PL/2026/00298
Wiltshire Council
Status
Pending
Infrastructure
Received
15 Jan 2026
New homes
0
Full proposal
A new duct will need to be installed; a Basement Box will be fitted on the side of the block. External grade cabling will travel along catenary wire, at a high level to reach the external flats and entrance. A CSP box will be installed near each external flat door, ready for future connection. For the internal flat, invisilight cabling will be used and will run in the crease of the ceiling to reach each flat and in new PVC trunking. A Point of Entry Box will be installed above each flat door.
Documents
Have your say
Your comment matters. Councils must consider every representation that raises material planning considerations.