← Back to Warwick District Council
Status
Registered
Received
19 Nov 2025
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Proposal for up to 750 residential units with school, store, hall and infrastructure.
Full Proposal
Outline planning application for the erection of up to 750 dwellings (Class C3 Use) with vehicular and non-vehicular access from A425 Banbury Road, a primary school (Class F1 Use), a convenience store (<500sqm) (Class E Use), a community hall (Class F2 Use), alongside public open space, sustainable drainage and associated infrastructure works. All matters reserved except for access from A425 Banbury Road.
Reasonable Objection Grounds
These are planning grounds where objections may be reasonable for this
application:
Traffic
Scale
Amenity
Likely Support Reasons
These are potential reasons to support this application based on the
proposal:
Housing Need
Brownfield
Density
Sustainability
Documents
ACCESS AND MOVEMENT PARAMETER PLAN
Drawing
APPLICATION FORM REDACTED
Application Form
BIOREGIONAL RESPONSE
Consultation Response
BIOREGIONAL RESPONSE - SPREADSHEET
Consultation Response
BISHOPS TACHBROOK PARISH COUNCIL
Consultation Response
CLLR Andrew Day-Objects-15A Savages Cl Bishop's Tachbrook Leamington Spa(FULL)
Objection Comment
DESIGN AND ACCESS STATEMENT
Supporting Report
DRAFT S106 HEADS OF TERMS
Supporting Report
ENERGY STATEMENT
Supporting Report
Environment Agency
Consultation Response
ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARY V2
Supporting Report
ES APPENDIX 1.1 LOCATION PLAN
Site Location Plan
ES APPENDIX 1.3 DOCUMENT SCHEDULE
Supporting Report
ES APPENDIX 1.4 COMPETENT PERSONS SUMMARY FOR ES
Supporting Report
ES APPENDIX 10.1 BUILT HERITAGE STATEMENT
Supporting Report
ES APPENDIX 12.1 FLOOD RISK ASSESSMENT
Supporting Report
ES APPENDIX 12.2 OUTLINE DRAINAGE STRATEGY APPENDICES 1
Supporting Report
ES APPENDIX 12.2 OUTLINE DRAINAGE STRATEGYAPPENDICES 2
Supporting Report
ES APPENDIX 13.1 PHASE 1 AND 2 GEO-ENVIRONMENTAL AND GEOTECHNICAL SI 1
Supporting Report
ES APPENDIX 13.1 PHASE 1 AND 2 GEO-ENVIRONMENTAL AND GEOTECHNICAL SI 2 2
Supporting Report
ES APPENDIX 13.2 MINERAL RESOURCE ASSESSMENT
Supporting Report
ES APPENDIX 13.3 AGRICULTURAL LAND CLASSIFICATION AND CONSIDERATIONS
Supporting Report
ES APPENDIX 15.1 GLOSSARY
Supporting Report
ES APPENDIX 15.2 LEGISLATION POLICY GUIDANCE
Supporting Report
ES APPENDIX 15.3 CONSTRUCTION DUST RISK ASSESSMENT
Supporting Report
ES APPENDIX 15.4 TRAFFIC DATA
Supporting Report
ES APPENDIX 15.5 MODEL INPUTS AND VERIFICATION
Supporting Report
ES APPENDIX 15.6 MODEL RESULTS
Supporting Report
ES APPENDIX 15.7 DAMAGE COST CALCULATIONS
Supporting Report
ES APPENDIX 15.8 FIGURES
Supporting Report
ES APPENDIX 6.1 LANDSCAPE & VISUAL IMPACT ASSESSMENT
Supporting Report
ES APPENDIX 6.1 LVIA APPENDIX A FIGURES 1 TO 9
Supporting Report
ES APPENDIX 6.1 LVIA APPENDIX A FIGURES 10 TO 14
Supporting Report
