← Back to application

Proposal

Observations on a proposed development within the adjoining Borough of City of London with respect to: 'This development is proposed to be a phased development (phase 1: demolition, phase 2 construction) comprising: the demolition of the existing buildings, partial retention of the existing basement (including creation of a mezzanine) and construction of a new building for office use (Class E(g)), flexible office/community use (Class E(g)/F2), flexible cultural/event uses (Sui Generis) and flexible retail/service/food and beverage uses (Class E(a)-(c)); comprising a basement level, ground and 20 upper storeys plus roof plant level; creation of new public space and new pedestrian routes at ground level; hard and soft landscaping; pedestrian and vehicle access; blue badge car and cycle parking; ancillary servicing, plant and other back of house space; excavation to accommodate attenuation tank beneath existing basement slab, external alterations and demolition to the south elevation of the adjoining Porter Tun Room of the former Whitbread Brewery; associated highway works, enabling works and other works associated with the development.' AT: 1 Silk Street, London, EC2Y 8AL (for 25/00829/FULEIA) AND 'External alterations to the south elevation of the Porter Tun Room of the former Whitbread Brewery in connection with the development at 1 Silk Street. Demolition of the brick casing and removal of services and a vent belonging to 1 Silk Street, fixed against the brewery building elevation, including making good of any existing brickwork.' AT: Porter Tun Room, The Brewery, Milton Street, London, EC1Y 4SA (for 25/00830/LBC).

Your comment matters: Submitting a representation helps planners understand community views and shapes the final decision.

Draft your email