05 DEMOLITION, CONSTRUCTION & REFURBISHMENT
Environmental Statement
VOLUME 1 CH 06 SOCIO- ECONOMICS
Environmental Statement
VOLUME 1 CH 07 AIR QUALITY
Environmental Statement
VOLUME 1 CH 08 NOISE AND VIBRATION
Environmental Statement
VOLUME 1 CH 09 DSO
Environmental Statement
VOLUME 1 CH 10 WIND
Environmental Statement
VOLUME 1 CH 11 ARCHAEOLOGY
Environmental Statement
VOLUME 1 CH 12 CLIMATE CHANGE
Environmental Statement
VOLUME 1 CH 13 HUMAN HEALTH
Environmental Statement
VOLUME 1 CH 14 TRAFFIC
Environmental Statement
VOLUME 1 CH 15 EFFECT INTERACTIONS
Environmental Statement
VOLUME 1 CH 16 LIKELY SIGNIFICANT EFFECTS
Environmental Statement
VOLUME 1 CH 17 MITIGATION MONITORING
Environmental Statement
VOLUME 2 HTVIA PART 1
Environmental Statement
VOLUME 2 HTVIA PART 10
Environmental Statement
VOLUME 2 HTVIA PART 11
Environmental Statement
VOLUME 2 HTVIA PART 12
Environmental Statement
VOLUME 2 HTVIA PART 2
Environmental Statement
VOLUME 2 HTVIA PART 3
Environmental Statement
VOLUME 2 HTVIA PART 4
Environmental Statement
VOLUME 2 HTVIA PART 5
Environmental Statement
VOLUME 2 HTVIA PART 6
Environmental Statement
VOLUME 2 HTVIA PART 7
Environmental Statement
VOLUME 2 HTVIA PART 8
Environmental Statement
VOLUME 2 HTVIA PART 9
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 3
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 4
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 5
Environmental Statement
VOLUME 3 APPENDIX AIR QUALITY ANNEX 6
Environmental Statement
VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 1
Environmental Statement
VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 2
Environmental Statement
VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 1 PART 3
Environmental Statement
VOLUME 3 APPENDIX ARCHAEOLOGY ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 3
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 4
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 5
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 6
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 7
Environmental Statement
VOLUME 3 APPENDIX CLIMATE CHANGE ANNEX 8
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 10
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 3 PART 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 3 PART 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 3 PART 3
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 3 PART 4
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 4 PART 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 4 PART 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 4 PART 3
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 4 PART 4
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 10
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 11
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 12
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 13
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 14
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 15
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 16
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 3
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 4
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 5
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 6
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 7
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 8
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 5 PART 9
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 6 PART 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 6 PART 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 6 PART 3
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 6 PART 4
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 6 PART 5
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 1
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 2
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 3
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 4
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 5
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 6
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 7 PART 7
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 8
Environmental Statement
VOLUME 3 APPENDIX DSO ANNEX 9
Environmental Statement
VOLUME 3 APPENDIX EIA METHODOLOGY ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX HEALTH ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 1
Environmental Statement
VOLUME 3 APPENDIX INTRODUCTION ANNEX 1 PART 2
Environmental Statement
VOLUME 3 APPENDIX INTRODUCTION ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX INTRODUCTION ANNEX 3
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 3
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 4
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 5
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 1
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 2
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 3
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 4
Environmental Statement
VOLUME 3 APPENDIX NOISE AND VIBRATION ANNEX 6 PART 5
Environmental Statement
VOLUME 3 APPENDIX SOCIO-ECONOMICS ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX WIND ANNEX 1
Environmental Statement
VOLUME 3 APPENDIX WIND ANNEX 2
Environmental Statement
VOLUME 3 APPENDIX WIND ANNEX 3
Environmental Statement
WHOLE LIFE CARBON ASSESSMENT
Report