ES APPENDIX 6.1 LVIA APPENDIX A FIGURES 15 TO 19
Supporting Report
ES APPENDIX 6.2 - TREE SURVEY BEA-24-064-TGW-TR001
Supporting Report
ES APPENDIX 7.1 NOISE IMPACT ASSESSMENT
Supporting Report
ES APPENDIX 7.2 GLOSSARY OF ACOUSTIC TERMINOLOGY
Supporting Report
ES APPENDIX 7.3 NOISE MEASUREMENT RESULTS
Supporting Report
ES APPENDIX 7.4 ASSUMPTIONS USED IN THE ASSESSMENT OF CONSTRUCTION IMPACTS
Supporting Report
ES Appendix 8.1 Statutory Biodiversity Metric
Supporting Report
ES APPENDIX 8.2 ECOLOGICAL ASSESSMENTS
Supporting Report
ES APPENDIX 9.1 ARCHAEOLOGICAL DESK-BASED ASSESSMENT
Supporting Report
ES CHAPTER 1 - INTRODUCTION
Supporting Report
ES CHAPTER 10 - HERITAGE
Supporting Report
ES CHAPTER 11 - TRANSPORT
Supporting Report
ES CHAPTER 12 - FLOOD RISK
Supporting Report
ES CHAPTER 13 - GROUND CONDITIONS AND CONTAMINATION
Supporting Report
ES CHAPTER 14 - SOCIO-ECONOMIC AND HUMAN HEALTH
Supporting Report
ES CHAPTER 14 FIGURE 14.1 IMPACT AREA MAP
Supporting Report
ES CHAPTER 15 - AIR QUALITY
Supporting Report
ES CHAPTER 16 - WASTE
Supporting Report
ES CHAPTER 17 - CLIMATE CHANGE
Supporting Report
ES CHAPTER 18 - CUMULATIVE EFFECTS
Supporting Report
ES CHAPTER 19 - SUMMARY OF MITIGATION AND RESIDUAL EFFECTS
Supporting Report
ES CHAPTER 2 - SITE AND SURROUNDINGS
Supporting Report
ES CHAPTER 20 - GLOSSARY
Supporting Report
ES CHAPTER 3 - PROPOSED DEVELOPMENT AND REASONABLE ALTERNATIVES
Supporting Report
ES CHAPTER 3 FIGURE 3.1 ILLUSTRATIVE MASTERPLAN
Drawing
ES CHAPTER 4 - APPROACH TO THE ENVIRONMENTAL STATEMENT
Supporting Report
ES CHAPTER 5 - PLANNING POLICY
Supporting Report
ES CHAPTER 6 - LANDSCAPE & VISUAL AMENITY
Supporting Report
ES CHAPTER 6 FIGURES 1 TO 9 (APPENDIX A TO LVIA)
Supporting Report
ES CHAPTER 6 FIGURES 9 TO 19 (APPENDIX A TO LVIA)
Supporting Report
ES CHAPTER 7 - NOISE AND VIBRATION
Supporting Report
ES CHAPTER 8 - ECOLOGY AND NATURE CONSERVATION
Supporting Report
ES CHAPTER 8 FIGURE 8.1
Supporting Report
ES CHAPTER 8 FIGURE 8.2
Supporting Report
ES CHAPTER 9 - ARCHAEOLOGY
Supporting Report
ES VOLUME 1 FRONT COVER AND MASTER CONTENTS
Supporting Report
FORM 1 - ADDITIONAL INFORMATION
CIL Form
Gardens Trust
Consultation Response
Historic England
Consultation Response
HOUSING MIX AND AFFORDABLE HOUSING STATEMENT V1
Supporting Report
Housing Strategy & Enabling Officer
Consultation Response
ILLUSTRATIVE MASTERPLAN
Drawing
LAND USE PARAMETER PLAN
Drawing
LANDSCAPE AND OPEN SPACE PARAMETER PLAN
Drawing
LOCATION PLAN
Site Location Plan
Maria Lara-Objects-35 Brooklime Road Warwick(FULL)
Objection Comment
MARKED NEIGHBOURS
Neighbours Notified
Miss Alina Cojocaru-Objects-14 Sunde drive Warwick(FULL)
Objection Comment
Miss Celia Whitehouse -Objects-2 Driver Close Bishop's Tachbrook Leamington Spa(
Objection Comment
Miss Elinor Jaycock-Objects-7 Teasel Drive Warwick(FULL)
Objection Comment
Mr Adrian Franklin-Objects-16 Penfold Close Bishops Tachbrook Leamington Spa(FUL
Objection Comment
