25/09303/FULL
City of Westminster
Status
Pending
House extension
Received
23 Dec 2025
New homes
0
Full proposal
Reposition the front elevation of the two-storey side extension, to align with the main dwelling-house; replace some internal doors with new traditional timber doors; replace the existing stair from lower ground floor to upper ground floor, with a traditionally detailed timber stair; waterproof lining to lower ground floor; additional joinery pieces; and rationalisation of Rainwater Goods to improve the external elevations. (Linked to 25/09304/LBC)
Documents
PLANNING COMPLIANCE NOISE IMPACT ASSESSMENT REPORT
Noise impact assessment
Not yet archived
· Original link
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.