Mr dawinder Singh-Objects-2 Sorrel Green Leamington(FULL)
Objection Comment
Mr Jason Kimpton-Objects-54 Lionheart Avenue Bishops Tachbrook Leamington Spa(FU
Objection Comment
Mr John Watkins-Objects-2 Carter Drive Barford Warwick(FULL)
Objection Comment
Mr Martin Drew-Objects-60 Kingsley Road Bishops Tachbrook Leamington Spa(FULL)
Objection Comment
Mr Richard Bartlett-Objects-38 BalsamLane The ASPS Warwick(FULL)
Objection Comment
Mr Richard Ward-Objects-39 Ansell Court Ansell Way Warwick(FULL)
Objection Comment
Mr Rohit Auluck-Objects-6 Hareway Lane Warwick(FULL)
Objection Comment
Mr Sam Oakes-Objects-18 Brooklime Rod Warwick(FULL)
Objection Comment
Mr Steve Goult-Objects-15 Parsonage Close Leamington spa(FULL)
Objection Comment
Mrs Angela Watkins-Objects-2, Carter Drive Barford Warwick(FULL)
Objection Comment
Mrs Jenny Bevan-Objects-Bishops Close Bishops Tachbrook Leamington Spa(FULL)
Objection Comment
Mrs Paula Yates-Objects-4 Brooklime Road Warwick(FULL)
Objection Comment
Mrs Sangita Emmett-Objects-12 Tamora Close Heathcote Warwick(FULL)
Objection Comment
Mrs Shruthi Patil-Objects-Balsam Lane 51 Warwick(FULL)
Objection Comment
Ms Cara Houghton-Objects-20 Saffron Way Warwick(FULL)
Objection Comment
Ms Jade Forrester-Objects-42 Lionheart Avenue Leamington spa(FULL)
Objection Comment
MULTI PAGE - ES APPENDIX 1.2 PARAMETER PLANS
Drawing
MULTI PAGE - NTS APPENDIX 1.3 PARAMETER PLANS
Drawing
Natural England response
Consultation Response
NTS APPENDIX 1.1 LOCATION PLAN
Site Location Plan
NTS APPENDIX 1.2 ILLUSTRATIVE MASTERPLAN
Site Location Plan
NTS APPENDIX 1.4 DOCUMENT SCHEDULE
Supporting Report
PLANNING STATEMENT V21
Supporting Report
PROPOSED EASTERN ACCESS
Drawing
PROPOSED RIGHT TURN LANE ACCESS
Drawing
PUBLIC OPEN SPACE STATEMENT V1
Supporting Report
RESIDENTIAL TRAVEL PLAN
Supporting Report
Sport & Leisure [calculator]
Consultation Response
Sport & Leisure [EXCEL spreadsheet]
Consultation Response
Sport & Leisure [response]
Consultation Response
STATEMENT OF COMMUNITY INVOLVEMENT FINAL INC APPENDICES PART 1
Supporting Report
STATEMENT OF COMMUNITY INVOLVEMENT FINAL INC APPENDICES PART2
Supporting Report
TRANSPORT ASSESSMENT
Supporting Report
Utilities Report P02
Supporting Report
UTILITIES REPORT P02 APP A FRAMEWORK PLAN
Drawing
UTILITIES REPORT P02 APP B UTILITY CONSTRAINTS PLAN FRAMEWO
Drawing
Utilities Report P02 App C Budget Quotation.
Supporting Report
Waste Management
Consultation Response
Waste Management
Consultation Response
Water Officer-Neutral-Nuneaton Fire Station Newtown Road Nuneaton(FULL)
General Comment
WATER OFFICER-NUNEATON FIRE STATION NEWTOWN ROAD NUNEATON(FULL)
Consultation Response
WCC ARCHAEOLOGY
Consultation Response
WCC Ecology
Consultation Response
WCC Flood Risk Management
Consultation Response
WCC Highways Authority
Consultation Response
WCC Infrastructure Delivery Team
Consultation Response
WCC Landscape
Consultation Response
WDC Policy Team
Consultation Response